Statistics
Users
  Total:26,322
  Visited Last 30 days:69
Forum Messages
  Total:20,418
  Last 30 days:3
Forum Evaluations
  Total:24,009
  Last 30 days:0
Journal Entries
  Total:4,562
  Last 30 days:8
Connections
  Total:14,764
  Last 30 days:19
Downloads
  Total:70,104
Journals
Name Visits Posts Pics Videos

Barrel-Race7,116791630
YesterdayHouston, TX

Cobbler-Mountain-Hom...20100
MondayAlexandria, VA

Vilano-Beach--Water-...21,220391170
4/5/2014Saint Augustine, FL

HudsonHouse7,032300
4/2/2014Omaha, NE

Tanglewood86,8707862,22242
3/24/2014Colorado Springs, CO

697MarlinAustinArea1,20518910
3/15/2014Austin/McDade, TX

1860s-Texas-rehabnew...43,175441910
3/14/2014Boerne, TX

Bladenkirk543640
3/13/2014White Oak, NC

P-Wade-Crocker432100
3/12/2014Spring, TX

Shana510200
3/11/2014Chaffee, MO

OwensNewHome60,0591033810
2/2/2014Chandler, AZ

Du-Lock-Lane1,316200
2/1/2014Houston, TX

Family-Affair10,624440
1/31/2014Saint Petersburg, FL

TheCastle10,006270
1/23/2014Cheshire, CT

The-Last-Rodeo9,69027100
1/14/2014Angel Fire, NM

TheHoskensProject58,5771504333
12/31/2013Dome-ville, central, FL

NorthPoleHome30,266341330
12/29/2013North Pole, AK

navarre-village-buil...1,197100
12/26/2013Gulf Breeze, FL

Seven-Peaks-Faswall-...34,874483181
11/18/2013Graeagle, CA

The-Dailey-Project1,787100
10/27/2013Pompano Beach, FL

Beaver-Creek-Ranch30,330213210
10/15/2013Hayfork, CA

The-Cortes-Adventure17,704520
10/14/2013Snowflake, AZ

jeff3,886300
8/29/2013Jackson, MO

Miami-FL-country-hom...5,392320
7/30/2013Miami, FL

Brevard-County--Pt-S...2,571100
7/17/2013Rockledge, FL

Dream-Build-Austin-T...4,177300
4/17/2013Austin, TX

Eschete-Dome22,42430530
12/24/2012Lafayette, LA

ChapelHillNCBob5,581110
10/23/2012Chapel Hill, NC

The-Skimino-Bluff6,9963130
10/13/2012Williamsburg, VA

Octagon-in-Glencoe-C...48,843144110
10/8/2012Glencoe , CA

nateshomemtpeakview4,689100
9/29/2012

sherman20,073221560
9/27/2012Downers Grove, IL

Omaha9,204380
9/13/2012Omaha, NE

Holy-Hill-House16,52235530
8/27/2012Richfield, WI

Omega-CEO5,649110
8/13/2012Manassas, VA

JayHouse10,3557190
6/22/2012Sebastopol, CA

30233,42523770
5/20/2012Belfair, WA

SunburnStateHome6,329110
3/6/2012Charlotte County, FL

VICTOR-MONTANA8,126110
2/22/2012Victor, MT

Houston-720125966,813100
1/21/2012Houston, TX

Workshop15,622630
1/8/2012Florissant, CO

Our-simple-home11,843223080
12/5/2011LaPorte, IN

ICF-Construction19,412500
11/11/2011Elkridge, MD

Little-Help-from-my-...12,30311150
11/4/2011Rockwall, TX

YaNYca14,028810
10/29/2011Boston, MA

The-Man-Refuge10,872310
10/19/2011San Antonio, TX

mckernanmc11,174320
10/6/2011Amite, LA

Large-Family-Compoun...7,461200
9/23/2011Covington, GA

Woodchuck-Ridge10,331480
9/12/2011Akron, OH

Forever-Home-Sweet-H...20,99834310
8/24/2011Issaquah, WA

Clarksville-MD9,105200
8/22/2011Eldersburg, MD

steve-n-carolyn16,3514140
8/21/2011Sun City, CA

Old-York8,197200
7/27/2011Bridgewater, NJ

Carriage-House17,11120282
7/24/2011Ft. Collins, CO

DomeSweetDome22,35918291
6/4/2011Suffolk, VA

Goodpasture24,235562880
5/28/2011Westminster, CO

Marks-Log-Cabin13,949392210
5/12/2011Altoona, PA

Bill21,189100
5/4/2011Tucson, AZ

Mueller-Dream-Home8,829100
4/15/2011

Oklahoma-Steel10,778650
4/13/2011Minco, OK

DutchG8,444200
4/5/2011

HiddenInOhio10,3409130
4/1/2011Elyria, OH

MagnoliaHouse8,894100
3/29/2011Houston, TX

Buffaloader13,764200
1/11/2011Valley Center, KS

SouthernEcoHome27,87620210
1/9/2011Blacksburg, VA

Austrian-Chalet14,183780
1/2/2011Twin Lakes, CO

Vista-Ridge13,20921660
12/21/2010Swanton, OH

OurFarmstead28,496601890
12/10/2010Pennsylvania

AirparkHome-Remodel29,67922460
11/8/2010Hillsboro, OR

Holloway10,898200
11/7/2010Petersburg, VA

Building-Our-Lakefro...9,778110
11/5/2010Piscataway, NJ

SunburyGalena-Build9,046100
11/3/2010Galena, OH

BUILDING-OUR-GREEN-D...9,899800
11/2/2010Pattison, TX

RR-Homestead24,02731740
10/26/2010Janesville, CA

Casa-Paradiso-Vieque...9,855200
10/19/2010Chelsea, MA

Millerbuild11,1255110
10/1/2010Carstairs, AB

Delisledigs11,537300
9/16/2010Jacksonville, FL

h20dave11,367430
9/10/2010Waterloo, AL

Mountain-Idyl11,110900
9/9/2010Asheville, NC

High-over-Lake-Granb...14,59812230
9/8/2010Granbury, TX

Homestead35,98964850
9/8/2010Smithville, MO

philandjan12,969100
9/2/2010

Commons10,195200
8/21/2010Atascocita, TX

Our-First-OB-home10,584300
7/27/2010Gardner, KS

Louisiana-Mediterran...20,138311870
7/21/2010Sunset, LA

Crows-Nest9,869100
7/20/2010

Patterson-Project10,432400
7/16/2010John's Island, SC

Hidden-Meadow-Home12,4722100
7/13/2010Murrieta, CA

New-house-in-Selah-W...10,225140
7/4/2010Belfair, WA

Arnold-CA-Alpine-cha...20,95722100
7/2/2010Arnold, CA

Working-Wilton39,932343010
6/16/2010Wilton, NH

JJ-Residence9,648100
6/7/2010San Antonio, TX

Thompson-Valley-Home10,844330
6/6/2010Monticello, FL

Naperville-Webster-S...26,4062360
5/21/2010Naperville, IL

Gary--Suzi11,088100
5/7/2010

crystal-falls-home28,87720270
5/5/2010Cedar Park, TX

Kapoho-Retirement-Ho...10,919130
5/4/2010Santa Ana, CA

NC--New-Construction10,516100
5/3/2010

Collins-on-Cobblesto...11,51921910
4/30/2010Waynesville, NC

Dwight--Colleen-Hart...11,925130
4/30/2010Vaughn, WA

Riley32,86232950
4/29/2010Cave Creek, AZ

The-New-Ries-Homeste...14,92119980
4/21/2010Polk/Richfield/Erin/Hartford, WI

The-Season9,562130
4/10/2010Mount Airy, NC

The-Naas-Place10,071200
3/30/2010Pittsburg, CA

Phil-and-Lauras-home13,121400
3/20/2010Tulsa, OK

Southport-NC-Home17,575201281
3/18/2010Southport, NC

Loris25,046110
3/11/2010

Seaton-Station10,268140
3/10/2010Siloam Springs, AR

Backwoods-Project14,324390
3/4/2010Jeffersonville, GA

ICF-in-Ann-Arbor26,258293710
1/25/2010Dexter, MI

DancingPines11,012200
1/25/2010Clinton, LA

Log-Cabin10,613150
1/23/2010indianapolis, IN

The-Kinzel-House10,009100
1/21/2010New Orleans, LA

PahrumpProject17,0905390
1/17/2010Spokane, WA

TheBeachHouse14,66313200
1/16/2010Shoreline, WA

Artist-Haven-Home14,975970
1/13/2010Kansas City, MO

SOPHIA--SAMUELDELAWA...17,43911310
12/2/2009Smyrna, DE

Plant-City-Craftsman16,8554100
11/22/2009Plant City, FL

WestermanFarm11,473130
11/10/2009Dickson, TN

Shane22,549600
10/31/2009San Antonio, TX

ADCountryHome12,8981130
10/31/2009Fort Worth, TX

ICF-Keller-Tx51,251321220
10/6/2009Roanoke, TX

digs24,272100
9/30/2009Tracy City, TN

threegables21,431201340
9/29/2009Hartland, WI

LittleLakeCorner72,9601016040
9/29/2009Groveland, FL

Utah-Casa11,618200
9/28/2009Saratoga Springs, UT

Tornado-Reconstructi...11,063800
9/24/2009Port Neches, TX

toolehouse50,347891450
9/20/2009Reno, NV

Bobs-Blog53,036614140
9/16/2009New Florence, PA

Blessings10,231100
9/11/2009farmville, NC

Schrammelot16,0217900
9/11/2009Pierson, FL

PennsmithLostValleyT...35,904552150
9/9/2009Dripping Springs, TX

River-House10,667220
9/7/2009Clinton, NJ

SantaFe-in-AJ10,418100
8/28/2009Apache Junction, AZ

Dennis-Dream-Home30,101385050
8/27/2009Readington Twp, NJ

Massive-Undertaking11,5671100
8/26/2009Wimauma, FL

Lafayette10,322200
8/11/2009Cramerton, NC

Dream-site-on-the-La...11,109200
8/5/2009La Porte, TX

Williams-New-Home-Si...10,365110
8/2/2009Windsor, NC

Cobblestone-Lane10,451100
7/30/2009Great Falls, MT

PensacolaBeachHouse10,258110
6/22/2009Gulf Breeze, FL

12YEARSINTHEPLANNING10,906120
6/16/2009LADSON, SC

Steinys-Hideaway10,876200
6/9/2009Venice, CA

DreamHome29,525261900
6/7/2009Orlando, FL

CastleHeims20,79621590
6/5/2009Cedar Rapids, IA

Utah-Warehouse10,129220
5/20/2009Fairview, UT

Where-to-start12,469610
5/16/2009Lemoore, CA

Castle-Rock-Lakehous...16,38310840
4/27/2009Necedah, WI

Oleg26,023360
4/22/2009San Diego, CA

MoeCompound10,296340
4/9/2009Camano Island, WA

Huckleberry-Home10,361200
4/8/2009Williamstown, NJ

Vonk24,293100
4/7/2009Zeeland, MI

Small-Timber-Frame14,708110
4/2/2009Central Mass, MA

EatonLoch-Haven11,155110
4/1/2009Roanoke, VA

windowsnsiding10,226110
3/28/2009Long Island, NY

Arkansas-First-Timer25,92339880
3/27/2009Trumann, AR

Back-Home-In-Crisp12,454111510
3/22/2009Ennis, TX

Victor--Susan-0820,373211210
3/17/2009Ruckersville, VA

Rick-and-Tinas-dream...11,686120
3/14/2009Auburndale, FL

Keener-Road13,0764100
3/11/2009Elizabethtown, PA

NC-Newbie10,977100
3/10/2009Boone, NC

MadisonGA11,1981130
2/26/2009Madison, GA

Techbuilt-Scammed12,643100
2/25/2009Rebew, LA

choanne83110,243100
2/9/2009charlotte, NC

WilliamsinVegas34,042301190
1/29/2009Henderson, NV

PhilesBryant12,090260
1/20/2009graham, WA

MortgageSmart10,460100
1/19/2009Cocoa, FL

QuarterlyHouse57,981136990
1/12/2009Orlando, FL

RabbitRun19,804311690
1/11/2009Afton, VA

Sonave-Sunsets10,567120
1/9/2009Yucca, AZ

Heart-of-PA16,1709160
1/6/2009Lewistown, PA

Krusehome11,640200
12/27/2008Lake City, FL

BrunkHouseAlmaKansas15,655260
12/26/2008Garden Grove, CA

Raider-Bills-Tenn-Ho...14,6586320
12/22/2008Largo, FL

Andel-Ranch28,341334020
12/17/2008Rogers, TX

Elijahs-Home11,823460
12/6/2008Vero Beach, FL

ranch-house10,460100
11/25/2008springfield, IL

Howard-Georgia-Retir...16,103670
11/9/2008Harlem, GA

The-Woods-Journal11,334110
11/6/2008Doraville, GA

StansTLH16,0691090
11/1/2008Tehachapi, CA

Kevin--Kerrys-Dream11,601350
10/17/2008Northvale, NJ

Katabatic-Wind12,206470
10/16/2008Huntsville, AL

Elmhurst-Modern13,658120
10/14/2008elmhurst, IL

Accessible-House11,6283100
10/14/2008Munford, TN

Cherry-Valley-Vista10,686120
10/5/2008Duvall, WA

Jon-and-Mollys-House18,309150
9/25/2008Ellicott City, MD

Proctor-ICF11,763110
9/25/2008Fredericksburg, VA

Hawaiian-Bungalo18,097111020
9/23/2008Holualoa, HI

Pete--Rhiannon12,765430
9/19/2008Springfield, MO

2008-Cedar-Ln17,60714350
9/19/2008Seaville, NJ

dmaceld20,80214880
9/16/2008Nampa, ID

Help-with-Goulds-and...12,927100
9/16/2008tampa, FL

Consulting10,326100
9/2/2008Orlando, FL

AlaskaICFREMOTEHouse16,75819380
8/17/2008Wasilla, AK

NC-Pond-House11,804320
8/4/2008Wilmington, NC

MargaritaVilla11,412240
8/4/2008Raleigh, NC

Latest-update12,7018100
8/4/2008Sierra Vista, AZ

ANDREA11,300400
8/2/2008Dallas, TX

The-Ridges14,07811130
7/31/2008Logan, UT

Avenida-Del-Sol15,20013520
7/31/2008Peoria, AZ

dream-home-ohio11,360600
7/30/2008Zanesville, OH

Penetang-Craftsman10,989360
7/27/2008Penetanguishene, ON

Tristan--11,443600
7/25/2008Lebanon, NJ

Dreamy-Design-in-Glo...16,742100
7/9/2008Clifton, VA

need-help-Jim11,927110
7/8/2008Bandon, OR

deltona-fl-custom-ho...12,5204140
7/6/2008Deltona Beach, FL

Ingraham-House-Chape...11,771200
6/29/2008Cary, NC

famborgie10,677100
6/26/2008Lockhart, TX

95821-Addition21,9437140
6/24/2008Sacramento, CA

Cajun-Homestead19,08312930
6/22/2008Lafayette, LA

West-Texas-Ranch-Hou...12,877110
6/18/2008Andrews, TX

Quail-Bluff-Pasco12,6869290
6/10/2008Pasco, WA

Spyders-Web10,596100
6/10/2008Norman, OK

mike-and-tori-darnle...13,120510
6/2/2008Rainbow, CA

Lin-Washington10,621100
5/29/2008Fresno, CA

Capernall-House11,467420
5/15/2008Belleville, MI

Hidden-Valley-Texas10,763100
5/7/2008Southlake, TX

cosdreamhome41,431731470
5/5/2008Colorado Springs, CO

Sowle-Family-House13,263590
4/29/2008South Burlington, VT

Cyberdoc-Residence10,973200
4/25/2008San Diego, CA

Fortune-House10,990100
4/17/2008Mooresville, NC

Joeb28,845400
4/15/2008Oakland, FL

Alvin-House11,239200
4/14/2008LaPorte, TX

Thomas-Home--Raintre...21,300271800
4/9/2008Lee's Summit, MO

Greg--Kathys-New-Hou...12,235200
4/3/2008Barryton, MI

Where-is-Waldo28,35044830
4/2/2008Marion, OH

Nimmerrichters-Fores...10,086100
4/2/2008Waldorf, MD

Mayfield-House10,699100
3/31/2008Mayfield, UT

beamanhouse10,761100
3/27/2008Manistique, MI

Kanak-ICF--Virginia15,524900
3/26/2008Fredericksburg, VA

Sheldon-St15,356300
3/21/2008Orlando, FL

Bert-25,971310
3/20/2008Southern, CA

Our-Ohio-ICF-home22,03620270
3/20/2008Mansfield, OH

ericdc11,233310
3/8/2008Uniontown, PA

EurekaHouse-ICF15,1165150
3/6/2008Berkeley, CA

Superstition-Views15,433281600
3/6/2008Mesa, AZ

Blue-Springs-Project12,9218230
2/24/2008Broken Arrow, OK

Our-House10,596100
2/24/2008Miami, FL

httpownerbuilderbook...13,342830
2/19/2008Clayton, NY

JourneyBackHome10,427100
2/3/2008Oviedo, FL

Collier-Home12,887110
2/1/2008Little Rock, AR

DDs-ICF12,430330
1/27/2008New Smyrna Bch, FL

EurekaMT-Timberframe12,0521430
1/24/2008Augusta, MI

The-Larnerd-House13,5345210
1/21/2008Newport News, VA

Casa-Bella11,375100
1/14/2008Pueblo West, CO

Gordon-Lake-House15,40117510
1/3/2008Oakland, IA

STEPHANIES-DREAM12,57417570
12/30/2007Lower Burrell, PA

Florida-Waterfront-C...14,974310
12/29/2007PB, FL

6158-in-Montgomery-T...11,323410
12/23/2007Conroe, TX

ClearwaterHills13,742260
12/14/2007Paradise Valley, AZ

BobDonna10,012100
12/12/2007Sacramento, CA

AboveTheAppleTree9,989100
12/8/2007La Farge, WI

Casa-Nostra12,254230
12/2/2007Bangor, PA

Building-the-Dream-i...13,795700
11/29/2007Gladstone, OR

Ingram-Fleming-ICF-H...16,399480
11/29/2007Plant City, FL

inniagara9,479100
11/24/2007Niagara Falls, ON

SchnabelEstate10,607240
11/16/2007Avon, IN

WeAreBuildingAgain21,44527560
11/15/2007Orlando, FL

Lake-Pleasant10,572210
11/14/2007Erie, PA

Green-for-Dean10,581100
11/10/2007San Jose, CA

The-Ponderosa12,3558220
11/4/2007Perry, OK

FlagholeRoad10,651260
10/25/2007Franklin, NH

Beckynray11,810300
10/24/2007Powhatan, VA

Spicewood-TX12,295330
10/20/2007Austin, TX

Powderhorn24,206481760
10/4/2007Florida

Luray-VA-1stTimeBuil...14,872730
10/4/2007Luray, VA

kittyfhughesnet10,360250
9/27/2007Noblesville, IN

Scott-Family10,936100
9/25/2007Trinity, AL

Taking-the-Plunge13,4356180
9/18/2007Springfield, OH

RozBuildingAdventure10,814100
9/14/2007San Pablo, CA

Helpful-Tips11,909200
9/13/2007Encinitas, CA

Poplar-Creek-Farm13,8535250
9/10/2007Oakland Park, FL

TheWillemsHome21,5821750
9/10/2007Galloway Township, NJ

ComfortHome11,386200
8/30/2007Dublin, OH

10000-sq-feet36,37422260
8/26/2007La Habra Heights, CA

Bird-house12,5123400
8/22/2007Ithaca, NY

Circle-S_ICF_House35,836462640
8/21/2007Sparta, IL

New-England-Saltbox10,789100
8/16/2007Columbia, SC

RamblewoodatJeterFar...11,6066330
8/10/2007Kansas City, MO

Kraemer-Collinwood-H...11,201200
7/21/2007Delano, MN

BigOakBuilderTX14,827270
7/20/2007Wharton, TX

Johnson-Family-Dream11,048100
7/20/2007Normal, IL

19225-ROBERTSON-ST17,74214250
7/12/2007Orlando, FL

Thattle-Dew-Farm10,999220
7/12/2007Halls Harbour, NS

WindyJ14,98111260
7/2/2007Knoxville, TN

Vistoso-Green-Home12,298310
6/28/2007Tucson, AZ

Lewis-Chapel-House16,511200
6/25/2007Dunlap, TN

father-daughter10,551200
6/25/2007Loveland, CO

davewhite11,532100
6/24/2007Nanaimo, BC

NutmegWedgefieldOrla...12,515600
6/22/2007Orlando, FL

4600SF-Dream-Home-in...14,612410
6/19/2007Mooresville, NC

Coeur-dAlene-Idaho-H...12,383240
6/13/2007Coeur d Alene, ID

Tampa-Bay13,963490
6/10/2007Ruskin, FL

Dream-In-Progress14,411540
6/7/2007Shawnee, KS

todd-in-tullahoma10,920100
6/4/2007tullahoma, TN

TheOwens11,702300
6/1/2007Dickson, TN

Country-Cleaver11,832140
5/29/2007Springfield, IL

South-Dakota-Lake-Ho...12,0916110
5/23/2007Sioux Falls, SD

Gods-Home11,237200
5/18/2007Eustis, FL

hammock11,094110
5/14/2007Martinez, GA

Grove-St-Rocklin11,177300
5/13/2007Orangevale, CA

Gardeners-Delight12,007330
5/13/2007Norristown, PA

Newman-Family12,025100
4/26/2007oralndo, FL

do-over-house12,683200
4/25/2007Roseville, CA

Mountain-Building11,404370
4/21/2007Hiawassee, GA

Alaskan-Log-Home12,728120
4/15/2007Tok, AK

Warner-Dream12,926600
4/11/2007Astatula, FL

RehmannSchreiner13,92118150
4/2/2007Maple Grove, MN

outspokenbikeguy13,5624140
3/29/2007Sanford, FL

SmelltheForest35,854471480
3/23/2007Colorado Springs, CO

PolkCityProject15,2177110
3/21/2007Norcross, GA

DwaynePam12,060200
3/21/2007Normal, IL

cypressknoll11,130100
3/20/2007Palm Coast, FL

candlepower19,151241550
3/20/2007Lansing, IA

Team-Rosa11,996200
3/19/2007Springfield, VA

GLOUCESTER11,677120
3/17/2007Newport News, VA

Ohiodreamhome12,0584140
3/16/2007Reynoldsburg, OH

Gypsy-Love12,543110
3/12/2007Highland, NY

Forrest-Towne11,739220
3/10/2007Brinnon, WA

Dreams-Come-True11,005100
3/8/2007Glen St Mary, FL

Almost-A-Country-Gir...11,016100
3/7/2007Addison Township, MI

BrandonBuildingBlog11,794100
3/4/2007Layton, UT

SafecreteHouse13,057300
3/4/2007Raleigh, NC

newbie-12,171100
2/21/2007North Plains, OR

BuzzardsNest14,406310
2/14/2007Saint Lucie, FL

woodfamilyhome12,516200
2/10/2007Keno, OR

vegascastle11,837100
2/3/2007Henderson, NV

newsteel17,809100
1/28/2007Florence, SC

Dream-Home-200712,351100
1/27/2007Gwynn Oak, MD

DelgadosAdobeAbode12,742200
1/18/2007San Diego, CA

bobindeltona14,971250
1/14/2007Deltona, FL

Highland6412,450300
1/8/2007New Orleans, LA

SmallProjectSilverSp...17,8051020
1/7/2007Silver Springs, NV

BeehlerHome22,72811640
1/3/2007Kalamazoo, MI

eveningshade12,050110
12/25/2006Evening Shade, AR

Bruce in Petrolia, O...11,180120
12/21/2006Petrolia, ON

smahmud11,507100
12/18/2006Alexandria, VA

1000-hours-to-liftof...12,616100
11/25/2006Uniontown, OH

FettConstruction12,671460
11/24/2006Vincennes, IN

Northeast-Ohio-Home12,782100
11/10/2006Parma, OH

Buchanan-Mountain18,58214590
11/1/2006Dickson, TN

Our-Future-on-Badin-...12,785100
10/24/2006New London, NC

nowi-fe-haven11,823100
10/22/2006Griffin, GA

klonus11,994100
10/16/2006Madison, WI

OurAddition17,443100
10/13/2006Chuluota, FL

bigal13,022100
9/30/2006Whittier, CA

Stella-Maris-II12,678100
9/11/2006Orlando, FL

Lake-House14,195100
9/6/2006Kansas City, MO

My-First-House25,982100
9/5/2006APO, AE

Angie-Mossy-Oak-Acre...15,736740
8/15/2006Lake Helen, FL

Peaceful-Valley-in-M...12,657100
7/23/2006Republic, MO

Lake-Wales-Fl12,734100
7/17/2006West Palm Beach, FL

JohnKat13,216110
7/16/2006Fort Worth, TX

Cedarcrest13,834100
7/15/2006Sparrows Point, MD

MRailey14,055100
7/13/2006Dallas, TX

Villa-Di-Capri-Hacie...17,421100
7/10/2006Hacienda Heights, CA

New-2-This17,0074370
6/26/2006Stafford, VA

End-of-the-Road13,576100
6/26/2006Homer, AK

shapiro12,753100
6/21/2006Camp Verde, AZ

ShangriLaw14,062100
5/27/2006Lebanon, IN

Kokinos-ICF-Project15,282110
5/16/2006Los Gatos, CA

Jennifer-and-Darko13,369110
5/8/2006Holly Springs, NC

LeFamily13,873100
4/29/2006Irvine, CA

jrh29,279110
3/25/2006North Bend, WA

Pete-Maniscalco13,993100
3/8/2006Welton, AZ

H3brewing14,432110
3/2/2006Cleveland, MO

85-Hall-Ln17,0291000
3/1/2006

Michigan-Owner-Build...15,3856130
11/13/2005Ray Twp., MI
See all journals...
Current Top-Rated Posters
RatingPosts
Lists
Name Items
4 year plan list2
Cabinets2
fabric structures2
Faucets2
Georgia builders?2
Granite countertops2
House Features2
Initial thoughts2
next step9
Questions I need ans...3
Tanglewood Punch Lis...23
To Do - Interior16
To Do Exterior7
Water / Sewer2
Home The Book Bookstore Forums Construction
Journals
Owner-Builder
Connections
Resources

 


I look forward to more responses. This site is chock-full of good info.
Kerry in Newport News, VA

Forums Home  >>  Kenneth
Construction Bargain Strategies  >  Start with a guest house to get on site?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 8/1/2008

This is a good question, I am surprised you haven’t had more response. I would agree that being very close is important for O-Bs, especially if you are home during the day and basically on-site. However I am not sure I could home school and build a house at the same time, but what an educational opportunity for your children as to project management, basic construction techniques, trades and potential career opportunities, budgeting, using computers (spreadsheets, scheduling tools, etc.) and the like – this is like shop class combined with vocational/technical school yet both on steroids.

 

If you finance that guest house/garage/workshop you won’t exactly be rent free when you are living there. I would ask if you will benefit from long-term value out of that space commensurate with the level of investment you are putting in to it. If I were looking to build a small house just to be close by the construction site, and I needed a guest house, then that is a great phasing of your construction house. However if I had no need for that guest house then I would definitely consider other options. Is there some place closer I could rent? Could I use a modular unit instead, this modular unit could be easily removed and sold to someone else and thus recover at least part of my investment (perhaps much of my investment if I buy smart).

 

You mention that you might later convert this space to a workshop or garage, but a workshop or garage is definitely built to a lower standard than some place I might like to live through either a summer or a winter, and overbuilding it is really just money down the drain.

 

If a permanent small structure is your best alternative, I would look at what I could incorporate into the temporary house that I could reuse in my larger build. For example, I might include RTA kitchen cabinets in my small structure that I could remove and reinstall in a utility or laundry room in my larger build.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 8/1/2008

Power yes, but maybe not water (I would guess you would want to have your primary house directly to the main). And while you would have toilet facilities, do you want your primary living space to be the rest room for all of your construction workers?


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 8/1/2008

Taking your time will work only if your building department and financing are in order. In my area, once you start excavation you have a finite amount of time to get that COA. Go over that finite amount of time, and you get to start submitting schedules, workplans, etc. showing how you intend to get that COA. They don't like partially finished structures mucking up the landscape.

As to financing, I would guess that most banks want to see you get that construction loan converted to a mortgage as well. I know when I built (as a GC), the bank I used didn't have a timeframe as it is not uncommon for a GC to build a house in a tract subdivision and use it as a model for several years. Bonus here also was that no monthly payments were due on the construction loan either (they would just roll the interest into the balance). However the bank inspected my house more often than the building inspectors, they really do want to see progress.


Construction Bargain Strategies  >  Getting HD/Lowe's, etc. to match prices?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 10/14/2004

The best way to buy lumber is just like anything else. Define what you want, put it down on paper, and give it to suppliers to bid it out. Get the delivered cost, as you will use a lot of lumber and unless you have a semi, you don't want to haul it. I found that Home Depot had excellent prices on lumber. I bid it out to several lumberyards only, and most of them couldn't even match Home Depot prices. Once you have your quantity takeoffs, simply arrange the quantities so they can price them easily and fax them to every lumberyard you can find in the phone book - they will provide bids promptly. From talking to the local carpenters I know, the downside is that they said they don't like to work with Home Depot lumber simply because it comes from them, and they prefer to support the local lumberyards.

I did, however, find one lumberyard that beat Home Depot. In addition, they gave me 3-15, net 30 terms (3% discount if I pay within 15 days of invoice) since I set up a new business charge account with them, (I established myself as a GC with a license; they don't need to know I am only building one house, and actually I may continue). They gave me 15% off my total lumber order if I paid for it all at once (vs. packages as they were delivered, e.g. basement-wall package, first-floor package, first-floor wall package, roof package, etc.).

Home Depot said that if anyone beat their lumber prices, to bring in the bid and they would beat them by 10%. I didn't take them up on this offer, as I would prefer to support the local guy when I can, and they really did "earn" the lumber package when everyone was on a level playing field. In addition to just lumber, I also got a former framer who was willing to help me with some details and expertise - Home Depot couldn't have done this for me. I was also concerned that the lumber that was delivered would be warped, twisted, or bowed material, but I received great lumber with almost no waste - perhaps once again it is because I am a new account (I have another shipment coming, maybe I will change my mind after this one).


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 10/14/2004

In my locale, you are allowed to O-B, but local regulation restricts them from issuing building permits to anyone except licensed builders. You have to be a licensed electrician to pull an electrical permit (typical), unless you are working on your own house, then you can pull your own. With construction though, it is licensed contractors only. It is basically a revenue enhancer for their tax base, but all I had to do was apply for a GC license and I got one. Conveniently I got it the same day I pulled the building permit. In my locale, they issue one building permit for all trades, so I don't need a separate plumbing, electrical, HVAC, etc., saving my subcontractors at least some work. So, I paid my $30 and now I am a licensed GC - go figure.

I have used this $30 investment to my advantage. This opens so many doors to so many suppliers. Some worthwhile, others I could easily beat their prices or service. The best thing it opened for me was suppliers trying to establish an ongoing relationship with a new business (winning a new customer is a lot more difficult than maintaining an existing customer), financing (I now qualify for trade financing), insurance (I am now a company), and invoices (I don't have to worry about cash accounts or bank draws for small orders; I get invoiced later). Some suppliers would much rather deal with businesses than individuals. My truss supplier for example, if I am building my own house I have to pay cash or bank draw when I order my trusses. Since I am a company they invoice me 30 days after I order, and then give me 2-15/net 30 terms. I pay less as a company than I do for cash, go figure. And the best part is my floor trusses needed some field repair, and since I hadn't paid for them yet, I felt like I had more leverage.

Your locale very likely has different requirements to obtain a GC license. One call to the local permitting authority will give you all of the answers you need.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/6/2005

I have had the same experience when getting the local Home Depot to match prices. They will only match sources within a 25-mile radius of the store I am in. This is not just Home Depot, but Lowe's too.

My ICF contractor needed lumber for various reasons (bracing, window bucks, etc.) and thought he could go to the Lowe's closest to him, pay for the lumber, and then pick it up at the Lowe's closest to me (or alternatively, have the Lowe's closest to me deliver it). The Lowe's closest to him was consistently lower price than the one close to my construction site. Lowe's would not allow this; he had to pick his lumber up where he paid for it. This is interesting, because he operates a crew that only does subcontract work for Lowe's (you pay Lowe's to install a door, his crew and not Lowe's employees are who actually does the work). I found it especially odd that they treat their own subcontractors that poorly, much less everyone else at the "pro" desk.

I found a smaller local lumber company that had no problems beating the big-box prices, beating their service, and delivered great lumber.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/10/2005

You can ask any of the employees for coupons; they all have them to distribute.

It is easier to just get them from ebay.com. Search for "Home Depot coupon" and you will get more hits than you need. eBay is an unlimited source, too; no sense not always having a couple.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/12/2005

Suppliers keep tabs on registered GCs. By getting my GC license, I have found myself on plenty of mailing lists inviting me to "Contractor Appreciation Days" from a multitude of suppliers, some more worthwhile than others.

I have also noted that some of my suppliers check the permit issuances for localities and even follow-up, as they seem to know where I am in the building process much more than simply driving by might indicate. Anything in the public record is open to anyone in the general public, and I have made use of this in the past, but it is a little unnerving when people start checking up on you.


Miscellaneous  >  Insurance - HELP!!!!!!!!
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 7/14/2004

It sounds like a good portion of your problem (not being contractors) could be solved by obtaining a contractor license. I got mine from city hall, as long as I am not doing HVAC, plumbing, or electrical, the license was easy to obtain. I found the license worthwhile anyway, because it opens up so many more options for supplies and invoices.


Construction Bargain Strategies  >  Light fixture bargains
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/14/2005

If you like contemporary or modern fixtures, try affordablelamps.com. If you call their 800 number, there used to be a customer service representative named Michael who was extremely helpful. This is one on-line source that I found could almost always beat the local lighting contractor prices.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/15/2005

I found most internet sites for light fixtures didn't provide as good of a cost as I could get locally. I bought absolutely zero light fixtures from HD or Lowe's.

I found some of the best deals from the lighting supply houses, but ask what quantity of light fixtures you have to buy to qualify for trade pricing. Perhaps being a licensed GC helped me here (I don't exactly have to represent that I am building one house, but I DO represent that I am building my house and looking for new suppliers). Most GCs with accounts send their clients in to these type of showrooms. The showroom will discount the fixtures from retail price, and then provide a kickback check to the GC - this is profit people don't even realize the GC gets.

Light fixtures have tremendous markups, frequently dictated as minimum price by the manufacturer to the final consumer. If you get these from an internet source, they still dictate the minimum price. If you are a contractor, you are not the final consumer.


House Features  >  Concrete Decks
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 8/16/2004

I was going to use a concrete floor system suck as INSUL-DECK to build the deck on my ICF house. No matter what they claim, it is simply not cost competitive around here to do a concrete deck. Concrete stamping adds about $3.50-$5/s.f. to the cost of finished flatwork, which is about $3/s.f. For $8/s.f. just in the concrete, I can build a pretty exotic deck from Ipe wood or composite, and it should be almost as maintenance free and long lasting.


Construction Bargain Strategies  >  HVAC sizing for ICF/SIP... even all homes
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/13/2005

One thing I would caution when you get down into the very small air conditioners (smaller than 3 tons). They tend to be aimed at the rental resources market, so they are more likely built to a price point than a quality point. It seems property managers focus more on capital cost than life cycle cost, especially since they aren't paying the utility bills.

If you are at all upsized, I would look at getting a ventilating dehumidifier (a la Aprilaire 1700 or Therma-Stor Ultra-Aire APD) to supplement the dehumidification during times of low/no A/C use. I will be using this instead of an ERV or HRV. The price is a wash between the dehumidifier and the ERV, although operating costs of the dehumidifier will be higher.

Keep looking, you will find an HVAC tech that knows his/her business and the importance of properly sized units.


Miscellaneous  >  Roof truss suggestion and time frame
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/12/2005

You really need to find a local supplier for roof trusses. I found "local" meant within ~100 miles radius, as free delivery tends to end about this point.

Your truss company should provide a template based on your drawings. With this template they will also provide an estimate. However, make sure you order your trusses based on field measurements and not from the drawings, as changes inevitably get made and the trusses need to be manufactured for actual conditions. This will affect your bid.

As to time, it took my designer less than a week to prepare a template based on my drawings, and slightly longer based on field measurements (he figured all angles to four decimal places of precision, like that matters in the field). My trusses only took about four weeks from order through delivery, although this is highly variable based on time of year.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/13/2005

Your actual field measurements will vary from the blueprints. Your blueprints assume exactly straight walls, perfect corners, perfect squareness, etc. and this will likely not be the case in the field as this level of precision is simply not likely.

For example, my garage is slightly out of square - not a big deal if stick-framing the roof, because each framing member is field cut anyway. However on factory built trusses, the truss designer needs to know that my garage is out of square, how much it is out of square, and in what direction so that he can fabricate the trusses to compensate for this condition. Also I have several 30-degree angles incorporated into my house. These vary from 29-31 degrees, which doesn't sound like much variance, but when you consider my trusses are accurate to 1/16" it becomes significant. Even my 90-degree factory ICF corners vary +/- a couple of tenths.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/13/2005

Yes and no.

In my locale, I have to submit truss plans and engineering to pull a building permit. These are obviously based on the drawings, not the field dimensions. Not to mention that my banker wanted solid estimates on materials, and a truss bid is a big chunk of materials, prior to issuing the construction loan. (They want to make sure I have good estimates and can actually build the house for what I said I can). However just as my banker understands that material prices are volatile and will change, the building code officials recognize that truss templates can change based on field conditions.

For my all rough inspection, I had to have my revised truss template and shop drawings at the site for the inspector. Not a big deal. Both my floor truss template and my roof truss template, along with actual truss shop drawings, changed as a result of field dimensions. Please note that my costs changed as well, partly due to additional engineering, partly due to increased cost of materials, partly due to my truss company being acquired by a larger truss company and the pricing structure changing.

Short answer, provide your drawings to truss companies to obtain templates and bids, but do not order your trusses without setting an accurate field template to ensure the trusses you order will fit the structure you built.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/13/2005

This is apparently a regional issue.

If the truss company won't do field measurements, I would expect the framing carpenter to do field measurements and prepare an "as-built" drawing to fabricate the trusses from. The carpenter isn't going to want to fight trusses not built to the correct dimensions. The carpenter isn't allowed to field modify the trusses without engineering, so if one (or many) don't fit correctly, they simply can't hack them apart and rebuild them.

For me it was a little more critical, as I was using floor trusses hung from concrete walls. The truss hangers were all cast into the concrete based on the truss template (developed from field measurements); adjustment after the fact was not an option. Same for the roof trusses. The tie-downs were cast directly into the concrete (again based on the truss template), although you can always use Hiltis or redheads to get the hold-down strength you need if an anchor is out of place on the roof.

Even in commercial construction, there are design drawings and then there are as-built drawings. On a fairly large commercial project around here, the dimensions ended up being a fraction of an inch long, all requiring extra steel and welding of connections. You would be surprised what a fraction of an inch does for material and fabrication costs on a large project - this is a huge change order.

Or perhaps my civil engineering background is starting to show through, and it all isn't a big deal in structures this small (my personal residence is easily the smallest project I have ever managed, yet probably the most stressful).


Construction Bargain Strategies  >  LOGIX vs. PolySteel
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/12/2005

I have not worked with either one, but have worked with ICF so let me offer my opinion.

1) I would prefer the plastic ties to the steel ties as they are easier to work with. I don't think holding power is a very big deal here, the plastic has more than enough holding power for anything I have screwed to the walls, including walkboards. To install utilities in ICF walls, you need to carve out the foam somehow (I used a router, more common is an electric chainsaw). The plastic ties will cut out easier than the metal ties, and you really don't want to hit a metal tie with a chainsaw as this will either break the chain (best case scenario) or really ruin your day.

2) If you are running utilities in ICF walls, make sure you have enough foam there to completely bury whatever you need. I put some plumbing vents in ICF walls. We had to completely carve out all of the foam to get a 2" vent line in there. However, the sheetrock went over smooth. Less foam and I would have had to make other considerations. Same for electrical boxes (you will have outlets in ICF walls).

3) I wouldn't worry so much about total wall thickness as IIRC, VBUCK comes in any dimension that any of the ICF is manufactured in, making this easy to use. I used ACQ lumber; ripping down a window buck wasn't too difficult with a guide on a table saw. This wouldn't affect my decision criteria either way.

Good luck.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/12/2005

A hot knife works great, but is really ssssllllooowwww.  Pre-installing all your electrical boxes sounds like a lot of work. Your electrician might not appreciate the extra labor. A router cuts the foam like butter and left very clean channels - nice. The chainsaws are fast and ugly, but then you cover this with sheetrock anyway.

If the steel ties only go to within 1" of the block tops and bottoms, you need to be very careful about the siding material you wish to use. I am installing James Hardie lap siding, 8-1/4" with 7" exposure, and occasionally run into the top of a block and don't have enough web to screw into (about one course/8-9' of height). There are solutions (I am using flashing; grapplers are another solution), but the Amvic block has the webs very close to the tops of the block. If there were 1" between the block and the webs, I would be having this problem much more frequently. Just something to think about, and depending on your siding choice perhaps not an issue at all.


Planning Phase  >  Materials List/Blueprints Dilemma (Help!)
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 8/1/2006

I am going to disagree with Scott on this one. I had tons of copies of blueprints, so handing them out indiscriminately was something I did hoping to save money. I handed blueprints out to several lumber suppliers to get lumber bids, expecting to compare prices and make decisions. The problem is, the data I got back was basically worthless for this purpose. Every lumber supplier had different quantities on their takeoffs, so you can't compare them based on price alone, as everyone was bidding different quantities. How would you like to select your low cost supplier, only to realize they were giving you a pretty short load of the materials needed to actually build your house? Some suppliers also bid the job per 1,000 board feet of lumber, and I had no idea how that equates to a cost per 2x4 stick so I couldn't even compare unit costs.

I found it much easier to compare supplier when I provided the takeoff. Get a good framing book such as Stanton Press "For Pros by Pros" series. A chapter in this book will teach you how to do your own material takeoffs, it didn't take me very long to have my own list of lumber that I needed. Then you can fax this takeoff list to your various suppliers. They will especially appreciate that you have already figured the quantities, making it much easier for them to prepare material costs. Most lumber suppliers will respond quickly to the easy bids, and if you have your materials and quantities already called out, this is an easy bid. At this point, you can compare apples to apples, and you know you are truly getting the best price.

You might shop Home Depot and Lowe's, but in my area they have neither the best prices, the best service, nor the best lumber (in my area, it really is junk lumber compared to the lumberyards). I received much nicer lumber at a better price, than the big boxes. The lumber suppliers will provide free delivery, will pick up the excess, and generally provide much better service. There is a reason the pros don't shop at the big boxes. However if you don't need to sleep at night you can take your low bid to Home Depot and they will beat the price by 10%. You can combine this with a 10% off coupon courtesy of fleabay or freeroms and save an immediate 20% off your lumber bid. Is it worth 20% to get inferior service, inferior lumber, and allow a large supplier to sell below costs with the intent of putting a smaller company out of business? That is your call.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 8/3/2006

I think the important thing here is your statement about O-B vs. GC. Everyone on my construction site thought I was in the trades somewhere, although they weren't sure exactly what trade I was in. I knew enough terminology from every trade that I could talk their language, and in their mind this only comes from being on construction sites. Every one of them was wrong; I am not in any of the construction trades, nor have I ever been.

As Scott mentioned, he used his framer's takeoffs. I consider this quite acceptable, and probably the best option if you are going to subcontract it. I did my own framing - I didn't exactly have a framer I could ask to do the takeoffs for me. For plumbing materials, I used my plumber's takeoffs. For electrical materials, I used the electrician's takeoffs. I guess the important thing is you give everyone the same numbers so that you can compare who is truly giving you the best prices, and being able to talk to the supplier so that they know the quantity takeoffs were generated by a knowledgeable professional, not necessarily a computer program used by a designer or architect (the $3 home design program I purchased via eBay would do quantity takeoffs, if I wanted to trust it). Once you have these numbers, you can get more bids quickly than you can imagine, and you will save money.

BTW, this is my first O-B house, my first experience with residential construction, and my first experience with framing. Thank you for the compliment, Scott.


Shopping Techniques  >  Countertops
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 12/7/2004

Amerinite, Inc. manufactures a solid surface countertop (similar to Corian) called Amerinite. They are in Cookeville, TN, but shipping is quite reasonable using freight carriers.

They can sell you materials-only if you wish to DIY. However if you provide a template, they can also fabricate it at their shop and send you completed pieces. If the completed pieces are too large for shipping, they can fabricate them at their shop slightly oversize and then cut them apart so all you have to do is one or two microseams at your site. Even with them doing all the fabrication, I found their prices to be better than any installed price on solid surface material, including shipping. However I am going to try my hand at fabricating it myself (although I am going to start with something small such as a bathroom vanity) before I make the decision to have them fabricate it or to DIY.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 12/13/2004

I will close the loop on information sharing, but this is still several months off for me so please be patient.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/9/2005

Gayla talked to them just yesterday so we could see what type of lead time we would need on the order. The color we are looking at is $469 for a 144"x30" sheet (they will sell partial sheets at a premium; you can also get 144x36 sheets). They can fit four sheets/pallet (~900 lbs. total pallet weight) for a shipping charge of $250/pallet (I recommend you order full pallets to save on shipping). We need full pallets, so our s.f. price delivered is about $17.71. We will probably have a fair bit of waste here just from cuts, etc. but you can't really beat the price.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/9/2005

I am just now getting ready to order it. I really think it is a doable project for a detail-oriented DIY. My cabinetmaker suggested that solid surface can break near the cutout (e.g. sinks and cooktops) so be very careful. I think in these areas I will build up and glue several layers of solid surface to give them much more substance when I use the router. I have also talked to Amerinite, and they will pre-mount the sinks and ship them that way if you like, for a cost of course.

I found an article in handymagazine.com (January/February, 2004) that talks about DIY solid surface.

Like you, I would feel better not being the first person I know to take this leap, it is mighty expensive stuff to mess up. But then there have been a lot of things I have learned since starting this project, and one of which is if I read the instructions, ask questions, use the right tools, and take my time I can achieve results as good as most professionals (although not nearly as quickly).


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/12/2005

My order went in yesterday. They said it will take four weeks for me to get the materials. The color I ordered is not a "stock" color, so they have to order the base for it. The base is from Safas Corp., the color is Galaxy Nury Bedrock 221. I am enclosing a sample picture just so I can figure out how this is done.

I went ahead and will have the sinks mounted in the slabs - they said this is fairly easy if you have the right clamps, but since I don't have any clamps yet, I figure it is just as easy to pay them a nominal fee to do this for me. Sinks is plural as I am using this as bath vanities as well as kitchen. To address the cooktop cutout issue, my cabinetmaker suggested going to a deeper depth at this location. We have an L-shaped island, with the cooktop at the corner. We will transition this at the L-shape using two 45-degree angles. At this point the countertop will go from a standard depth to 28"-30" of depth to provide some more "meat" for the cooktop cutout.

I will report back once the material is delivered.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/26/2006

They closed down and filed for bankruptcy. I don't know if anyone has taken over their operation.


Green Building  >  Tax Credits
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/30/2010

Federal tax credits, or does Florida have a state-tax credit? The reason I ask is I thought these tax credits expired in 2009, and this seems to be backed up by IRS Form 8908. Now then, look at the definition of "Eligible Contractor" on this tax form; I don't see that an O-B would be excluded. The eligible contractor is the person who owns or has a basis in the qualified home during its construction - I read this that your HVAC subcontractor does not meet eligibility to take the tax credit for installing an energy-efficient HVAC unit for the "owner."


Planning Phase  >  Parade of Homes
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 8/30/2007

Check with the Greater Houston Building Association, or ask any Realtor servicing this region. 


Construction Bargain Strategies  >  Salvage Materials before Demolition of House
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 10/2/2004

I would call Habitat for Humanity or other charity organizations. I pasted the next two paragraphs directly from the local chapter (restorekc.org):

Habitat ReStore is also proud to offer Deconstruction Services. Deconstruction is the process of hand dismantling in order to salvage useable portions of rooms or buildings. These items are then diverted to Habitat ReStore and added to our inventory. Whether a simple remodel is planned or a complete demolition is necessary, our crew can do the job. When you use Deconstruction Services as an alternative to traditional "wrecking ball" demolition, the salvaged building materials recovered are a tax-deductible donation to Habitat ReStore.

The best part about it is the cost, it pays back double. Not only are you not paying for demolition of your structure, you get a tax donation for letting them have the materials. I have been to the resale store for materials, they salvage almost everything. Obviously you are still left with minor demolition such as concrete basement and footings, slabs, etc.


Building Phase  >  Post Drywall Cleanup
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 7/13/2009

Put a drywall filter on your Shop-Vac; they are basically paper bags that go inside. Makes cleaning the shop vac nice and easy as the drywall is contained. It also protects the motor, as drywall dust burns these up pretty quickly.

Next time, after you have the floors in and before the interior walls, staple down a layer of roofing felt. Don't worry about working on top of it, it will hold up to foot traffic. After the sheetrockers leave, cut the roofing felt at the base plates and roll up. Voila, your subfloors look like brand new.

As to sheetrock dust on the walls, we had some luck with Swiffer floor wipes once the bulk of the dust was gone.


Miscellaneous  >  Superior Wall vs. ICF's, Which is best for PA?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 6/30/2004

I would get bids for both before making a decision. I ended up with all sorts of bids (ICF, SIP, 2x4 and 2x6 stick-framed, light-gauge steel-framed, red iron steel framed) just based on how I wanted to construct the house. Once I sorted out the how (I ultimately decided to use ICF), then I sorted out the specifics of who, when, etc. They all have advantages and disadvantages, cost is only one part of the equation.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 7/7/2004

We will use ICF for basement and above-grade walls, everything to the eaves. I would caution against buying ICF material from Lowe's if you have never done this yourself. When we were considering DIY for the ICF block, the quality and price of the block was secondary to the technical assistance we would get from the supplier, the ability to rent bracing equipment, the supplier connections for concrete pumps, the supplier expertise for concrete mix, etc. When you buy from Lowe's, you don't get any of this stuff.

I would recommend finding the closest ICF distributors and talking to them. Of all of the ICF material-only bids we got, there wasn't enough difference between them to justify buying material on cost alone without considering the technical aspects and hand-holding we were going to need to get the job done. We ended up with Amvic, but only for the reason that the contractor we hired for the ICF portion prefers this block. If I were to DIY, I would have ended up with ECO-Block.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 10/1/2004

John,

Great post. There is a lot of good information here; you should get the post of the week for this one. I agree when you are shopping for ICF to DIY, the distributor is much more important than the block itself. I got quotes from Amvic, Arxx, ECO-Block, Fold-Form, Logix, and Reward, among others. The prices between block are not significant enough to shop prices alone. Service after the sale is much more important for DIY.

Around here, the best support comes from the ECO-Block distributor, and while that was not my preferred block, I would have purchased this hands down based on support after the sale. I agree that renting the bracing is critical. I talked to a DIY that didn’t rent the bracing for the basement level as he felt like he could buy a lot of lumber for the cost of bracing rental. Basically he framed his first floor and used this as bracing to hold the ICF walls prior to the concrete pour. He rented the bracing for the next pour, and said the bracing is definitely more worthwhile.

Take the class. Even if you later decide to subcontract the ICF portion (as I did), this knowledge is invaluable. It teaches you how to do ICF correctly, usually from a factory representative and not from the distributor. This allows you to see other ICF contractors and identify where they cut corners. If you understand the process, you can make a better decision about who you hire. If you DIY, the class should be mandatory.

I opted not to use V-BUCK, but went with treated lumber. Some of the distributors recommend it, others don’t. I noticed not all of the professional builders use V-BUCK. I preferred Universal Buck (made by ECO-Block), but the ECO-Block distributor recommended V-BUCK over their own product based on labor savings (Universal Buck is modular and must be assembled in the field).

I ended up with Amvic ICF based on what the subcontractor I hired liked to use. I have to say after being on several pours, the Amvic was without question the most solid block I have seen. My subcontractor braced it very heavily and glued every joint, there were no shortcuts here.

Ken


Planning Phase  >  Mix Owner-Builder/GC
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 7/26/2006

The question becomes why are you interested in O-B at all? The intent of O-B is to get quality construction (much higher than spec), save money (eliminate GC OH&P), and to get exactly what you want. You can accomplish two of these goals without O-B. The GC puts up with a lot of headaches in the construction process, and are compensated accordingly. For me, I built at the top of my neighborhood (wonderful setting) so in order to get better quality construction on a custom designed house, I had to save money if I ever wanted to consider that I might sell it sometime in the foreseeable future and still cover my costs, so it was all about cutting costs as my primary reason to O-B.

 

Just because you O-B doesn’t mean that one person does everything, or that you can’t hire a foreman or construction manager or accountant or subcontractor or inspector. I worked with my SO, and we really had a clear delineation of tasks she did vs. tasks I did, and there was very little overlap. Given that we had clear tasks and expectations between us, it would have been fairly easy to use what you coin a “hybrid” approach and hire the services of a person to fill in for one or the other, for a reasonable fee of course. I would argue that anytime you hire a subcontractor, you are moving toward this “hybrid” approach, but this doesn’t make you less an O-B.

 

If you decide the best option is to pay a GC for his services, I would recommend a fixed price for a certain package of services provided. I do not like percentage-based fees. Let's use lumber as an example; how much incentive does your GC have to call around to every lumberyard to try to get the combination of best price and service? Any money he saves directly results in less fee for them – they will simply use the lumber supplier they already have a relationship with and quite likely this is not the lowest price you could find with simply an hour or two of faxing your material takeoffs to the different lumberyards in any geographic area. I don’t believe they will purposely look for the highest price for lumber either, just don’t expect much in the way of work to minimize your costs.


What the professionals will tell you (and most of them honestly believe it) that because they do $XX,XXX worth of business they get better prices is pure fallacy. I found that I could universally beat my subcontractor prices on almost everything (HVAC being the exception, you can’t really get this stuff without being licensed). I hired several subcontractors that changed their suppliers after my job simply because I could significantly beat their delivered price, much to their surprise (every one of them told me I didn’t have a chance at meeting or beating their prices from their sources). Another example are architects or designers who charge by the square foot. Exactly what incentive do they have to minimize square footage? I don’t disagree that these people that you hire don’t have your best interest in mind, but their fee structure is directly in conflict with the service they are providing, which is to ultimately save you money.


Miscellaneous  >  Does Appearance Make A Difference
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 7/26/2006

Does the appearance of the subcontractor affect your perceptions of them? I would try to dress "similar" to what they do. My plumber showed up driving the most beat-up vehicle, disheveled appearance, missing teeth, heavy smoker, many things I would "normally" equate to negative perception. However he was highly recommended by a source I trusted and lived up to the expectation. He certainly didn't display the most professional appearance, quite the contrary.


Construction Bargain Strategies  >  Window Coverings
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/28/2005

And who might that be?


Construction Bargain Strategies  >  Getting subs to compete
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 10/19/2004

I am with Mark on this one. I like to provide a level playing field for all subcontractors. This doesn't mean I don't try to negotiate a lower price, or even that I select the low bid, I just like everyone to compete on the same footing initially.

I also wonder what they think if I am willing to fax their competitor's bid to them, do they wonder if I am faxing their bid to their competitors? This doesn't mean I won't call a subcontractor I wish to use and ask them to sharpen their pencil a bit to get the job based on someone else's bid. Even with the low bidder, it doesn't hurt to bluff and ask them to lower their bid to account for a lower proposal you have received. You also need to be careful with this, because some subcontractors know they are the lowest bidder due to efficiency, and they won't bluff and will instead walk away.

Also, even if you intend to use a subcontractor, you should bid the project just to keep them honest and make sure you are getting good value. I worked with one ICF supplier to learn ICF. I was at several of their jobs. They met with my architect several times, once before he even started design. They reviewed the plans at the preliminary stage to ensure buildability. Their engineers reviewed the structural details, as my architect had only designed two ICF houses and wanted a check of his work before he stamped it. They thought they had the job wrapped up, and if they had not been so comfortable with me on their bid it would have easily been theirs. I think they were confident enough that I wasn't shopping this portion of the project that they had a very comfortable profit. One of their competitors stepped in trying to make a name for himself in this market, and got the job.

One thing to remember, we are not just shopping for subcontractors. They are shopping for clients they will be proud to work for. If I am questionable in my pursuit of subcontractors, or they ask me to fax their competitors bid and I do, what kind of person am I hiring to work for me? Maybe I have rose colored glasses, but I like to think subcontractors like to work on my job. So far, every subcontractor I have used (and some I haven't yet but will) have received referral work based on my job, so it has been beneficial to shop beyond price points only.


Construction Bargain Strategies  >  Shop eBay for great deals!
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 6/28/2004

I would have to agree here. I have purchased plumbing fixtures, kitchen appliances, all of my interior and exterior door hardware, garage doors (Crown Door routinely sells overstocks on eBay, and they are local to me), electrical panels, electrical materials, etc. As an alternative, it is a good check to see how much markup you are paying to subcontractors to negotiate a better material price. You do have to be careful though, as shipping can get pretty expensive on larger items. Also many items sell for more on eBay than you can get them for locally, so know what you are buying.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 11/1/2004

As someone who is purchasing heavily off ebay.com, one of the best bargains is for tools. Any tool you need you can find on eBay. The beauty of the situation is you can sell it when you are done and recoup most of the cost.

For example, I have found for pneumatic nailers, magazine screwguns, etc. if I need to rent them for four days, it is cheaper to just buy them outright. eBay will usually have them for about half of retail. And when I am done, I just sell the tools I no longer need (I am keeping some of the multi-purpose items, but who needs a cordless coil-roofing nailer more than once?) to recoup my costs. It is basically close to free tool rental, and no pressure to return these to the rental yard.


Miscellaneous  >  Square-D arc fault breakers
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 7/6/2008

Any time I had a question like that, I called my local codes department. They recognized my voice by the end of my project (and had my fax number memorized from sending me pages out of the code book), but I never had any surprises on work I did.


House Features  >  WROUGHT IRON STAIR BALUSTERS
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/30/2005

I had some made for a previous house. Not knowing where to start, and the Internet wasn't quite as widespread at the time (at least I wasn't connected), I started with the Yellow Pages for my locale.

We have a heading titled Iron-Ornamental that has almost two pages of businesses. Most of them are iron fence contractors, but you can weed these out pretty quickly. I found a great local iron fabricator - I provided him the actual field measurements and he welded up a custom piece. If you are not in Kansas City my source won't matter to you. I found a custom piece was much nicer than panels you get from the hardware store, and not very much more expensive.


Construction Bargain Strategies  >  Moldings
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/28/2005

If you are going to paint your moldings, the recommendation I got was to look very closely at the MDF. The paint-grade pine and wood moldings are all finger-jointed together (look at the pieces and you will see what this means), and every problem I have had with molding has come from a finger-joint coming apart. The MDF is more stable dimensionally and supposedly takes a coat of paint very nicely. It is a bit cheaper too. Of course MDF wouldn't work if you are looking to stain your moldings.


Construction Budgeting  >  Means Pricing Guide Book
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 10/20/2009

I used the R.S. Means Manual for Residential Construction when I was estimating build costs. I liked it because you can run plenty of "what-if" type scenarios when you are planning, and really dial your cost down through efficiency. One that comes to mind quickly (I built several years ago, my memory of this has probably faded a bit) was that I wanted some glass block. RS Means showed 8" glass block was ultimately cheaper (installed price per square foot) than 6" glass block due to cheaper labor. However jump to 12" glass block and the square foot installed price increases again. So for glass block, 8" it was, and my architect needed to understand that where he showed block, he needed to ensure dimensions were correct to accommodate 8" nominal.

The RS Means allows you to do this for many factors in your construction (cabinet quality, brick facade, etc.). I guess more than anything it helped me narrow down what I could afford, or wanted to afford, before I even went to the architect.

I also used it to identify tasks I might like to do myself and how long they might take. I assumed that between my learning curve and my lack of skill I could probably work about 50% of the production rate of a professional (sometimes this was a high estimate, be realistic with your own skills), but it helped me ballpark how long various tasks might take me. Knowing production rates, it also helped me rough up a schedule (or various schedules depending on which tasks I might DIY).

I went to the library and used their copy. It was in their reference material, so no checking it out and taking it home. No problems, I really found most of the data I wanted in two sittings (planning before architect, scheduling for banker). As to ultimate accuracy for cost estimates, that's not how I used it. You also might try a used version, while pricing would change some of the other factors (like I used) would not.


Planning Phase  >  ICF project
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 12/19/2009

Here is my take on scope of work, what are you asking your ICF installer to actually do? ICFs need a good and level footer; are you providing it or do you want your ICF subcontractor to provide it? I would expect that if you provide it, your ICF subcontractor will surcharge you with the assumption that it won't be perfectly level. If they provide it, then they get a bigger piece of the pie but they also ensure a nice level footer when the ICFs show up on site, so less uncertainty gets included in the bid price. A nice level footer needs a nice level excavation; do you want them to bring the digger or are you bringing your own? My excavator kept my excavation level within two inches, my ICF sub said the previous excavator the level varied by 14", which do you think costs them time/money and makes their job easier? For this reason, ask if they have excavators they have a preference of working with.

Next up, what do you want for window bucks? VBUCK, ACQ, maybe something else? These cost money (each a different amount), these each take a different level of bracing and effort; you need to spec what you want it to look like. Perhaps you want more church-window install (angled sills to accommodate the wide depth, this looks really good); this takes away some options.

How are you going to secure your floor system to the ICF, are you going to use a ledger board? Simpson connectors, USP connectors, bolts, I have seen a brick ledge used for this purpose as well. Again each of these has different costs and labor requirements. Who is installing your interior floor system? Are you bringing in a carpentry crew for this? If so, your ICF subcontractor gets to work around another crew, making life more difficult for them and also putting their schedule at risk from another crew. The same question can be made for roof - how is it going to be secured?

When I hired an ICF subcontractor, my conversation went something like this. You need a level footing, are there footing subcontractors you prefer to work with or do you prefer to pour your own footings? You need level excavation, are there excavators you prefer to work with? You probably like to control your own schedule and not work around floor framing, it seems to me if we set a template I can order floor truss joists and work within your schedule so you know where to place the USP connectors just prior to the pour, and the truss joists will show up just after the pour custom-built to drop right in (no complicated carpentry here, heck, no cutting here). If you wish to do the floor installation you control the schedule and thus eliminate the uncertainty that comes from trying to coordinate more than one subcontractor. Lets talk pros and cons of different buck materials, I need to make an informed decision and I wish to use your expertise to help me get there. Here is the template I have for the roof trusses, I need specific roof connectors in these locations (this level of detail might come later, you don't have a truss template this early, but talking about how to connect the roof should happen early). What about waterproofing; do you want your ICF subcontractor to do this, or is this a separate work package for someone else? Do you want peel-and-stick, dimple sheet, trowel-on? Again each of these has their own cost and labor component. What about penetrations, it is easier to cast them into the wall than it is to core them later?

When my ICF subcontractor showed up, he had a nice level hole (my excavator). When he left, I had a nice shell including roof framing and sheathing and waterproofing. Besides my plumber (underslab plumbing), his crew (and a couple of subcontractors such as basement slab) was it, he had no one else to work around. I basically gave him a larger piece, but also eliminated much of his uncertainty with the project by giving him one substantial completely contiguous schedule with no breaks.


Shopping Techniques  >  Where to Buy Hardwood Floor Material online?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 7/6/2008

I used BuildDirect.com. My HVAC installer (also building at the same time I was) used Lumber Liquidators. I have read plenty of bad press about Lumber Liquidators on the Internet, but he was a happy customer.  


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 7/10/2008

I did some shopping at ProSource. They are set up for building contractors to send their clients in so they (the buyers) can pick their finish flooring, tile, etc. They provide pretty good discount to the buyers, and then a rebate to the builders that sent them in (this is profit most buyers are not aware of when having a pro build their house).

The real discount from ProSource comes when you explain to them you are a builder (I had my GC license), I build strictly custom as every house has an owner before I break ground and is designed by an architect (not much stretch if you consider that every is just one), I was building my own house (true), and I wanted to evaluate materials so that I could adequately consider them for future build jobs (not too far from true) and that I would feature that I got the materials from ProSource (free advertising for them, albeit limited but they don't necessarily know that). Present them this while you are wearing a shirt with your logo on it (all "real" builders have these shirts; they are cheap so even us poseurs should get them made as they really look professional), and your price just hit the floor. If you order last year's models of tile and the like (yes, tile has years, the brand-new patterns are expensive and not likely to be discounted much), you will not touch their prices anywhere else with this technique.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 7/29/2009

Let's be careful here. If you search "owner-builder" in any popular search engine, you come up with myriad of sites. Owner Builder Network is a registered trademark for a specific company that is trying to sell you a service that some O-Bs might find valuable. This is much different than what Mark is providing on this site.


Building Phase  >  Dirt work and trenching
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/8/2005

If you are building on rock, I second John's recommendation to get a good hammer drill. However what we did was rent one from the local rental yard. We got everything laid out, marked where we needed to drill, and rented a much nicer one than I would have ever purchased for two days.

OTOH, I have found that in general if you are going to need to rent a tool for four days, it is usually in your best interest to buy it and resell it when you are finished. In these cases, buy quality (Dewalt, Hilti) as the resale will be much higher than discount stuff (Chicago Pneumatic) and will ultimately cost you less money.


Construction Bargain Strategies  >  Bargaining with subs?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/22/2005

I would analyze subcontractors based on price, service, and quality of work. Once the bids come in, It is too easy to take the lowest bid (of course if you asked them to bid they were qualified, right?) and lose track of the rest.

At the same time, it is certainly fair to negotiate a better price with your selected subcontractor. For example, I found many times I could beat pricing from subs (I shop around, they tend not to), and they would lower bids if I provided materials based on their take-offs.

One thing I would never do is provide one subcontractor a copy of competing subcontractor's proposal. I have heard before the "just fax your lowest bid, I will match it or beat it by XX%." I want all of my subcontractors on a level field when they are preparing proposals. This is the same reason I don't shop at Home Despot on price match issues (although I do shop at Home Despot when they have the best combination of price, service, and quality of materials). I will however ask for ways to reduce submitted pricing or for them to sharpen their pencil.

And at times I have taken the highest bidder and been happy with that too.


Legal Issues  >  I've been threatened with a lien after my C of O
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 8/5/2008

Actually in Missouri it is more complex than this. IIRC a subcontractor cannot issue a mechanic's lien against the property if they are working directly for the owner, unless in the contract they specifically address the right to lien the house for certain conditions. As most of my subs thought I was the GC (and not necessarily the owner), I only had one sub do this properly. The only sub that did this correctly was my fence installer, and thinking about it, a fence installer would work directly for the property owner a majority of the time. Most construction subcontractors do not work directly for the owner, and a handshake agreement (typical of residential construction) isn't going to cut it either.


Planning Phase  >  Am I in the wrong?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 7/18/2006

In my experience, too many details on residential construction jobs will do more to scare away bidders and increase bid prices. I have some friends, both project engineers used to working on large (very large) commercial jobs. They tried to treat their residential build job like a large construction job, specifying everything down to individual part numbers. They figured it would make the G-C's job easier, as their expectations were very clear. What it did was prevent them from getting any bids, even from the big "custom" builders as residential G-Cs simply don't want to work for engineers that are looking over their shoulder daily and scrutinizing their work. Once that first bid package was sent out to multiple G-Cs, the project was burnt.

I tried to keep my job as simple as possible this way. For example, I had a mechanical engineer design my HVAC system. However I didn't provide a copy of this design, load analysis, airflow analysis, duct sizing, etc. to a single HVAC company to bid the job. I used the analysis to help me determine which HVAC company had performed a good load analysis, which HVAC company was giving me the right equipment, and to ask some "pointed" questions to steer the design closer to the "ideal" I received from the mechanical engineer. Why didn't I simply do this the "easy" way and give all the HVAC techs a copy of the design and ask them to bid it? I didn't want them to think they were working for a nitpicky engineer as when you talk to subs they consider engineers to be some of their worst customers. Perceived bad customers lead to unnecessary markup.

I also prefer to talk to every subcontractor personally, accompanied by a site visit so we can go over expectations. For example, when I walked through with my HVAC tech prior to installation of any ductwork, I explained which way doors opened and where the electrician wanted to put switch boxes. This could have all been noted on the plans, detailed specs, etc. but the personal communication with the tech doing the work is much more effective as he is used to electricians following him and is also understanding of conflicting uses of space. Same for the electrician, he needed to know where I wanted switches and what fixtures I want them to control - I could have spec'd it, but it was simply easier to get there from talking to him.

What worked for me won't necessarily work for everyone. If I were hiring a G-C for a build job, I would definitely want more specs on paper as you don't get to talk to individual subcontractors and your expectations better be clear. Since I get to choose all subcontractors, I can make my expectations clear simply by talking to them using their terms, being on site or available via mobile phone to answer questions (this significantly cuts down on rework and builds good rapport with your subs), and this can be included in their bid price. However, I know a thing or two about construction practices and what to ask for, and almost every sub I dealt with thought I was a residential G-C based on being able to talk to them this way.

Be careful, as if you don't know the correct terms you may get something you don't need. Since this topic has long posts, I will include a story about my drywall subcontractor. He suggested I use "Level 5" sheetrock on a couple of walls subject to reflection of light. Not knowing what "Level 5"  was (it is a complete skim coat), he asked which walls I want to "Level 5?" I said "Level 5 is good, I will like it, right?"  He replied affirmatively. I said "If it is good, why not Level 5 all the walls?" Well, I have skim coated walls in my garage, utility room, mud room, unfinished basement (ICF has to have sheetrock), closets, under stairs, etc., much nicer level of sheetrock finish in these utility areas than is included in living areas of custom houses costing 3-4x my project. I guess if I had known what "Level 5" meant I might have saved a bit of money on my sheetrock and focused the skim coat on highly visible walls, and used a lower level of finish elsewhere. Oops, however he was still very cost effective. By the way, this sheetrock bid was handwritten on a spiral-bound notebook with two lines, the spec was to provide sheetrock finish for the house at specific address. No details as to airtight finish, Level 5, smooth wall texture, ceiling texture, corner moldings, schedule, etc. yet I received exactly what we had discussed - if the subcontractor wasn't going to honor his word or his paper and didn't come highly recommended, I might have been more uncomfortable about doing it this way. But like I said, I picked every subcontractor.

Remember it is not just you selecting a subcontractor, it is also a subcontractor selecting a client. They all have stories they can tell you about bad clients, and they don't like these jobs. The key is to provide enough information to illustrate you are a good client, but not so much detail as to indicate you could be a bad client.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 7/20/2006

I see from one of the boards you cross-posted to that you solved your communication problem and hired this person as your GC.

Good luck with your project.


Legal Issues  >  Construction Insurance Questions
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 6/12/2007

You need Builders' Risk insurance. This is like a homeowners insurance policy for your construction site, it does not duplicate workers' compensation insurance obtained by your subcontractors for their employees.


How Owner-Building Saves Money  >  Saving on taxes once the house is built
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/17/2005

There is a difference between an appraisal and an assessment. Your taxes are based on the assessment, not the appraisal (in fact they never even see the appraisal, this is between you and the bank).

What my bank does is appraise the house before construction to determine the amount they are willing to loan (they will loan 80% of the appraised value). However, if the estimate you submit is less than this, they will lower the appraisal. For example, if my bank appraises the house at $200K, they will loan $160K. However, if my estimate I turned in is only $150K, they will lower the appraisal to $187.5K and loan you $150K - for this reason I had to fatten my estimates because I didn't want to limit my construction loan prematurely). At the end of the project, they will do another appraisal because now I have a permanent mortgage, and not a construction loan. The appraisal will now be based on the amount of the permanent loan.

Believe me, I am going to use this artificially low appraisal to try to lower my tax assessment and my insurance rates (you should insure for full replacement value anyway). My insurance agent said with my house, they would do their own appraisal anyway due to the unique construction (ICF) in this area.


Construction Bargain Strategies  >  Anyone have any experience with Durisol ICFs
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/17/2005

Please note that ICF is very regional. There are probably 50 or more manufacturers of ICF, yet in my region I can obtain probably only six to seven of these very easily through local distribution networks, and being in the Kansas City area this is a fair-sized metropolitan area with a lot of construction.

Please note that Durisol is made in Ontario. My first question to you is "Is it available through a local distribution channel in the area of Florida where I live?" If it is not easily available to you, it really doesn't matter what properties you think are valuable, how easy it is to build with, etc. as you simply can't get it.

That said, many of the benefits touted on the website are obtained with other ICFs as well. Granted that Durisol does not contain polystyrene, and they identify that this is a benefit, but they never really explain the benefit of not including polystyrene. Yes, termites will tunnel through polystyrene, but this is why most ICF manufacturers use borate-treated block - so what? I would question how a byproduct of wood (Durisol) isn't attractive to termites without chemical treatment?


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/18/2005

Cindy,

Let me take a shot at some of the “advantages” and try to explain what they really offer. I have an ICF house; I have done considerable research in different ICF systems.

1) If it is not available locally, I wouldn’t touch it. If it is available locally, and you either need to return excess material or you need to order additional material, you have no problems doing so. What happens when your estimate is a pallet short, are you going to go back to Ontario to get one more pallet of block? Or if you have 10 pallets of excess block, you get to eat these because you can’t return them?

2) The key with ICF is not the block itself, especially if you plan on a DIY installation. The key is service after the sale, as you will need technical assistance with this stuff. It looks like Lego blocks, but there are a lot of tips and a steep learning curve to get to where you can pour a straight, plumb, square wall with it. If you are going to DIY ICF, and you don’t have experience using it, service after the sale is much more important than individual characteristics of the block itself.

3) Durisol does not burn or melt. Ummm, so what? While I agree that polystyrene does, there is no exposed foam in an ICF house to burn or melt. It is all covered with sheetrock or plaster, and gypsum does not burn or melt either. If you want a four-hour fire rating, you can get this with sheetrock on a stick-framed wall. This is not a big deal. Also, that four-hour fire rating means nothing once you put a penetration in your wall, and I imagine you will have doors and windows. Take a four-hour-fire-rated wall, put in a door with a 15-minute fire rating, and suddenly your whole system now only has a 15 minute fire rating. Chances are your doors don’t have any fire rating at all, and I all but guarantee your windows don’t either.

4) I agree with the thermal mass issue. If you are building passive solar, you want the thermal mass to the interior and not insulated. But once again, the practicality of this in the field is a wash. Around here ICF houses of 4K+ s.f. finished space have total utilities <$100/month during the most extreme climate conditions we have (summer or winter). For my ICF house with 4K s.f. in the envelope, I am cooling it with three tons and I am oversized (heating is 60K BTU). I went with a three-ton unit because units built smaller are aimed at the apartment market, so they are built with a target price point at the expense of quality. I give up some efficiency by using a fully insulated ICF, but not very much.

5) Promotes healthy indoor environment and inhibits mold growth. ICF material is treated with borates to inhibit termites. This borate treatment also inhibits mold growth. You cannot get mold to grow on a borate treated block. Also your indoor environment is more a function of adequate ventilation and humidity control. I would argue that ICF contributes to an unhealthy indoor environment because ventilation and humidity control are more critical with ICF than traditional construction, and most HVAC contractors don’t truly understand the HVAC issues associated with this building technique.

6) Are you using real stucco, or one of the EIFS? Around here, it is very difficult to find real three-coat stucco, but I can find EIFS installers all day long. I have yet to see one of them blink at an ICF house as the most common EIFS substrate is insulating foam board. No problems.

7) If you pour a 7-9” slump concrete unless you are using a plasticizer, you will adversely affect your concrete strength. As to voids and ease of pouring, also not a problem. ICF have been around for over 30 years, the collective experience has served enough to all but eliminate problems with voids in concrete walls. Between the vibration introduced by pumping, internal vibration, and external vibration used by most ICF installers, voids simply are not an issue if there is adequate space for the concrete to flow. In my house, we had one area where it was difficult to get concrete to flow, but this was a function of the amount of steel and not the slump of the concrete. With some vibration during the pour, I have no voids in this area. We used a 4K psi pump mix with ½” aggregate and 5½” slump, and this stuff flows like gravy out of the pump. If I were concerned about flow, I would have used pea gravel aggregate with an air entrainment admix before I would spec more slump.

8) No VOCs outgassed. If you think you can build a house with no VOCs, you are mistaken. What are your floors made of – plywood, OSB? What is your ceiling framed with – TJI or I-joists? What is your roofing deck made of – plywood or OSB? What are you going to use on your floors – carpet or hardwood floors? Are you using EIFS for your interior stucco finish? What about cabinets, no plywood or melamine, much less what they are finished with? What is your trim made of, what is it finished with? In your attic, are you using cellulose insulation or fiberglass with a binding agent? Are you going to paint your interior? ICFs are no longer made with CFCs as expanding agents for the polystyrene. If you want to address indoor-air quality, you would be better suited to try to understand the envelope as a whole than to just look at one material. Go over to buildingscience.com, a lot of good information here.

All of this is not to say that Durisol is not a good ICF material, just that we all need to get beyond the manufacturer’s advertising and propaganda and truly understand the system to make an informed decision.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/19/2005

Cindy,

I am more than a little bit impressed. You have done some homework and thought through some issues better than most.

One thing I would like to remind everyone as you read manufacturers' literature and claims (whether it be for ICF, or anything else) - the engineers are not the ones writing ad copy. I doubt there are any marketing majors in the engineering department, and I'm pretty sure the reverse is true also. You need to get beyond the marketing hype, look at the basis for it, and talk to the people using this stuff in the field - real-world experience does not always match with ad copy.

Good luck. ICF is a great building technique, and all the more critical in Florida.

Ken


Building Phase  >  Exterior Trim Work - Responibility?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/17/2005

Who is doing your siding? I would tend to think it is this person responsible for exterior trim.


Miscellaneous  >  Owner-Builder Economics
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 7/12/2006

Nice job on what appears to be a fairly complex house. One thing I would like to emphasize, especially as most people are not dropping $400K-$500K+ on an O-B project (at least not that I am seeing) is that there are greater savings as a percentage of overall project costs on smaller less complex houses. Your example serves to illustrate that novice O-B builders are not limited to square simple boxes and should not necessarily shy away from more complex projects, as long as they aggressively manage the project.

As to median income, I like to bring it back a little more local. In my area, median income is closer to $53K, still illustrating a significant return on investment with your time. However, I doubt too many median-income households are putting this kind of money into a house. O-B households building closer to the median level can also save more money on a house than they make in a year pre-tax.


Building Phase  >  Under the Slab: What Kind of Insulation?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 5/5/2010

I’ll share my experience here. Let me preface this by identifying I am not in your locale, but I am in Kansas City so you can compare climate data.

 

I would not get the foil bubble-wrap insulation underslab. This is radiant barrier, which is effective for radiant insulation provided you have an air space or void. What of conduction or convection? Put a cold ground surface in contact with the radiant barrier (no air space), and you simply won’t get insulation. I guess this is where the bubble-wrap part of the insulation is supposed to come into play compared to simply radiant, but I think you will find that this is insufficient airspace. Now get down to Texas and use this in your attic; I think it would prove its value. In an underslab install in a cold climate, I don’t think so.

 

As to underslab insulation, I bucked conventional wisdom and didn’t install any. Whoa!!! Let me reiterate this, I have no underslab insulation. What I do have is ICF walls, crushed stone inside my footers (level excavation, footers are not in trenches) to bring the bottom of the slab where I wanted it, and then the slab over a vapor barrier. In my previous house, there was a thermal connection between the foundation and the slab, and that slab was cold all the time (like wool-socks-and-boots cold). In this house, there is no thermal connection to the foundation (ICF walls, no continuous connection to the footers) and only to the ground underneath. This is barefoot-in-the-wintertime comfortable.

 

However, my plans did call for underslab insulation. It was my ICF subcontractor who suggested a cost savings by eliminating it. There is some discussion of the technique in this thread – ownerbuilderbook.com/forum/messages.aspx?ID=2196. I would tell you that this works. If I wasn’t so sure and wanted some insurance, I would have put one course of insulation board only at the edges of the slab to thermally insulate it. I do not have radiant floors though, and can see some value in that you want that heat to go up and not down to the ground. However I can tell you that I can heat my house with basically no forced air, so I am not sure how much hot water would be pumping through the system anyway.

 

As to garage, again I have no insulation. My garage temp never drops below about 44-F in the wintertime. It also never gets above about 80-F in the summertime. No HVAC intervention. I wish I had this data when I was originally sizing my HVAC, because it’s critical to know how much tempering takes place with ICF construction. As to radiant in the garage, cheap insurance is perhaps that you space your tubing much farther apart that you might expect? Or how much do baseboard radiators cost in comparison to radiant tubing in the floor? Perhaps I would stub out for a future connection to a baseboard radiator instead of tubing in the floors (if needed at some point in the future)? Now if I had a workshop in the garage and intended to use it year round, I can see where heated slab would be much nicer – but I don’t.

 

I would never pour a slab 2” thick. Perhaps 2” on all sides of the reinforcement, or 2” thick above the radiant tubes. But 2” total thickness is a very thin slab.


Planning Phase  >  Septic Systems and Pumps
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 7/6/2006

Don't make the decision based only on the septic system. Look at the house as an entire system and design to the entire system. There are some unique challenges to placing your house on a crawlspace foundation (option #3) in the hot humid south that must be considered (crawlspace needs to be conditioned, tight, non-ventilating), and you don't want to make decisions with far-reaching ramifications based on your septic system alone.

For me, I would elevate the house to the proper level and let gravity do what it does best (option #2). This also gives you enough elevation change to adequately drain rainwater, footing tile drains, etc. to daylight, again eliminating a pump and reducing a potential future moisture problem. Your landscaping can pretty much hide your elevation difference. You mention that other houses in your area are built this way, making it somewhat a potential standard that your house will be compared with at a point in the future when it's time to sell.


House Features  >  Propane Gas/Electric/or Geothermal HVAC???
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 8/3/2005

John brings up a good point that is often overlooked. When we look at HVAC options, the first person we call is an HVAC tech or an HVAC company. They analyze the situation, and if they are good, present us with several options for what might be the best system to meet our needs. However, the only tool they have to offer are HVAC solutions, because that is either what they know best or what they sell. There is an old adage that goes something like this, "when all you have is a hammer, everything looks like a nail."

Your house is a system. It is interconnected. No component of that system works independently without affecting other components. Your windows, roof, framing, insulation, and construction techniques all impact HVAC. The HVAC tech may tell you the best HVAC components to meet your design criteria (I want to maintain XX temperature during these conditions). However your HVAC tech does not understand the entire system. It may be more cost effective to downgrade your HVAC system and use this money to upgrade your insulation or windows, change your construction techniques to a "tighter" construction, etc.

When I looked at my system as a whole, applying principles of engineering economy, I found that the most "cost effective" (combination of up front capital costs, long-term maintenance costs, and long-term operating costs, the long-term costs all brought back to current dollars using a reasonable rate of return) system was actually an 80% furnace with a 10 SEER A/C unit - the least efficient unit on the market today. However I also have tight construction, ICF, R-50 in the roof, light gray well-vented roof (as opposed to something dark like slate), and constructed to Department of Energy recommendations for my climate. My system is so efficient that upgrading my HVAC system to save money simply isn't an option.

That said, I put in a 90+% furnace (my installer upgraded me for free since I direct-vented my hot-water heater and he didn't have to run the vent flue; basically he gave me more equipment and less labor for a wash), and a 14 SEER A/C. I upgraded to a variable speed, two-stage furnace because I knew this would have comfort ramifications. However I also understand that the extra money I spent basically is an upgrade only, and will never pay me back in long-term cost savings. In my climate, for my system, geothermal was just money down the drain with no hope of recovery.


Planning Phase  >  Foundation Walls with ICFs
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/14/2005

Filter the messages at the top of the forums home to filter only messages with ICF. Most of these questions have been asked and answered. There is a tremendous amount of information in these fairly recent threads (I filtered by 90 days old or newer). Most of the information you are requesting is already here.


Planning Phase  >  Footing Forms and Drains
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/16/2005

While I investigated the Form-a-Drain, I ended up not using it due to price considerations, lack of size availability for the footings I wanted to pour (my footers are all 24" wide, 12-14" thick, thickness varied to keep the top of footings level within +/- 1/8"), not available in angles besides 45-degrees (I have 30-degree angles), and the ICF construction contractor I had seen using it seemed to be damage them fairly easily (although the contractor swears this is the best footing system ever).

As a cost savings, we used pressure-treated wood for the forms. After the forms were stripped, they became the lumber source for the window bucks for my ICF house. I needed footing forms and window bucks anyway, that I could use one piece of lumber to accomplish both was a simplification. Now if I was using V-Buck or some other window buck material, I would have looked more seriously at the Form-a-Drain.


House Features  >  Ceiling Paint - What Did You Do?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/16/2006

Congratulations on your progress. Sheetrock finished is an important step, and very dramatic, as you now have something that looks like it could be liveable someday.

I went nontraditional on my paint and used satin. Satin is more durable, easier to clean, but the sheen will show every imperfection in your wall or ceiling, and is also a bit trickier to apply. I would not have selected satin unless my sheetrock was very good. I didn't understand the correct terminology for sheetrock finishing, so I got "Level 5" throughout, which is skim-coated and the highest level of sheetrock finish. Even though the sheetrock looked great, the satin finish paint showed imperfections that you didn't see until after it was painted. Most people wouldn't notice the difference, but it is one of those details that I notice and like.

For the ceilings, I used the same shade as the walls but in a lighter tint - did that make sense? Let me try to explain it differently. On my paint chip there were six tints of the paint color I was interested in. The walls are the third tint down, for the ceilings I used the first tint down. It is almost white (IIRC the shade name was "billowy down"), but looks very good with the wall paint color. I used satin finish here as well.

Something to think about when I asked a painter why they used so much flat paint (I assumed it was because flat paint is cheaper, cheaper paint means more profit). He said that when you use a sheen (eggshell, satin, semigloss), every time you paint it you get more sheen. So if you need to touch-up your wall, you would need to paint the entire wall or you would forever see the repair as a different sheen. He said that with flat paint this doesn't happen. I don't know how much professional painters only do touch-up work and not entire walls, but this is something that I hadn't thought about.


Miscellaneous  >  Charge for Takeoffs? Is this normal?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/14/2005

I'll second Peter and John.

When I was getting lumber bids, I let several lumberyards do their own takeoffs. For comparison shopping, this was an extreme waste of my time and theirs as when the bids came back, quantities were all different, pricing schemes were all different (one lumber bid came back with 2x4s priced per 1,000 feet - how many 2x4s is this when comparing it to an 8' 2x4 from somewhere else?) The easy solution, I did my own takeoffs and faxed them to the lumberyards - now I can price shop.

Home Despot is a Home Improvement Warehouse, NOT a home building warehouse, big difference. My lumberyard will beat Home Depot prices, I don't even have to ask (they are lower all day, every day). I get great service (just call Frank), if I have questions about framing they know the answers, if I have questions about code and don't want to bother my code inspector, yet again they know the answers. Delivery on short notice - no problem.

Based on Home Depot Customer Care policy, I could take their bid in and Home Depot would beat it by 10%. I could then use a 10% off coupon for an instant 20% savings. But what do I lose in level of service? Also I like to put all suppliers on equal footing when price shopping, and I tend to think big boxes deliberately undercutting the smaller shops and selling at a loss to push them out of business is an unfair business practice that I tend to not support. Now if Home Despot beats them on price on equal footing (I have ordered doors and tub from Home Despot), then I will do business with them.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/15/2005

If you want to get them to price match, don't ask the store manager first. The first call you make is to Customer Care and find out the corporate price match policy. Then when you ask the manager to price match, and they refuse, you can call Customer Care again and have the manager explain to them why corporate policy does not apply at his store. Then ask who gave him the authority to override corporate policy.

They will price match on lumber; you just have been asking a little too friendly without adequate understanding of corporate policy.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/30/2005

No house is ever built according to plans, I agree, but it is not only the owner that varies from the plans or requests modification.

For example, my plumber missed a chase wall in his underground plumbing. Two ways to fix it, with the jackhammer or move the chase wall. I chose to move the chase wall.

My footing contractor got mixed up in his measurements, part of my footing was 6" too long, which wasn't that big of a deal because another part was 6" too short (at least he kept it square). Two choices, one involving a jackhammer. I changed the floorplan to accommodate the "modification."

I don't appreciate the implication that only "owners" make changes to the plans. Sorry, you get subcontractors scaling off prints using a tape measure when they are too lazy to find the actual measurement that is on the print (and if they asked, I have a full electronic set and can get any measurement they wish from my laptop accurate to fractions of an inch), and you get variances from the plans. That is just the way it is, live with it. All changes to my plan were in response to a subcontractor messing something up and me fixing it; none were initiated by me.


Missouri  >  Lot and Construction loans
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 7/3/2006

The difference is the first loan is for construction, the second loan is for mortgage. Mortgage lenders won't like to lend on uncompleted houses. The construction loan is like a business loan to allow you to build the house, and is higher risk (and therefore higher interest rate) than the mortgage loan since there is really no collateral (a partially finished building is not considered collateral).

If you think of it as a general contractor, they need a loan to have finances to conduct business (build a house). When they sell the house, the buyer procures a mortgage to pay the general contractor. In the case of a construction loan and a mortgage, you happen to be filling both roles (GC and buyer). The way to save a bit of money is to find what is called a "Construction to permanent" or something like this, one closing with one closing fees. The bank I used (which I do not recommend BTW so won't put their name on the Internet, email me if you wish through O-B Connections) offers just such a loan. Basically they offer a construction loan and sell it once you get occupancy and need to convert to permanent loan. Once the mortgage is sold, the construction loan is satisfied and closed.


Construction Scheduling  >  Framing schedule
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/16/2010

Nice starting point, if I gave that to residential framing crews in my locale they would run and hide.

Right off the top, you identify that framing materials are supplied by owner. If you are supplying the materials, why do you need to spec them out? 1/2" OSB for the roof, 3/4" OSB for the floor, galvanized screws, etc. I found plywood cheaper than OSB for the floor, I substituted that, and since I was supplying materials...

I also feel bad telling them they need to work to code, that is almost assumed. And what if the contract is sub-code (something got transferred wrong), I need a change order to bring it up to code? I like to adopt the relevant code as a whole in the first line (All work not otherwise specified on the plans is in accordance with IRC Code...). You also give the code enforcer much more credit than I do.

Now that I have materials and code established, I like to focus on what makes my job different.

1) You have wall framing, you have roof trusses, I am very specific how the two come together as this is a common failure mode during high winds (standard toe-nailing techniques are very weak here). I like hurricane straps here. Since I provided them, the framers used them, and while they had never used them before (I ordered them from FL) they are pretty self-explanatory. My framers really liked these, my builder decided he would incorporate these into future projects and they are now available locally from at least one source.

2) Sill plate and anchors, you have some specifics here. I would suggest that rather than standard washers, that larger load plates are used. I have found another typical failure mechanism is that standard thin washers don't adequately spread the load, thus leading to failure. And what if the J-bolt doesn't quite line up - they drill a bigger hole in the sill plate to make it work. Are there any points you want better connections, perhaps something from Simpson or USP Structural Connectors? Granted, these get cast into your foundation.

3) Between bullet points 1 and 2, think "continuous load-path engineering" and how you might like this incorporated into your house? Hurricane areas, earthquake areas, these get them in the building codes (or they should - New Madrid fault areas have no such codes). The rest of us, not so much. However there is much here that is applicable everywhere, and your framers may not understand the connections. However with a bit of education, they can (this isn't extra work, which is why it is so disappointing that it isn't widely incorporated into residential construction).

4) OSB exterior sheathing, you provide some information here. However there is a proper way to install this to add considerable uplift resistance, and there is the method that gets commonly used (your spec allows for either technique). Research construction in hurricane states to understand the proper way and specify it. There is a minor change here, but it makes a significant difference on the wind (uplift) resistance of the house. FEMA and the state of Illinois collaborated on a Windstorm Mitigation Manual for light-frame construction following a tornado in Urbana; there is much good information here that is easily incorporated into residential construction. Unfortunately, it seems to be out of publication.

5) Do you want the wall studs and trusses aligned? Makes a nice detail, but you need to reduce spacing on your trusses. This is common with light-gauge steel construction, not so much with wood.

6) To get details I would include in specs, I would read over at the APA internet site (Formerly American Plywood Association, but now Engineered Wood Association, although still APA). They have free publications for both residential and commercial wood framing - much good stuff here. This covers your framing information.

7) I like to eliminate gray in my specs; either you meet them or you don't. Things should be straight and true? That's a spec?

Now then, you start putting all this into your specs, and you are going to really scare these framing subcontractors. I like to use this as a collaborative approach and discuss my expectations with them, sharing what I have learned from such reputable materials as the APA publications, continuous load-path engineering, the Windstorm Mitigation Manual, proper flashing techniques, James Hardie information (I built ICF, James Hardie specifies a bugle-head stainless screw, yada, yada, yada for attachment. I provided the screws, I provided the James Hardie information, I said you do it this way, and for your future reference I got the screws from XXX source), etc. I find that good subcontractors are always looking for an edge on their competition, and me taking the time to train them on proper techniques gave them an edge they have used after my job ended.

Now understand that my model isn't so much a straight business relationship, so I only invited subcontractors that weren't looking to hose me, as I provided them much opportunity to do so (OK I confess; I got in a hurry and invited one who tried to hose me; he lost). This technique doesn't work for production builders, spec builders, commercial construction, or anyone who is looking at strictly a business aspect to building a house. Also note that these wouldn't be low bidders in an open-bid process, but they are craftsmen who appreciate working for someone who understands quality. Your build isn't a government contract open to all bidders; you get to select whom you send the plans to, so only select good-quality subcontractors (preferably reference, but at a minimum if you are cold-calling or don't have a reference, check out examples of their work). When I selected professionals and treated them as professionals, I got professional work. When I short-circuited my selection criteria, I generally wished I had taken the time to do more research to only invite professionals.

I found that many of these subcontractors brought prospective clients to my house during construction (or incorporated my house into their internet site or business brochures) - that they exhibited that level of pride in their workmanship reinforced that I hired the right subcontractors.


Planning Phase  >  To Spec or Not to Spec
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/16/2010

Framing schedule is an interesting link over on the construction scheduling part of the forum of a similar topic.

I rarely wrote detailed specs. I learned from some friends that did; both construction project engineers for very large commercial projects (that require very detailed specs). They treated their residential build the same way as a large commercial project, and then wondered why they didn't get anyone to bid on their project. They thought it would be easy to get bids since their expectations were clear.

Please note the caveat here, though. You need to select good subcontractors. If they are out to take advantage of O-Bs, not having specs gives them much opportunity to do so. However, these weren't the subcontractors I desired to have on my job site. The one time I didn't do my due diligence on selecting a subcontractor to bid cost me far more time and headache after the fact than it would have been to prescreen them better.


Building Phase  >  Who Installs the Bathtub?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/14/2005

The plumber installs the bathtub.

However, make sure the framers account for the size of the tub when they do the framing. Frequently they just frame using 16" o.c. with a typical door (whatever is drawn on the plans). However, then the plumber gets in there and can't fit the tub into the bathroom. The plumber cusses a bit, swings a big hammer, and now you are short a couple of studs so the bathtub can actually get in the bathroom. You call the framers to fix this, and they cuss the plumber.

Actually, since everyone already bid it firm fixed price, it really is only a minor inconvenience for you, however it is also easily avoided. You would think these trades work together enough to be at least a bit considerate of the trades that come after them. There was one day I thought the HVAC tech and the plumber were going to take it outside - F this, F that, I'm gonna kick your... I was glad I was there to defuse the situation.

I did all of the interior framing myself and coordinated with my plumber beforehand, so I avoided this issue entirely. It is minor details like this that the trades really do appreciate.


Planning Phase  >  A Little Overwhelmed
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 5/21/2008

Welcome to the forums. Many of your questions have been answered in past discussions. However I will provide some information as I would do it.

Since you are wishing to build with alternative techniques and materials, you need to make sure your architect understand this so that the design is friendly to these methods, or more importantly uses these methods efficiently to get you the maximum value for the money you are spending.

I also like to share preliminary plans with some of the trades to ensure the plans are sufficiently "friendly" to their trades. Trades where this might be important are your SIP supplier and carpenter assembling the SIPs (I would consider this critical), HVAC (I would also consider this critical as ductwork can take a significant amount of space). Maybe plumbing (you don't want a critical piece of structure at the same location as a toilet for example), probably not electrician (wiring can move around a lot of obstacles). I wouldn't expect them to take much time, but I find them to provide informal feedback at this stage that is greatly appreciated when they actually get into construction. In fact the subcontractors I consulted with ultimately didn't do the construction, but the subcontractors I hired were more than suitably impressed that their trade was considered in the house design (which apparently happens not at all, a failure of the system in my mind).

As to favorite books, I have to say that my list might be different as The O-B Book is much improved over what I initially read (and thankfully due to this website you should already have the latest edition), the Construction Bargain Strategies book wasn't available when I built (but I have since skimmed this and would say this is a mandatory resource). I would also purchase "Better Houses, Better Living" by Myron Ferguson, again I have the previous version and have to admit I had so many Post-It notes in a borrowed copy that I had to buy it as I simply couldn't compile that mass of information any better way.


Construction Bargain Strategies  >  materials--tile in shower
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/10/2005

Go over to johnbridge.com and read their forums. As I understand it, a waterproofing membrane such as Kerdi should not be used over cement board, but should be used over regular sheetrock. Other brands may be different, but the johnbridge.com forums are the best resource I have found on tile work.


Miscellaneous  >  Anybody used HD "At-Home" Services?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 5/26/2006

In my area they offer the same type of services. Let me reiterate a couple of things here:

1) Home Despot does not employ siding installers, HVAC technicians, roofers, etc. These are all subcontractors to Home Despot, they also do their own subcontracting.

2) Home Despot makes a profit on setting up these installations. As I understand it, Home Despot makes about 25%-30% off the top on the installations. The contractors actually doing the work also have their overhead and profit. Why pay for two sets of overhead and profit?

3) One of my subcontractors runs a crew entirely dedicated to Lowe's installations. He told me the difference in installation prices he gets from that crew through Lowe's, what he is charging me, and how much Lowe's makes just setting up these installations.

4) I would use this for bid purposes for the bank only. You will get better bids elsewhere and equal quality work, perhaps from the same subcontractors Home Depot is using. Home Depot offers you nothing except convenience, and even that is debatable.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 7/25/2006

I want to clear up a big misconception here. Just because you used HD "At-Home" Services, and paid through HD, don't think for a second that you have HD backing the work with their name and reputation. Find someone who wasn't happy with the HD "At Home" installation, and the trouble it takes them to get things corrected, and you might just change your opinion.

HD backing and commitment to work simply does not exist, except in their marketing department.


Planning Phase  >  What are the costs of engineering consultation?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 8/27/2004

I am partway through building my ICF house too, and from a code approval standpoint it wasn't a challenge to get the permit, but from a code inspection standpoint the inspectors get glazed-over looks on their faces when trying to tell if it meets code. My house is so overbuilt in trying to assuage them. I figured I would have difficulty with code inspections, so my architect went the extra distance with footing design, rebar schedules in walls and lintels, etc.

The goal was for the code inspector to be able to do all inspections without opening the code book (and as side note for me to be able to do oversight of the subcontractors also without opening the code book). The inspectors always ask if my architect will come out and do the inspection for them, and I always tell them I am willing to call him for an inspection if they are willing to pay his hourly rate and mileage, and then ask what am I paying exorbitant permit fees for if they can't even inspect a relatively simple structure?


Planning Phase  >  Electrical Service Meter/Water Service/Energy Code
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 12/3/2009

This strikes me as odd. They will run new capacity to new customers for no charge, and yet they will not entertain upgrading capacity for existing customers. I guess once they have you established as a customer, you really don't have any choices.

However what this does is illustrate that practices are different in different regions. I know I had to pay for the power company to trench, run conduit, and install a new transformer. I argued with the power company that once the transformer was in place that it would serve more than one customer in the future, so I shouldn't be on the hook for the entire transformer cost, since I was required to bring far more capacity than I needed as one customer. I even approached my adjacent landowners knowing that once I brought power down the street that they would directly benefit, so would they be willing to absorb some of the cost?

In the end I ate the entire cost. Why would adjacent landowners volunteer to pay for part when I was on the critical path and they weren't? As I predicted, there is more than one house tied into my transformer. You win some, you lose some, and what choice did I have besides not building?


Planning Phase  >  Modern home construction methods
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 6/26/2006

I would use ICF with a SPEEDFLOOR system (steel/concrete composite). I would leave the ceilings unfinished to show the steel beams/ I think it would really work well with the modern architecture, very loft-like. 

However depending on the floorplan, ICF may not be the best method. Although a few minor adjustments and it would probably work quite well. If this is urban infill, you have to take in to account traffic considerations for getting your concrete pump and trucks in there, as each step (ICF pours and concrete floor and roof) will require both. This isn't much different than using precast/tilt-up or SIP, you would have to be able to get a boomer in there.


Planning Phase  >  As-drawn vs. As-Built - Where is the line?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/24/2010

Here is how I would approach this question – have you called your building department? I would think that for ICF, this is enough different that this better be included on the drawings. When I changed ICF source from ECO-Block to Amvic, my building department wanted a fresh set of drawings as they wanted to verify code compliance for Amvic block. I attempted to explain that the concrete and steel stayed the same, and the strength of the ICF wall is concrete and steel. I then asked if they needed separate drawings for wood forms than they would for steel forms. They didn’t appreciate my attempt at humor; therefore I paid my architect to revise my drawings for Amvic.

As to vapor barrier, I wouldn’t expect this to be shown on the drawings, and could be a function of the formwork (as an example, Fab-Form is a fabric form).

As to hurricane straps for the trusses, I found that the truss designer designs not only the trusses (duh) but the connections to the building. I would assume that if your building method clearly exceeds the drawings (hurricane straps) that this wouldn’t generate questions in my locale. I used hurricane straps, as these were actually a cost savings. I had to order them from Florida. They are now stocked locally, and my ICF subcontractor appreciated the education on a method he wasn’t familiar with. The carpenter crew installing the roof trusses had never seen them before, but they are pretty intuitive on how to install and this didn’t slow them down.

As far as the slab thickness, who would know?


Construction Bargain Strategies  >  Basement
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/30/2010

Mary,

My comments were not directed to any one person, but to O-Bs in general. We have no problems hiring carpenters, electricians, etc. and we make the assumption that they will do good work. However, O-Bs in general don't hire independent inspectors for the important quality-assurance function. A lot of the drive behind O-Bs is to save money, and it's really hard for us to justify to ourselves that spending money on inspections/expertise can really save money overall. And while all of these trades talk code compliance, I found none of them actually had a code book in their trucks. My code inspector didn't have a code book in his truck either, and there were several times he told me things were not to code that once researched he agreed that my interpretation was accurate. Also code minimum is not what I necessarily consider the hallmark of "quality."

And yes, we have certainly migrated this topic far beyond the OP's question. Even though I am a moderator and Mark likes these to stay on track, I am probably one of the worst offenders ;-).


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/24/2010

Andy,

Welcome to the forum. I think you will find the answer to your questions is, "it depends." A couple of calls to contractors in your area will answer these questions.

Around here, basement contractors tend to be turnkey solutions. You call a basement contractor, they bring formwork and concrete pump, and order from the readymix plant. Sometimes they bring their own insulation, sometimes they bring waterproofing options; but these are not necessarily hard and fast. You do need to make sure they know where to install your tie-downs or j-bolts for your house, as well as brick ledge if you need it.

While they do not bring excavators, I would ask if they have excavators they like to work with. They appreciate a level excavation, and they might be able to guide you to good excavators that make their job easier; alternatively, they might suggest avoiding other excavators. If they know who your excavator is, they may have a bit less frustration factor in their bids (or a bit more).

I would recommend going with big footers. Labor is fixed here; the only change is material cost. Big footers are cheap insurance. As this is something completely invisible to the end consumer on mass-produced houses, I find that many GCs tend to skimp on this critical piece of the house. I would also load these with steel; again cheap insurance.

While very uncommon, I really like a moisture break under the footer that ties into the vapor barrier used under your basement slab and ties into your exterior waterproofing membrane, this provides no path for moisture to migrate in the concrete foundation wall. Concrete is porous, and capillary forces allow it to wick water from any moisture source. You waterproof the outside, you put vapor barrier under the basement slab, but unless you address moisture barrier under your footer you can still have your basement walls wick water. I didn't use bag forms myself (Fab-Form), but these look to be an easy solution here.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/24/2010

Please read the Department of Energy, Energy Efficiency and Renewable Energy Insulation Fact Sheet - there is also a link to a Basement Insulation Technology Fact Sheet (a PDF file) that is also informative.

As to underslab insulation, I am up in the air on this. I didn't install it, but since I used ICF, I effectively insulated the walls below grade on the exterior (as recommended by DOE). ICF also insulates the interior walls, and my slab doesn't have direct connection to the concrete basement walls. My basement is barefoot-warm in wintertime, so no issues. My previous house had concrete basement, concrete slabs, and that was wool-socks-and-boots cold regardless of air temperature or thermostat setting. As a compromise, I might just insulate one width of panel around the perimeter. Now then I didn't exactly risk too much here, as my ICF subcontractor didn't have underslab insulation on his house. Being as he is in the same climate, I had a pilot project to follow. In fact, it was he who recommended I could save money by avoiding unnecessary underslab insulation.

As to who brings stone, you need to look at the sequence. I assume you mean underslab stone. You need to have your plumber in there to do underslab plumbing installation before the concrete slab gets poured. Your plumber needs to have the stone to set the slope properly on the underslab drain, waste, and vent system. Hence stone goes in, plumber comes in, inspector comes in, (plumbing inspection), stone cover for plumbing goes in, flatwork concrete comes in, and they put in vapor barrier and rebar, and then the concrete readymix truck shows up. GC brings in the stone; it gets placed before the flatworkers show up.

Now there are always exceptions. For my build, I brought in a big pile of stone. The plumber identified where he needed stone, he brought in labor to place enough stone to satisfy the plumber (he built this into his bid, no surprises here; communication is critical). After the plumbing inspection, I brought in a Telebelt with the flatwork crew, between a Bobcat and the Telebelt, we placed the remaining stone in short order. As the stone was being placed, it needed minimal level (that Telebelt gets it exactly where you want it - depending on the operator, of course), vapor barrier went on, reinforcing went in, and then readymix trucks showed up and we used the Telebelt to place the concrete for the slab. However specialized machines like Telebelts cost money, like big money, like more money than concrete pumps. Considering that it placed that big pile of rock as fast as the skid loader could load it onto the Telebelt, and then considering that concrete readymix trucks could turn around quick, sometimes you have to spend money to save money ;-). And big fun machines like this make great pictures that most don't have.

As to getting local subcontractors to adopt new work practices, I considered it education. It was my job (as GC) to educate my subs on better ways to do their jobs. It truly gave me some credibility with the subs that I understood their jobs. And given a competitive environment, I figured that their education was something they could incorporate into future build jobs. And as many of these "better" techniques also include cost-saving techniques, hey that extra competitive edge that they just learned about seemed to be well received. And I know for a fact that many of them have used this competitive edge on future jobs, so it really was win-win.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/28/2010

You are correct, I have had a bit of construction experience. However, my residential construction experience was limited to volunteering for Habitat for Humanity (I picked up a subcontractor or two from this source). Every one of my subs knew I was in the construction industry somewhere, yet none of them could identify where. Some of this comes simply from using the jargon.

I did have two residential subcontractors I used as mentors. I wasn't competing with them, therefore they were willing to help. And they added credibility if/when they referred subcontractors to me. It was also nice to discuss techniques with them, subcontractors, even borrow tools. Now then, this is why I also didn't hesitate to bring in big tools (Telebelt, concrete pump, boomer) that you rarely see on residential projects (granted ICF requires the concrete pump, but large-scale equipment certainly wasn't absent).

I have encouraged many O-Bs to volunteer for Habitat or other residential construction charities (Habitat not being my favorite, but there is probably a chapter near almost everyone). You will learn a tremendous amount, in a controlled environment, on a small scale. And don't be the person pushing the broom, be the person asking questions, talking to the trades, and absorbing everything they have to share (and hey, they need manual labor too).


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/29/2010

As I reflect on this situation, you are falling into a trap a lot of O-Bs fall into. Here is a lesson for all potential O-Bs; as the project manager you need to know your limitations and hire expertise to fill the gaps. If you are not a        fill in the blank here (framer, HVAC tech, electrician, plumber, etc.)   , you hire this expertise. So if you are not an expert in building trades, why do you not hire this expertise? There are a bunch of little pieces that get put together; you better know they are put together properly. Also given the complexity, this means there are a bunch of things that can go wrong, and a bunch of unscrupulous subcontractors that are willing to take advantage of your inexperience. However, as a first time O-B, you are under no obligation to not have this expertise on your project team.

 

So where might I look for expertise related to building trades?

 

1)     Can you learn this? Either by experience, classes, or by reading books. I wanted to build ICF; there isn’t a whole lot of ICF builds going on locally. I took the training class, as offered by the distributor. Great, one day of training makes me a certified installer. OK, I read the manual cover-to-cover many times. And then I volunteered on another O-B’s ICF house (who doesn’t relish the opportunity for free labor?). It was only based on these three things that I felt comfortable going down the path of ICF, and I hired an ICF subcontractor (this didn’t make me experienced enough to pour my own house, this only made me experienced enough to properly qualify and hire a subcontractor).

 

2)     Can you hire someone that has this expertise? Clearly yes, but where do you look? I might suggest one of the following:

 

a.      If you finance, the bank will have an independent inspector review the project periodically to make sure they are getting commensurate value for their investment and that you are managing the project sufficiently. While these inspections are somewhat cursory, the person doing the inspections is experienced in building trades. Perhaps you can hire this person as a consultant, although there may be conflict of interest issues related to their providing services to the bank, so maybe not.

b.      What about a retired GC? I have met two types here; those that this is what they do, and those that this is who they are. You obviously want to avoid the former, because what they do is pinch every dime out of a build to maximize profit. The latter, they are proud of their name/brand, this is who they are and they built quality. But this trade takes its toll on a person physically, so they retire.

c.       Don’t overlook the insurance industry. I don’t mean a retired medical insurance coder here, or even your friendly agent. But who does your agent call when property claims need to be made? You want someone who has done property and casualty claims. These guys know building sciences, and more importantly they know proper techniques that should be incorporated. Personally I would put these at the top of the list of who I might look for to fill this gap.

d.      House inspectors. You wouldn’t buy real estate without an independent inspection, and they frequently have to make assumptions about things they cannot see. So why not use them periodically to make sure the quality is built in before the sheetrock goes up? Now then, there really isn’t a formal certification process here, so you certainly want to screen these before you start calling out of the Yellow Pages.

e.      If you have an architect or designer, perhaps they have a service. Now you don’t want your architect out there pulling a slump cone from the concrete truck simply because that is a lot of hourly rate to pay for this. I wouldn’t necessarily limit this to architects, but engineers as well.  Again, these professions like to stay attached to their trades, so even if retired they are frequently willing to provide some part-time services. My architect was retired and worked out of his house (low overhead).

f.       Retired code inspector. So why not rely on the minimum code inspections then? Good question. Code inspections are based on a number of things, and statistical analysis is one of them. A code inspector may hit a couple of spot items, and if you did them correctly then the assumption is you did everything correctly. They have targets and metrics, and performing a thorough inspection may not be what their employer is paying them for. Your municipality may be more about quantity of inspections; taking a back seat to quality or thoroughness of inspections. Also they are looking for minimum code compliance and frequently focus on issues of life safety, not good construction.

 

I offer this as a caution; subcontractors don’t like to work jobs with engineering or architect oversight (and I assume anyone they would view as nitpicky experts, but they claim engineers are the worst), and they will raise their bids to deal with this headache. Best to keep these inspections to off-hours when the trades might not be present. They need to hear from you, you are the project manager. However, they don’t need to see everyone on your construction team either.

 

I offer an example of why you need this expertise. One day I left my ICF subcontractor with three pages of punch list of things that had to be done prior to calling for an inspection (these were all either code violations or quality variances that I wanted corrected. As an O-B, when the inspector comes on-site I want it to LOOK GOOD to establish my credibility). My sub called me about noon, said the inspector had come over and signed off and they were ready to bring concrete tomorrow. I said, “Wow, you really finished that punch list quickly, I didn’t anticipate this getting done and the inspector coming out for a couple of days.” He responded that no, they hadn’t done the punch list, but since it passed inspection it was good enough. I explained that he worked for me, not the building inspector, and that punch list was mine. I further explained that we would go over it item-by-item before the concrete pump shows up, just to make sure it is all done. Concrete didn’t get there until next week, but you can bet that every window/door, etc. had properly-tied rebar, every penetration in the concrete was there (actually I missed a couple), and that I knew exactly what was behind that wall and was satisfied that the quality was top-notch. Let's just say that next time I left a punch list of items, there wasn’t a lot of question of what might be optional.


Building Phase  >  Best tile grout sealer?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 6/26/2006

I don't have an answer, but I know where to find one. Go over to the forums at johnbridge.com. Best resource for anything tile related on the Internet.


Building Phase  >  Textured vs. smooth sheetrock
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 9/3/2009

Skim-coat an entire wall is Level 5 sheetrock finish? I doubt you would find a custom home around here with that level of sheetrock finish. I would use this level only on walls that will see direct sunlight, walls with wall-washer lighting, or something that draws attention to the wall itself and you need a perfect finish. That said, this is a very high level of sheetrock finish, and totally unnecessary to get smooth walls in most situations. I guarantee it looks good.

BTW, this is the level of finish I have throughout my house; but then I didn't know what I was doing when I talked to the rockers, and when they were done it was too late. Perfect walls though, so no complaints there.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 9/4/2009

My rockers used Bazookas (another taping tool besides a banjo). Pro tools definitely make the job faster and easier.


Construction Bargain Strategies  >  Windows
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/1/2005

Try replacement-windows.com - I learned a lot from this site.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/1/2005

My personal opinion, as previously stated on the board, is that you can get much nicer windows than Pella, Andersen, or Marvin for much less price. Do they carry the "name" the big three do - obviously not.

While Pella, Andersen, and Marvin do have some nice lines (the Architect Series for example), they also have builder's grade junk I would not want in my house. I have seen more failed Pella ProLines than any other single window. Unfortunately these are still "Pella" and therefore carry some sort of cachet. JMHO.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/1/2005

I agree, Pella ProLine is builder's grade. But your previous post said something about quality and value, and you get neither with Pella ProLine. However, you do get the Pella name. Andersen and Marvin also have lower-grade windows. True, they do have decent-grade windows, I just don't see them used.

Around here they use Pella ProLines in $1M+ houses as well. If I were paying for this level of house, get me a decent window, please. But then this is why I O-B. I couldn't get quality construction in any price range without taking charge myself.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/1/2005

I just noticed some details you mentioned. You said white trim, and you investigated fiberglass windows. I would look long and hard at fiberglass windows. They are rare in the replacement window market, and even more so in the new construction market, but I found them to be an order of magnitude higher quality than any other window out there for a comparable price.

Even window lines with lower-level windows (Milgard for example), the fiberglass offerings are their top of the line. Other window companies offer fiberglass only. I looked at Accurate Dorwin and Comfortline. I found Accurate Dorwin triple-paned, low-E, double-argon filled price comparable with Andersen 400, and looking at the two you would choose the Accurate Dorwin hands down every time. The downside is they are very heavy, and your installer won't appreciate this much. Very nice quality.

There are many other fiberglass windows available. Most of them are made in Canada. The problem around here is the only dealers are Accurate Dorwin (very small volume, all custom order only, no actual showroom) and Comfortline (all replacement market). I ended up with Milgard Ultimate fiberglass windows for significantly less than the price of Andersen 400 windows (this was my price bogey).


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/2/2005

I chose fiberglass windows just like I chose all of my building materials. I looked beyond the hype, the manufacturer's claims, the manufacturer name, investigated myself, and made my own independent decisions.

For windows, there are really only a couple of choices; aluminum windows. cheap (and look cheap), not energy efficient due to conductance of the frame, corrode in time. I found nothing of value in an aluminum window that would make me want to consider them.

You have all wood. I have all-wood Peachtree windows in my current house. These aren't bad windows, but they aren't maintenance-free. The exterior wood needs to be maintained, and this includes scraping, sealing, and painting. The windows with south and east exposure get especially beat up and require maintenance every two years. I am not very good about preventive maintenance, so despite how well they look and how well they might hold up, they simply weren't for me.

You have clad wood. This looks like the best of all worlds. You have wood interior, and you have a weatherproof exterior that should be maintenance free. The problem with the cladding is that there are seams, the seams fail, you get water intrusion, and with water intrusion you get wood rot. The problem is you can't see it, so you can't correct it. If you go this route, look at the Andersen 400 series of vinyl-clad wood windows for a bargain-priced clad window. Compare this to a Pella ProLine (a builder's grade clad window), and you will see what I mean. The downside is you get to pick your cladding color once, and if you want to change it later (via painting your house), tough.

You have vinyl. I have seen some nice vinyl windows, but I simply couldn't get past the vinyl is used for replacement windows mentality. The other problems I had with vinyl is that they are somewhat clunky looking (large frames for the amount of glass), and once again you can't paint them.

You have fiberglass. Fiberglass is extremely strong, and has a coefficient of expansion very close to the glass frames. What this means is a smaller frame to a larger piece of glass than other types of windows for a given window opening. Fiberglass windows are very efficient, as the frames are not conductive. You can order your frames any color you want (similar to cladding on wood clad windows), but you can also paint them later if you wish to change the color. They are truly maintenance free. They are one-piece seamless frames (no seams to break, no water intrusion). They won't rot. There were no downsides, except since they are such a small part of the market it is very difficult to find local distributors.

Which brings me to the local distributor issue. I looked at Comfortline because they were local. These are somewhat "clunky" looking windows (check one out, you will see what I mean). They are nice quality, proven, and pricey. I looked at Accurate Dorwin from Canada. Very nice, probably the single best fiberglass windows I have seen. The Canadian dollar gained some strength, and the currency market moved against me on these (short answer, the price went up just a bit too much). Which brought me to Milgard. We have several local Milgard dealers, however none of them carried the fiberglass line (Ultimate). Since the top-of-the-line Milgard vinyl windows are pretty nice (which says a lot considering my personal bias for vinyl windows), I took a chance on the higher-level fiberglass Ultimates. My distributor had never seen them before, but since the price was right, I bit the bullet and ordered them. I ordered all casements, awnings (basically casements turned on their sides), and fixed windows, so I can't comment on single or double-hungs, but the casements are very nice. And for the price, much nicer than any of the quality clad wood windows I would have considered purchasing.

So there you have it. I chose fiberglass for the maintenance-free aspect, value, and cost savings.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 7/12/2005

$400 a window for what size window? I would consider that a great bargain for some of my windows. Or did you simply take your total window bid divided by your total number of windows?


Planning Phase  >  Passive Solar - glazing
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 6/23/2006

Randy,

I have passive solar, and it has been awhile since I planned and I don't have the notes so forgive some of the terms I may be using. With a thermal window, there are actually four different surface coatings (such as low-E) that can be applied, and which surface it is applied on affects the characteristics of the window. You can maximize solar transmittance, you can minimize solar transmittance, same window appearance, same coating, different characteristic. 

In my area, when you get low-E glazing, it is usually to minimize heat gain from summertime exposure, as I am in a higher cooling climate than a heating climate. Actually in Kansas City, it is basically a wash between the two windows as cooling loads are only slightly greater than heating loads, but if you move further south cooling loads in comparison to heating loads increase fairly quickly.

However my design is that during the summer my windows are completely shielded from direct sunlight, so why would I want to minimize solar gain - they simply aren't getting direct sunlight. The other way to order is to maximize solar gain (a window used in northern climates) and this is what I did. Please note that since it was not "typical" for my area, I had to be very careful with my supplier to really get what I wanted/needed. In the wintertime, my passive solar works like a champ combined with ICF, tight construction, and good roof insulation - without HVAC intervention I hold at a steady temperature even on a cloudy day and drop less than 1-degree/hour F during nighttime, no wild temperature swings and very comfortable.


Construction Bargain Strategies  >  ICF Brand comparisons... Foam thickness/ R-Value
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/7/2005

You have some very good questions. Let me take a try at some answers. I imagine John from Colorado will also weigh in. I would tend to read his input closely as it is very valuable (as is mine of course ;-).

I have not seen a good analysis on thickness of foam vs. overall insulating value. I would guess that the thicker the foam, the better insulating value. However, I think the real value in ICF construction is controlling infiltration and the mass of the concrete, and not the overall insulating value. Have you ever noticed that ICF manufacturers advertise “equivalent to R-50” and not actual R-values? This is because the R-value of an ICF wall is somewhat lower than one would imagine (concrete is not a very good insulator), but the thermal mass more than offsets this because it simply takes a lot of time to change the temperature. The thermal mass serves to temper the heat extremes the house is subject to daily. Insulating values are determined in a laboratory and are based on steady-state conditions. With the thermal mass of the concrete, you will never achieve steady state in the field.

That said, I would be concerned with the strength of the block with thinner walls. I preface this by saying the commercial blocks I have seen are based on the same size CMU (concrete masonry units) for ease of converting plans, and all of these commercial blocks use denser foam, so strength should not be an issue even though the foam is thinner. If your subcontractor identifies that strength is not an issue with these blocks, then so be it and save some money. I would not focus on the cost of the ICF material, but the cost of the installation. An ICF block that is inexpensive, but is more difficult to work with, could have a higher installed cost. At the end of the day, you want a concrete wall, foam insulation, at the most cost-effective method to do so. Ask your sub which installed ICF will provide this for you. Also don't forget the other subcontractors such as plumbing - is there enough foam to get your plumbing in an exterior wall - some of my DWV vents and pipes are in these walls and we had to cut the entire 2-1/2" thickness of foam to get the 2" PVC DWV pipe in there.

As to the thickness of the concrete, you should pour thick enough to achieve the strength you need. I used 8” below grade, and this was based on having enough strength. I could have used 6” below grade, but this would have required more steel. Steel is expensive, but more importantly, if you put a lot of steel in the wall it is difficult to get the concrete to flow around it and consolidate properly, and in this area we needed the strength. We only had one area in my house where concrete flow was an issue, and it was in an area with a bunch of steel. There is really no other reason to use a thicker block than necessary.

As to the 4” concrete above grade, if it gives sufficient strength I would use it. However I would also caution that the ICF installers around here do not use 4” because it is difficult to work with. The 4” block fills very quickly, and when you are filling ICF you can’t see very far into the forms to start with, so you tend to overfill the lift and have blowouts with 4" block. The subs I have talked to said that although 4” ICF saves concrete, the installed price is greater than the same wall with 6” of concrete due to increased labor cost. It simply isn’t cost-effective to pour thinner concrete when at the end of the day the installed price is higher. However, if your ICF installer is comfortable working with 4” of concrete, you can get the strength you need over windows and doors, and it saves you money, what is the downside? Once again, I went with 6” above grade, this was based on strength of the lintels (9’ in some cases), ease of concrete placement, and cost of installed product.

Do you need an air exchanger? The typical rule of thumb is that you do. In reality what you need is ventilation, how you want to accomplish this is up to you. An air exchanger is one way to accomplish ventilation. I am not installing an ERV or HRV in my house, and this is not a typical installation. However I am installing a ventilating dehumidifier (either an Aprilaire 1700 with the ventilation option or a Therma-Stor Ultra-Aire APD), as this will allow me to control both ventilation and humidity.


Planning Phase  >  Architects - What to expect/require
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 5/21/2010

I had a couple of take-offs done by different lumberyards and had the same experience; every material bid sheet was different. How do I compare these to get the best material cost?

Taunton Press, For Pros By Pros series. One of these books is on framing techniques. One of the things this book teaches you is how to take a plan and perform your own lumber takeoffs. The book is ~$10, a small investment. Once I did my own lumber take-offs, I faxed the same sheet to a number of lumber suppliers. Not having to do take-offs to prepare a lumber bid makes bid preparation easy for the suppliers. I feel it further dictates that you (as a GC) know your business (I have enough knowledge to do my own take-offs) and respect your suppliers (I am not wasting your time, here is exactly what I need). This way when I got lumber bids, I was able to compare apples to apples. All this for just $10 and some reading time...

I would also concur that lumberyards have better prices, better service, and better quality than the big-box stores. I did my own framing; working with lumber from the yards was a luxury compared to working with lumber from the Big Orange. Granted, I could have taken my best lumber bid into Big Orange and they would have price-matched minus 10%, but that's not how I roll.


Construction Bargain Strategies  >  Is it OK to change something on plans??
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/7/2005

In my locale, changes such as these would go unnoticed and not require modifications to the plans used to pull the permits. There is nothing structural about a skylight or fireplace, unless you are not using a prefab unit for the fireplace (I haven't seen a site-built masonry fireplace for some time now).

The easy way to answer this question correctly is not through the internet forums, but to call your code authority that issued the permit.


Building Phase  >  Glue drywall on ICF and SIPs?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/13/2009

nationalgypsum.com/literature.pdf

This seems to be an industry standard. Actually I didn't know what the industry standard was. My sheetrocker asked how I wanted my walls finished. I said, "smooth." He asked how smooth, did I want level five? I asked if level five was good. He verified that if I wanted smooth, I would be really happy with level five. He then asked which walls I wanted level five? I told him if it was good, why not do the whole house level five. Well that's what I got, skim coat walls in the garage, basement, utility room, bathrooms, closets, and the living areas that really needed it. I guess if I had known the lingo, I might have saved a bit of money on that portion of my build. However I do have nice sheetrock. That said, I upgraded all my paint to satin, and it looks fantastic.

I don't know if that smooth sheetrock was necessary in the garage, but you know when I go out there every morning to drive out, at least once a week I think of the funny look on my subcontractors face when I said "level-five the whole thing". Makes me think of the Visa commercial. "Level-five sheetrock - $$$. Look on sheetrocker's face when you tell him it's only good enough for the garage - priceless." It gives me a story that makes me smile anyway, and that has to be worth something. For everyone else, I recommend a bit of cost savings. And truthfully his bid was only $300 more than the low bid, so my cost wasn't that much more (although I imagine his would have been the low bid had I known how to ask for sheetrock finish).


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/12/2009

I know when sheetrockers came and looked at my house for bids, most of them had this strange look on their face when they looked at the ICF. I had a spare block I kept at the workplace just to show them how to find webs, have them screw a couple into the webs and then try to pull them out, etc. After the demonstration, most didn't upcharge their bid prices because they realized drywall on ICF is not a big deal.

The sheetrocker I used had experience with sheetrock on ICF, and he liked to glue and screw onto ICF. When I hire experienced professionals, I tend not to tell them how to do their job, and he liked glue and screw on ICF and that's what he bid, I wasn't about to ask him screw only. I did ask him to use #8 drywall screws instead of #6; he had no problems with that and showed up with buckets of both.

I also had them provide the materials. He showed up with 4x8, 4x12, 4x16, 4x20, and some monster 5x20 panels. Not knowing how they calculate how many of each they needed, it seemed best to let them bring what they wanted. Those big panels for open rooms really make their job fast, and eliminate a lot of joints. The same subcontractor finished and taped, but as Terry identified, this was a separate crew from the hanging crew.

I asked for "Level-5" drywall, this is smooth (really smooth). You probably want this level of finish where you might get sunlight shining directly on the walls or you have wall-washer lighting. I would go one level down (level 4) for most of the drywall in the finished area. I would go one level below (level 3) that for garages and utility areas. If I am going to tile over it (bathroom shower, tub surround, kitchen tile backsplash, behind kitchen cabinets), then level 2 is fine, since it will be covered up later.

Levels Of Gypsum Board Finish

LEVEL 0: No taping, finishing or accessories required. This level of finish may be useful in temporary construction or whenever the final decoration has not been determined.

LEVEL 1: All joints and interior angles shall have tape embedded in joint compound. Surface shall be free of excess joint compound. Tool marks and ridges are acceptable. This level of finish often referred to as "fire taping", is frequently specified in plenum areas above ceilings, in attics, in areas where the assembly would generally be concealed, or in building service corridors and other areas not normally open to public view. Accessories (corner bead, base shoe other trims) optional at specifier discretion in corridors and other areas with pedestrian traffic.

LEVEL 2: All joints and interior angles shall have tape embedded in joint compound and one separate coat of joint compound applied over all joints, angles, fastener heads and accessories. Surface shall be free of excess joint compound, tool marks and ridges are acceptable. This level of finish is specified where water resistant drywall is used as a substrate for tile; may be specified in garages, warehouse storage or other similar areas where surface appearance is not of primary concern.

LEVEL 3: All joints and interior angles shall be tape-embedded in joint compound and two coats of joint compound applied over all joints, angles, fastener heads and accessories. All joint compound shall be smooth and free of tool marks and ridges. Note: It is recommended that the prepared surface be coated with a primer/sealer prior to the application of final finishes. This level of finish is typically specified in appearance areas which are to receive heavy or medium texture (spray or hand applied) finishes before final painting, or where heavy-grade wall coverings are to be applied as the final decoration.

LEVEL 4: All joints and interior angles shall be tape-embedded in joint compound and three coats of joint compound applied over all joints, angles, fastener heads and accessories. All joint compound shall be smooth and free of tool marks and ridges. Note: It is recommended that the prepared surface be coated with a primer/sealer prior to the application of final finishes. This level of finish is typically specified where light textures or wall coverings are to be applied, or economy is of concern.

LEVEL 5: All joints and interior angles shall be tape-embedded in joint compound and three separate coats of joint compound applied over all joints, angles, fastener heads and accessories. A thin skim coat of joint compound, or a material manufactured especially for this purpose, shall be applied to the surface. The surface shall be smooth and free of tool marks and ridges. Note: It is recommended that the prepared surface be coated with a primer/sealer prior to the application of final finishes. This level of finish is recommended where gloss, semi gloss, enamel or non-textured flat paints are specified or where severe side lighting conditions occur. This highest-quality finish is the most effective method to provide a uniform surface and minimize the possibility of joint photographing and of fasteners showing through the final decoration. (note: Application of primer/paint products over Level 4 and Level 5 smooth finish: Industry experience demonstrates an effective method for achieving a visually uniform surface for both the primer and topcoat is spray application immediately followed by back-rolling or roller application using good roller techniques such as finishing in one direction and using roller types and naps recommended by the paint manufacturer.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 9/8/2011

This is a common mistake among inexperienced ICF installers; the blocks go together pretty easily, but you need to keep the webs lined up. We had one of two areas on my house this way, but I painted on the wall where they were, so that the drywall installers knew where the webs were out of whack and to pay attention to the marks on the wall as far as where to screw into webs.


Financing  >  Best Bank for Loan
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/7/2005

There must be different types of construction loans out there, because what you describe is very similar to what I have. I have the checkbook. I write the checks. I send the checks. I get the lien releases. I provide copies of invoices and lien releases to the bank for their records. This is the first time I have done this, so I didn't realize there was any other way.

OTOH if you read about what other people go through on this site, (submit invoices to finance company, finance company thinks about it for awhile, finance company cuts check and sends it late, you get stuck with interest for late payment or at the very least miss on beneficial financing opportunities such as 2-15 net 30 or better), you realize that I have a pretty good deal.

I would choose a bank just like any other supplier or subcontractor. Choose one that gives you personalized service, fair price, overall the best value.


House Features  >  Downdraft ventilation
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 5/4/2007

I have a Kenmore Elite downdraft, which is actually made by Broan. I have the 30" model, installed in an island similar to what you are doing. I wanted it because we entertain, and the center of entertainment is usually the kitchen (even when we are not serving food) and I wanted to keep guests out of the kitchen, this way I can face them and keep them out of the way from the kitchen. Nothing else would have worked; a big overhead cooktop would block the view. The downdraft is flush with the countertop when not in use, it pops up about 6" or so and is ultimately rated for 500 cfm, although I doubt it actually flows this much. It looks great.

What it doesn't do is provide adequate venting. The back burners, usually no problem, you can see the steam coming from the pans and into the vent intake. The front burners, no chance, just watch the steam. Cook a big pot of pasta even on the back burners, and again watch the steam. The pot is simply too high compared to the intake, most of the steam coming off that boiling water misses the intake. Compared to "most" vents that are carbon filters and recirculating, the downdraft is an improvement. Compared to a proper vent fan, the intake is too low (heat rises) to be truly effective. However, given my kitchen, I really didn't have another alternative, and actually given the same situation and knowing now what I didn't know then, I really don't think my decision would be any different.

The other downside, it is loud. But then, 500 cfm of airflow isn't ever going to be quiet. I mean you-can't-talk-to-your-guests loud, you-can't-hear-the-stereo loud. I can't imagine how loud those 1,200 cfm upflow monsters are you see in the upper-end homes? Given a cooktop on an island, I simply don't know a better way to vent.

I have seen one remodel, where they used remote-mounted bath fans in the ceiling above the cooktop. I have one of these in my master bathroom, it is rated at 250 cfm and since the motor is remote-mounted elsewhere, it is eerily quiet. Maybe next time I use two of these overhead (switched independently); the ceiling grates are pretty unobtrusive. At least that way I have quiet, and since heat rises, also a better chance of actually venting what needs to be vented.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 5/8/2007

Even with a tight house, you should have an intake air vent that serves your ventilation, as your cooktop vent isn't your only source of exhaust. You will still have clothes dryer and bath fans, and you need to make up air for these exhausts, or you run the risk of running negative pressure (we can debate positive vs. negative pressure all day, I like positive pressure and that is what I prefer).

However, even with intake makeup air, running a big exhaust fan such as 500 cfm (what mine is) will take a house into negative pressure. The big 1,200 cfm monsters I see in some spec houses must really be terrible, but then the spec houses are so loose to start with, it probably makes no difference at all. And truly I don't think people actually use these kitchens, such a waste as they have very nice appliances that will rarely be used to their potential.

I figure if you have to open a window to run your vent fan, your HVAC tech did not do their job correctly. I was brainstorming this idea with a friend of mine, he suggested the better installation would be to install these units at the sides of the cooktop (mine is at the back), with one of the units being an intake where the fan itself would be disabled, so you would establish a cross flow across the cooktop. When done, both retract back to flush with the counter. Interesting idea...


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 5/14/2007

Let me first apologize for topic creep, but since Dave brought it up first about using the HRV to vent bathrooms ;-). Check with your code official first; this would not be allowed in my jurisdiction.


Construction Bargain Strategies  >  Rock Bottom Prices for Doorknobs
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 11/29/2006

Would you please write a review in the "Reviews" section of the forum. This section is not yet reaching critical mass, but it would be nice to have one section so that future surfers can get great information like this easily and in one location.

Thank you.


Construction Bargain Strategies  >  A Good Turn of Events....??
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/7/2005

If you are going to undertake the O-B process, and have never done this before, your network of contacts is crucial. That you found one so close is even better, as their experience with suppliers, subcontractors, etc. is definitely relevant to you.

Good luck with your project.


Construction Bargain Strategies  >  Lumber/Plumbing/Electrical/Drywall/Shingles..etc.
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/29/2005

One thing I see people throw out a lot, but without a lot of thought, is to get XX bids for every aspect of the job. I agree that you need to get bids, and that they are extremely important, but I think it goes beyond an absolute number.

For material, it is not a very big deal as you simply come up with your own quantity takeoffs and get as many bids as you want to fax this list too. I have seen Gayla call 5-10 suppliers in an hour to see if they are interested and then fax out the list to all of them, most returning bids within hours.

Now for labor, instead of simply getting XX bids (I have seen "rules of thumb" that say anywhere from 3 to 5 to more), I would encourage you to get different types of bids. Let's use HVAC for example. I could open up the yellow pages in my locale and find pages of full-page ads. I am sure any of these large contractors would be happy to give me a bid, and if I received 10 different bids from large contractors how valuable would it be? More valuable would be to receive bids from large contractors, medium sized contractors, small contractors, start-ups, contractors in the fringe suburban areas vs. contractors in the city, etc.

While I don't advocate a fixed number of bids, I would encourage people to get diversity in their bids based on these factors. Sometimes the larger contractors are cheaper (sheetrock and insulation), sometimes the smaller contractors are cheaper (HVAC and plumbing), sometimes the in-the-city contractors are cheaper, sometimes lower overhead (fringe suburban areas) is cheaper.

Fax a material bids list out to 5-10 suppliers.


Building Phase  >  Faux Brick Panels
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/22/2008

Have you seen the Nichiha Fiber Cement Panels? I couldn't get them locally (I could, but I had to order whole pallets), but from the samples I saw they looked pretty good. The key with making faux brick look good is how you detail the corners. Also faux brick tends to be "too perfect" and just doesn't look right to the eye.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 5/6/2008

I believe Nichiha has the details already worked out. I don't have any of their information any longer. IIRC in the literature I had, the example was detailing how to use faux brick on a fireplace and it showed the best way to detail corners.

I imagine if I had a couple of panels it wouldn't be that difficult to figure out how to make those corners look good. Now if you want quoins to dress up the corners (originally structural elements, but brick is now veneer and not structural so entirely aesthetic now), I have no idea how you might go about this.

I was never that interested in the brick. The limestone though, I really liked that (and they have corner pieces for that material).


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 9/24/2009

As I recall here with ICF, its not just ring-shank nails but ring-shank nails fired out of a pneumatic nailer (gun). The heat from firing them causes the plastic to melt, and this is what secures the nail into the plastic web. The key here is to get the air pressure right, and this might take some trial and error. As to Polysteel with the steel webs, you are on your own if that is your ICF.

Anyone who doesn't think that nails will hold in plastic webs, I encourage you to take a few shots with the nailer. Just try to remove that nail, any method you like. That nail isn't coming out without breaking the web and bringing a chunk of web with it.

I used stainless steel screws, but this is a bit slower than a nailer (also a bit more forgiving for the inexperienced installer, which would be me).


Construction Bargain Strategies  >  Sending out Plans/Blueprints
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/7/2005

My architect gave us permission to make as many copies as we wished, even gave us his account at the blueprint shop so we could make them cheap. However he also required the blueprint shop to charge us and not allow us to bill them to his account ;-).

Anyway, having a bunch of plans to hand out is preferable to calling and trying to get your plans back. Some trades only got minis (11x17), some got full size. There was one day I handed out over 30 sets of plans, I bet out of those I only got a handful back. No problems, a full size set from the blueprint shop was only a couple of dollars.

One thing we did have problems with all of these plans was keeping track of changes. For example, we made some changes to the window order, and made some changes to the ICF subcontractor's plans to reflect this. However the ICF subcontractor ended up with a different set of plans without the changes. For some reason, I picked up a new set from the house too. When the window came in, it was 1' too large for the concrete opening - enter the gas-powered chop saw.


Construction Bargain Strategies  >  Is it possible to build for $25 per SF ?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/17/2010

Overordering supplies - I tend to think this is a universal GC and subcontractor issue. No one wants to stop a job and go get a part that they didn't get from the local supplier, so overordering is cheap insurance. Extra parts stay on the truck. Maybe you get some of those extra parts, maybe you contribute to those extra parts, hopefully it balances out. However I noticed the same thing when I purchased materials based on subcontractor takeoffs; there was always more than enough material to finish the job and return for refunds. My own takeoffs were much more lean and rarely resulted in enough material to justify a return.

I tend to think that people who don't O-B but claim they are getting a better deal because they pay their GC time and materials (cost plus fixed fee contract) fall into this trap. The GC submits invoices for materials purchased, the owner pays. I suspect the GC never submits invoices for material returned for a refund ;-). My suspicion is this is pure invisible profit for the GC operating on this cost-plus arrangement, and the owner is completely clueless as to this source of profit for the GC (of course also buying into the false assumption that GC's gets better prices than O-B's). Further I suspect that the invoices submitted by the GC don't truly reflect the GC's prices for material, as when I established GC accounts at suppliers I also qualified for refunds based on amount purchased (I send a client in to purchase finish materials; they get fair price, as the GC I get a refund [profit] that never shows up on the invoice. Granted, I was really only an O-B, but established myself as a GC to establish credibility when dealing with suppliers and subcontractors).


Planning Phase  >  Concrete V. Framed Walkout
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 5/11/2006

The simple answer is to have your concrete foundation contractor bid it both ways, and have your framer bid it both ways.  The rest of the finish (insulation) is something that comes later so call an insulation company to get a typical price on insulation and vapor barrier costs.

It has been awhile, but I found a poured concrete wall was cheaper than a framed wall, hence I built my entire house out of ICF.  Looking at some of the ICF bids locally of recent, this is no longer the situation.


Construction Bargain Strategies  >  Deck Cabling
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/12/2010

There is a 'blog out there titled "Modern in Minnesota" whereby Splatgirl chronicles her O-B project (not one of the contributors over here, unfortunately). If you punch the title into Google, it will be on the front page. She did a DIY cabling system, and has documented somewhere on that site the tools you need to swage, tension, suppliers, etc.

I was looking at cable systems, and the one thing I found was expen$ive. Like you, I thought there must be a better way; aircraft cabling, nautical cables, something. However I simply didn't have time. Splatgirl's build was after mine, and when I read that portion of her 'blog I would have definitely gone down the path she did if I had the information two years earlier. Here is the direct link to Splatgirl's Archive on Wire Rope


Florida  >  Footer size Florida Home
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/1/2004

How where your footers designed? Were they based on a soil test? Were they based on common soil conditions for the area you are building in? Did you buy plans over the Internet and the footer plans were part of what was included? I would design footers based on a soil test, although these are very rarely done for residential construction. For my drawings, my architect simply designed them based on typical soil conditions in the area I am building. I wouldn't take any advice from someone on proper footing sizes without more information to your site specific conditions.


Planning Phase  >  Small Home Construction
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 11/12/2009

Normally, I would suggest that smaller houses actually cost more per square foot than larger houses. However, Katrina Cottages are designed for cost effectiveness (the idea being that affordable housing is a critical need after the hurricane) and modular (fast to build), so these should actually be closer to production houses than custom houses. There are several vendors, you can even get prepackaged kits from Lowe's, and this can't hurt price points any whatsoever. Having all of your materials in one package (OK, most of your materials), certainly adds more than a bit of simplicity to the O-B. Now if a builder has never put one together, then their labor cost will reflect this. However for a DIY, this is a non-issue.

Good luck on the small house. There is a lot to be said for these smaller footprints; less maintenance, less utilities, etc.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 11/14/2009

It looks like you are looking for the KC-544 model, two bedrooms, one bath, 544 s.f. A quick search on the Internet shows the package price just under $30K inclusive from Lowe's, however, your local Lowe's may be higher or lower. In a rough rule-of-thumb, it costs ~50% for materials and ~50% for labor, and this puts you at $60K +/- for this Katrina Cottage. It is my understanding though, that these were intended to be used to replace the FEMA trailers, and to provide more interim housing (such that they could be expanded or blown-out later), and I thought the overall costs were actually lower than that? Anyway that puts you at $110/s.f., if that helps, which seems high to me for what these are trying to accomplish.


Finding Subcontractors  >  Trying to locate subs
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/27/2005

The fact is as O-B I needed to look to a different class of subcontractors. The big subs are big because they have the work. They didn't get big first. They also have repeat business from large production builders that keeps them very busy.

What you need to look for are new subcontractors. I don't mean inexperienced, but newly out on their own. For example, my ICF subcontractor was from a small town west of here, but looking to get into my locale. It is very difficult to find someone to hire you without local references. I took the chance, drove all over western Kansas looking at examples of his work, and became his first big city client. He has used my house as a demonstration house for his work. This is win-win for both of us.

As another example, my HVAC technician used to work for a large local firm. He is going out on his own, but couldn't use his previous employer's clients as references. I became one of his first clients. Well-experienced, top notch work, but from an "unknown" as far as subcontractors goes - not an unknown as to experience though. My plumber was the same way.

For some subcontractors, it pays to stick with the big shops though (sheetrock is an example).


Green Building  >  SIP's Are Expensive!
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/11/2008

How about you share a floorplan so we are all looking at the same picture?

When people want to construct "outside the box" of stick framing, I always recommend that they consider the building amterial they wish to construct out of in their design process and start from a blank sheet. Sometimes adapting a house plan from stick framing to these alternate (ICF, SIP, Red-Iron) works very well, but more often than not is doesn't.

Do you have a hip roof - that will increase your SIP costs. Do you have dormers in your roof, - also an increase. Back to the basics, if you want a SIP roof you need to keep it simple. Without your floorplan and elevations, we have no idea what your roof might look like. We also have no idea how many SIPs you need.

Just as an example, I could build a 1,600 s.f. structure consisting of a 40x40 box, this would only take 160 linear feet of SIP panels. I could also build that 1,600 s.f. consisting of 1,600x1 box, this would take 3,202 linear feet of SIP panels and therefore cost about 20x as much for materials. But hey, its the same square footage - right? You can't compare prices based on square footage of floor space, this isn't how your framer is going to bid the job, not how your ICF contractor will bid the job, and not how your SIP supplier will bid the job? Please share some more information...


Construction Bargain Strategies  >  Loewen Windows and Quality Cabinets
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/2/2005

Loewen windows are very nice. The problem I have found with them is getting competitive bids. Using Andersen windows for example, I have many distributors covering my metropolitan area, and I can ask any one of them for a bid (in fact I probably received five or six Andersen Window bids). This is built-in competition, and if they know I am shopping the competition who will provide the exact same product, I can compare apples to apples, so the pencils get a little sharper. I like sharp pencils.

Loewens are distributed through regional areas, with no competition. If you choose Loewen windows, you have one supplier to pick from. No competition, the product line stays a little more exclusive, and a little more expensive. Great quality, but pricey for what you get.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/21/2008

Supply and demand. I know I have recommended Milgard Ultimate windows to many O-Bs, for me they were a cost savings over Andersen 400 series. However when I ordered mine, the price had gone up 20% and the plant was operating at 100% capacity -- still a good price but my lead time went to ten weeks (from two to four weeks when I received my original "planning" bid). According to other local O-Bs using the same source, prices are way up over my bids, to the point they are no longer cost-effective.


Construction Bargain Strategies  >  Cheap Tile web sites
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/2/2005

The ceramic-tile-floor.com is builddirect.com. The prices are extremely cheap. However, notice that they are FOB Italy. Once you pay to ship a container from Italy, the price goes up considerably.

We found a great porcelain tile we wanted at a local tile shop for $5-6/s.f. It happened to be a line that builddirect.com carried (at $0.80/s.f.), so we thought champion! we would simply buy a whole pallet of it, use what we wanted, and simply sell the surplus for some rock bottom price and probably recover our whole investment. Until we factored shipping into it.

If you are shipping from Italy, you better be ordered container quantities and not pallet quantities.

The biggest problems I have found with buying tile over the internet is shipping costs. The best deals on tile come from closeouts when you agree to take all the remaining tile. However if you need a significant quantity, you will never get a closeout with enough volume.


Miscellaneous  >  What is luxury?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/12/2010

I am going to disagree a bit here. Luxury is a combination of quantity and quality, but only to a point. More isn't better beyond the point you can use it. I only use two bedrooms; having six wouldn't be a luxury.

I'm going to suggest that luxury is a house that works seamlessly or transparently, and without fuss. You turn on hot water; you get hot water for as much or as long as you desire without worry of it going cold. Whether you do this by fire-on-demand or sufficient storage is your choice, but as long as it works and disappears. Same thing for HVAC; comfortable conditions (temperature, humidity, no drafts), programmable thermostat, and maintenance free.

What do you do in your house, how do you live in your house? Make your house fit you through good design. Kitchen, hobbies, entertaining, solitary time, pets; whatever it is, design for it. When your house disappears, you have reached what I desire as luxury. And when I said "disappear" I don't mean Philip Johnson's Glass House.


Miscellaneous  >  Generator vs. Temporary Electric
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/1/2005

I am with John on this one. Generators are backup power only. We used generators until the electric utility set the temp pole (in my locale, the electric utility provides the temp pole, not the electrician). This started as "provide 2 days notice", which I did. Ten weeks later I got a temp pole. That is a lot of gasoline, a lot of noise, and a lot of wear on temporary power.


Construction Bargain Strategies  >  Land !?!?! need help.
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/1/2005

Around here some of the localities have their plats on GIS available through the Internet. For Kansas City, MO, I can find the owner and residence address for any parcel of land in the city - and I can do this all online.

You can do the same in the county where I am building too, including how much money I have qualified for on my construction loan. It is scary how much information is available on the Internet if you know where to look. I have used it to see what houses in my neighborhood loan at. While I can't get sales prices, I can get all lien information about property. You can also check for mechanic's liens against subcontractors too. 

Easy, Fast, Scary!!!


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/14/2005

Jon,

Good to see you are making progress. There is reciprocity between MO and KS, so if the MO engineer needs to get a KS license it isn't too difficult. In Johnson County I am surprised you need a structural engineer stamp at all.

As to lots, any new subdivision will be limited to a specified list of approved contractors. Unfortunately an O-B is not on the list of approved contractors. And then if you want ICF (I don't know what your final plans are, but you have expressed interest in ICF on the forums), you are stuck even more if no one on this list has any experience with ICF.

The only lots we found where there were no approved contractors included infill lots where the development is almost closed and the developer is looking to unload the last couple of parcels; older developments (tear down and rebuild), and a more rural setting. We found some developments where you can bring your own builder, but the plans must be approved by the developer - in fact we are building in such a development.

Perhaps your Realtor can help you find developments without builder restrictions. Be very careful here, as most Realtors are not looking for commission on land but on build jobs. The Realtor will not do very much work if they are only getting a land commission. And you certainly don't want to pay them a commission on the entire build job!


Financing  >  Spray-in-place Polyurethane Insulation
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/23/2005

Are you referring to a product such as Icynene? If so, if you put this in the search terms you will find several recent threads.

If I were trying to hold noise to a minimum, I would seriously look at ICF construction. Compared to stick-built, even with spray-foam insulation, the ICF is considerably quieter. My ICF subcontractor built his personal house this way, mostly ICF with one wing of it traditional construction. There is no visible differentiation between the wings from interior or exterior, but when you walk from one area to the next it is very noticeable. He used an Icynene competitor in the walls and ceilings, but very similar material. 

But then I am biased, I did use ICF. Looking back, it was one of the best decisions I have made. I might look more seriously at SIP too.


Green Building  >  Thermal Mass Example
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/23/2006

John,

 

Great data. Kind of makes me wish I would have instrumented my house. How much HVAC intervention and at what times are you getting it? You temp-in stays +/-2 F even as your delta between temp-in and temp-out ranges from almost nothing to >40, yet this doesn’t seem to be a factor for temp-in. It would appear that you get some HVAC intervention at between 21:00 and 22:00 as the temp-in slope levels and perhaps even starts to trend upward and you certainly aren’t getting any solar effects at this time.

 

I don’t get as much temp-out swings as you do over the course of a day, but I find that without HVAC intervention my temp-in (using your data definitions) range is ~+/-4 F (whereas yours is +/-2 F). At night my delta between temp-in and temp-out is routinely >40, similar to what you are showing. I also find that wind is not a significant factor.

 

I use a forced air HVAC, which is different than your hydronic, but I also find that it primarily operates in the morning as we prefer to sleep in a cooler environment and would like to lose more heat (we keep the shades drawn in the bedroom to minimize daytime solar gain). I never thought I would say that I am disappointed because I would really like to lose more heat at night when my HVAC isn’t even operating. On cloudy days, we get occasional HVAC intervention after the sun goes down in the evening, but this is infrequent. The other day, my HVAC actually came on during the day (!!!), but my delta between temp-in and temp-out was >60 and it was cloudy, which is an extreme in my environment for daytime temperatures.

 

Some additional data points. My floorplan and orientation is on my website, light-colored roof (Tamko OE Pewter), R-50 dense packed cellulose attic insulation with a well-vented attic, low-E windows for maximum solar gain with cellular shades at night, 6” concrete core ICF with #4 steel ~16 o.c horizontal and ~24” o.c. vertical on the main level and 8” concrete core with more vertical steel on the lower level, 2-1/2” foam on interior and exterior (Amvic ICF). In my environment, most low-E windows are for minimum solar gain (heavier cooling environment), but I wanted maximum solar gain because they are shaded from high angles during the summer.

 

Just to add a data point from my old house, we had an ice storm and lost electrical power so no HVAC for four days. During the sunny days, it would get to 70 F inside from solar gain, but once that sun went down it would get !@#$%^ cold quickly. We were in bed by 8:00, down comforter and two fairly large dogs in the bed just to keep warm. This is typical stick-framed, R-13 walls, R-30 roof, no thermal mass, and the temp-in range over the course of one day is probably +/->20 F without HVAC intervention. This is the same environment I am in now, so it offers a valid comparison to my new house.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/12/2006

I would think that part of the reason has to do with the steel in the concrete. My ICF wall uses a 6" core of concrete, plenty to surround the steel needed for large headers (I have some 9' openings) in an ICI package. One of the challenges with a 4" core ICF is getting enough steel in your headers, and getting the concrete to flow around this steel, so for a CIC package you would need at least 4" concrete on each side of the insulation, which is 50% more concrete (not exactly cheap at today's prices).

Then you have concrete interior and exterior, exactly what finishes are you going to use, and how are you going to attach them? What about utilities? You can channel the interior foam for plumbing and electrical (while it is always a good idea to avoid exterior walls with plumbing, you need electrical outlets on all walls). You can screw your sheetrock directly to the ICF, although if you are doing a CIC package and interested in thermal mass perhaps you don't want to cover your interior concrete with sheetrock? Depending on your choice of exterior finish, a solid concrete mass may not be desirable either.

And then there is the finish work. For these concrete walls you would want smooth finish (trowel finish), for ICF walls where you never strip your forms, you pump and vibrate, a much quicker solution.

And finally, the CIC package would appeal to only the fringe. The ICI package using ICF can appeal to the mainstream buyer. If I am in a business selling product, I prefer to cater to the larger market as this poses less risk for me.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 9/6/2006

I was at a Storm-Resistant Concrete Homes and Buildings Workshop last week, just trying to stay current on concrete technology for residential construction. It has been two years since I poured my ICF house, and a lot has changed.

 

As to the interior thermal mass systems, Integraspec ICF block has an exposed concrete face option – integraspec.com/noncombustible. I am not familiar with this block, but it is basically a site-assembled block, so for this option you would use only one face of the block and the spacer, and use plywood for the other side of the forms that will be stripped. This would give you insulation on the outside, with thermal mass on the inside. I suppose you could put the concrete on the outside, and the insulation on the inside, but why? I know ECO-Block is also site-assembled, and you could probably use any other site-assembled block to accommodate the same results.

 

Locally to me, there is a company using the CertainTeed ThermaEZE system with their aluminum forms. Basically they are a basement forming contractor that has recently gotten into the business of above-grade walls, thereby allowing them more use of their aluminum forms (if you have priced these units, aluminum forming systems are not exactly cheap, so more uses is a good thing to justify investment). These use a web structure with Expanded Polystyrene (EPS) panels that can be located just about anywhere within the traditional forming system. So you can put your insulation at any point within the wall. For a thermal mass system you would want your exposed thermal mass on the inside. The downside here is that the web system doesn’t have nearly as many attachment points as an ICF, limiting your exterior finish options (most ICF have attachment points at 6-8” o.c.). But if you want an EIFS system, this is probably a potential option.

 

And then there is Thermomass (thermomass.com), that uses Dow Polystyrene insulation sandwiched between two concrete panels. This system is intended to be used in conjunction with traditional forms as well. I asked them about steel placement, and how they can accommodate strength in longer lintels (openings) with two seemingly separate concrete walls. They use a fiber composite connector through the insulating panel that holds the two concrete panels in place and supposedly ties them together structurally. This seems a bit spongy to me, especially if you have any seismic codes that might apply where you are building. These are different than the steel ties normally used, and should not result in a thermal bridge. The nice thing about using a system in conjunction with aluminum forms is that you can drop a big vibrator in there and really get good consolidation (with ICF you are pretty much limited to a ¾” vibrator unless you really want trouble).

 

Both of these systems recommend using a skim coat of plaster to finish the inside concrete walls. I didn’t ask for plaster company references, but I know in this market they are limited (this is a different trade than sheetrocking) and much higher installed price. (But then I was looking at blue board, a step that would be eliminated using a concrete substrate). It seem like if you can finish sheetrock, you should be able to finish plaster, but finding a plasterer is a challenge. As to running your electrical utilities on interior concrete walls, I’ll leave that for you to figure out. And hanging anything, well there is always the hammer drill and Tapcon solution.

 

Imagine my surprise when I picked up the local Amvic Block distributor brochure and recognized my house in two different pictures ;-).


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 9/6/2006

No textured interior walls around here. Sheetrock is finished smooth, my 'rockers' used a Level 5 finish, which is fully skim-coated with sheetrock compound and very smooth. The plasterers use hand-applied skim coat over blue board, no sanding, and this stuff is as smooth as paper. Even the traditional stucco (which is textured) is trowel applied. Drywall ceilings are textured with the hopper though; they say it is hard to hide joints in the ceilings.

Given that the rockers could skim-coat a drywall wall, it strikes me as odd that it is a completely different trade to skim coat a blue board wall. It sure looks like the same process to me? Plaster is much more expensive, and much more limited tradespeople locally.

The concrete guys said the finished concrete walls are very smooth (they can even cast in crown molding, painted of course, and not stained). But anytime you pull forms you will have some imperfections and bug holes, especially if your forms are not well-seasoned. This is why they recommended a skim-coat plaster finish directly to the concrete. Again I didn't ask for references, I was only trying to stay current and am not actively pursuing any construction projects in the near future - I'm too busy enjoying the one house I built to dive into this project again anytime soon.


Planning Phase  >  ICF, SIP's, stick built?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 6/1/2006

Welcome to the forum, you should find almost anything you need here, and if not a new post will generate relevant answers and options.

 

When I was designing my house, I also looked at SIP, ICF, traditional framing, light-gauge steel, and heavy gauge steel as options. Traditional framing and light-gauge steel are the most versatile framing options, and it is relatively easy to adapt a house plan with traditional framing to ICF or SIP. However it is much easier to adapt a house for ICF or SIP to traditional framing, so if I were doing design with an eye toward using ICF or SIP I would design to the most limiting system first, ICF (there are certain rules using ICF that you don’t want to violate in the design process, otherwise your project becomes much more complex) or SIP (roof designs are critical if wanting to use a SIP roof). This gives you the option of using traditional framing later much easier than adapting to ICF later. Did this make sense, as I re-read it perhaps it is not terribly clear. For reference, I ended up with ICF construction. I found it more cost effective than traditional framing. Heavy-gauge steel was my preferred option until steel prices skyrocketed, and while I investigated SIPs I simply didn’t know of any houses locally that used them.

 

If you do go with ICF or SIP, you would typically use traditional construction for floors and interior walls. With ICF, the floor system connects to the ICF through connectors cast into the concrete before it is poured. Simpson Strong-Tie makes a connector to use either a wood framed floor or a steel framed floor (ICF-LW series for the wood-framed floor). USP Connectors also makes a IFH series connector, although for some odd reason it doesn’t show up in their catalog or on their internet page but call your supplier and they should be able to get them. I used the USP IFH series connector for my ICF construction. The only time I would consider an interior wall of ICF would be if I were going to build a home theater; it would be very quiet with ICF interior walls.

 

There are no problems doing brick or stone with ICF, it is not unusual. Most ICF block manufacturers have a brick ledge block that you put in where you want to start the masonry to give it the necessary support. This way the bottom course of the brick rests on a concrete ledge.

 

The problem with the future is you don’t know what it brings, so you need to think about options for integrating it later. As to running wiring in the walls, if you have access from the top or bottom it is not insurmountable. However for a three story total wall height, this is clearly not the case if you finish the basement. The unfinished basement gives you access to the main level, the attic gives you access to the second level; so maybe this isn’t such a big deal.


I have always been a fan of planning for the future, so even in traditional framing I recommend installing a couple of lengths of pretty good sized conduit (2-1/2” or so) from the vicinity of the electrical panel to the attic (in my area the electrical panel is usually in the basement) so that you can get future wiring into the attic, giving you at least a fighting chance for upgrades to the electrical service. There is no reason you couldn’t do this in other locations to simply to provide options. It's not like conduit is that expensive (no different that installing conduit under your driveway for future landscape lighting, etc.).


When you build your own house, you have much more option of burying upgradeability than buying something already done. You could also run conduit from some electrical boxes to a more accessible place if you think you will upgrade wiring to specific areas later. You always have your interior walls you can install wiring in to, and these are simply 2x4s with lots of void space.


Planning Phase  >  Kitchen plans????
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/11/2006

We had the same experience at Home Depot. The KD is nothing more than a cabinet salesperson. We spent about four hours with her, got the estimate, and took it to the bank as we were only interested in securing the loan and getting the catalog and price lists.

With a catalog of different ideas and a couple of books courtesy of the library, we designed our own kitchen and took the ideas to a custom cabinet shop.  Meryl (cabinetmaker) took our ideas, suggested some of his own based on what he is making and installing in some high-end houses, and we ended up with a great kitchen that is far superior to what we would have gotten from the so-called KD. You really need to think in terms of how you want your kitchen to flow, how many cooks, your cooking style, how you break down tasks, etc. I would have been willing to pay someone for this service as there are so many things to consider (e.g. did you know right-handed people prefer the dishwasher to the left of the sink, and left handed people prefer the dishwasher to the right of the sink - I didn't?), but all of the KDs around here are interested in nothing more than selling cabinets. 

If you design your own kitchen, I would seriously question the current design philosophy about the design triangle and focus instead on how you use a kitchen. You will notice that most high-performance commercial kitchens are not designed around a triangle. We disregarded the triangle concept and focused more on workstations, what we intended to accomplish with each workstation, and made sure we had the cabinets and adequate countertop to support this concept.


Construction Bargain Strategies  >  Stick Frame: 2x4 or 2x6 walls?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/27/2005

I hate to throw too much uncertainty your way, but why stick build at all? There are too many cost effective choices out there such as ICF and SIP. I found ICF very cost competitive with 2x4 sticks (actually a cost savings, but then my lumber bid came in at the height of the lumber prices this past spring). I found 2x6 almost 30% more for the frame. Given that ICF saved me money over 2x4, it was a huge savings over 2x6. Even with recent steel and cement price increases, compared to lumber price decreases, it is still very cost competitive with 2x6 framing. In Canada the extra insulation will pay you back in the short term.


Green Building  >  Rainwater Flush
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 12/7/2009

I might suggest looking at this in two approaches; rainwater harvesting and greywater. One is easy to accomplish; greywater poses challenges. Rainwater harvesting benefits not just your landscape, but it reduces peak flows from stormwater runoff and extends the time to peak, both critical issues. Sure these are limited to one lot at a time, but enough single uses can be somewhat significant. For greywater about the only thing I would do differently today might be a split collection system in my house, tied together as it exits the house. This is minimal cost today that allows for greywater reuse at some future date when it becomes viable.

For rainwater harvesting, look at "rain gardens" that are essentially mini-wetlands and/or depression storage. I am using native wetland fringe vegetation that once established will have root systems 12-18' (yes that's feet, not inches) deep, and this is a lot of soil porosity that absorbs this water instead of stormwater runoff (not to mention erosion benefits). A bit of grading dictates where you might wish to establish your depression storage areas/rain gardens/mini-wetlands within your landscape. Reducing stormwater runoff has multiple benefits and is easy and cheap to accomplish at these micro levels.


House Features  >  Stone-like siding
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 10/19/2004

I'll second the nichiha site. This company is Nichiha. They manufacture fiber cement siding, some of which looks like cultured stone. I really like their sandstone. As a side note, when I called them and explained I was a contractor (I applied for a GC license to support my O-B project), they FedExed me a contractor pack with samples of all of their products. I didn't realize that they would do this, but this box had to weigh close to 100 lbs. I can't imagine what it would cost to FedEx 100 lbs.

The downside to this is it isn't used in the Midwest. For me, the closest sites are Oklahoma City and Colorado, and I would really like to see the product installed before I made a decision. I worked with the closest distributor (Kansas) to try to get my house to be a demonstration house for their product, at a substantial discount. They were willing to do this, but unfortunately for me I really didn't like the distributor and didn't feel I wanted to do business with him at any cost... The product is wonderful, though. The other downside is that much of it is not stocked, so if you want this material you have to order pallet quantities, and this is beyond simple accents.

Also be careful at the corners as the Nichiha are panels, and the corners could show a seam in the rock. Nothing says fake rock and cheesy more that stone that doesn't look right at the corners. There are ways to address this, and some of the patterns have corner panels, just something to think about.


Construction Bargain Strategies  >  Engineered floor trusses??
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/27/2005

I have them. This is one feature I wouldn't change. The cost to upgrade from dimensional lumber was fairly small. They actually posed a cost savings from TJI.

They are nice because the truss fabricators get much nicer lumber than I could. Straight, true, dropped in place like a champ. And you can't beat the spans. I tend to not disagree with the engineering either.

I have heard about the fire issue before. They are much less substantial than equivalent dimensional lumber. But you need to weigh the benefits with the downsides. For me, I chose open-web floor trusses.


House Features  >  Fiberglass Windows
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/4/2004

Does anyone have direct experience with fiberglass windows? I am considering them, but don't have any direct experience. I can get Comfort Line (comfortlineinc.com) and Milgard locally. However, there are many other manufacturers that looks great, such as Owens Corning, Marvin Infinity, Fibertek, Fiber Tru, Duxton, Accurate Dorwin, Sovereign, Omni Glass, and others. Fiberglass appears to offer many advantages, but they just simply aren't used in this region, which will make price shopping more difficult. Also, I hate to order windows without seeing what I am getting first.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 12/8/2004

We just installed windows yesterday.

I wanted fiberglass windows to ensure no future maintenance. Vinyl clad and aluminum clad wood windows are only as good as the cladding, and if there is a seam in the cladding there is a failure point. I don't know how many (more than I care to count) aluminum clad wood windows I have seen from respected manufacturers where the seam failed, water intrusion, and eventually wood rot and window replacement. Wood without cladding was not an option simply because these are a maintenance headache, and when it comes to house maintenance I am not the most diligent about getting things done. I didn't want vinyl, simply because I don't like the look of the big clunky frames. I didn't want an aluminum or steel window simply from an energy efficiency perspective. This left fiberglass.

Lines I actually viewed were Comfort Line and Accurate Dorwin (I held, touched, operated, etc. each of these). The Comfort Lines were nice, but the frames were somewhat clunky for lack of a better way to describe them, and they were very pricey. My comparison for windows were Andersen 400 series, low-E, argon filled (yes these are clad wood but still my bogey window; I wanted nicer at less cost) - the Comfort Lines were about double the Andersen 400 price and therefore outside my budget. The Accurate Dorwins were very nice and significantly cheaper - these were only about 50% more than the Andersen 400 price but still outside my budget unfortunately and with the weakness in the American dollar the price on these is increasing. These are the only two lines of fiberglass windows in the area that I could feel, touch, look at, etc.

I ended up ordering Milgard Ultimates almost purely on faith. There are several local Milgard dealers, but they deal in the vinyl lines and didn't have experience with the fiberglass lines. However they do have a nice vinyl line that is well constructed, and the fiberglass are Milgard's top-of-the-line offering, so I figured it was worth the risk. One interesting note is that although these are top-of-the-line, they are not available with argon fill (the value of which is debatable anyway). That they were cheaper than the Andersen 400 windows also helped.

These were installed yesterday, and I must say I am happy with my decision. I used casements and fixed over awnings, so I cannot comment on single or double-hung quality, but overall I was favorably impressed. My installer was also quite impressed, as he had never seen fiberglass windows. The casement operators are very smooth, I found much smoother than the Andersen 400s of the same size  and I am using large casements (5-6 tall). I havent had a chance to operate the awnings yet, but I am anticipating these as well. The downside is that my original 3-5 week lead time turned in to 4-7 weeks and eventually took 10 weeks to get my windows. The only Milgard factory making them is in Colorado, and apparently fiberglass windows have been discovered (also reflected in the recent 30% price increase, although still cheaper than the Andersen 400).

Around here the mainstream construction windows are Pella ProLine and Andersen 200 even at 2-3 times my price range for total house cost. My bid prices for the Milgard Ultimates ranged from under my lowest Andersen 400 price with low-E and argon fill (courtesy of Home Despot) to over double this price, so shop around.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 12/9/2004

Actually I cannot provide individual window prices for Milgard. For all of my window bids, I provided Andersen 400 part numbers figuring all manufacturers can look up equivalents to their competition. All of my window bids came in detailed by window EXCEPT the Milgard bid which came in lump sum for all windows (and with slightly larger sizes). Since it was slightly lower than the Andersen 400 detailed bid from Home Depot, I can only assume that the prices for each individual unit are about the same price as the equivalent Andersen 400 from Home Depot.

Sorry I can't provide more specifics.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 12/10/2004

$62K for 58 windows, those must be fairly large units or with some of the custom options.

A couple of things on Milgards you need to be aware of:

1) Custom sizing doesn't bother them, they don't stock them so they don't make the windows until they are ordered.

2) Be careful and flexible when looking at optional hardware. For example we wanted brushed nickel hardware (locks and latches), and these added $168/window! over the standard painted hardware!!! We then ordered clay hardware, received white hardware, but will have the correct hardware FedExed to us. This gives me a complete set of extra hardware to take to either the plating shop for a brushed chrome finish or the powder coater for a painted finish. Either will be significantly cheaper than the custom hardware from Milgard. You think this is expensive upgrade, you really don't want to think about the upcharge for brass.

3) You can get them in custom colors too. Once again while intriguing, I would forego this option as the price is prohibitive. If you want the fiberglass a different color, I would recommend painting them instead.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 12/13/2004

I really hate to do this because my windows are very variable in size and my options may be different than you select. This is of limited value. Since you asked though. 

I have 2640 casements in the basement, 2650 casements in the upper floor bedrooms and garage, 4060 fixed over awnings in the great room, 6050 triple casement in the dining room, 4050 double casement in the kitchen, and 1630 transoms in a couple of locations. I used no grids, standard hardware (clay or white are both standard), low-E, no argon fill. My average price/window was under $400, including tax and delivery. Now if I could have gotten additional 4060 windows for $400 each, I would jump on this deal. OTOH if I thought they were charging $400 for 1630 fixed transoms I would run quickly to another manufacturer.

I think perhaps a better comparison would be to go to Home Depot and look at the Andersen 400 windows with the same options. The Andersens were slightly more expensive (Andersens about +10%), but since they came in so close perhaps it is reasonable to assume that each component window in the bid is also very close?


Planning Phase  >  Plumbing: recirculation vs. manifold
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/4/2008

I have both, two manifolds at opposite ends of the house and a recirculating loop feeding both of them. With the manifolds I used (Vanguard Manabloc), you cannot feed a recirculating loop through the manifold, but each manifold can feed from a recirculating loop. Did that make sense? Anyway they show in their literature how to connect the manifolds to a recirculating loop, and that is what I did.

Here it is, cut and paste from their Manabloc Installation Instructions (courtesy of their Internet Site). Lets see how well this formats? OK the figure doesn't want to show up, but here is the text anyway...

Continuously Recirculating Hot Water Plumbing Loops

Vanex PEX and the MANABLOC can be used in continuously recirculating domestic hot water plumbing loops, provided:

1. The plumbing loops shall operate with water temperatures of 140°F or lower, as required by most model plumbing codes.

2. The recirculating loop is for supplying hot water more quickly to the MANABLOC, not to circulate through it or the distribution lines. DO NOT include the MANABLOC within a continuously recirculating loop.

3. The tubing is marked as rated for "continuous recirculation" as evidenced by the NSF Protocol P171 third party certification marking

(CL-R).

NOTE: The distribution lines and the MANABLOC are not to be part of the circulating system. The loop is to provide hot water more quickly to the MANABLOC only.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 7/6/2008

Vanguard PEX uses crimp connectors.  After almost three years, I have had zero problems with a crimp connector failing. Please note that when we installed the PEX, I had one fail. After further evaluation, it wasn't the crimp connector that failed, but the tubing itself at that location wasn't perfectly smooth and didn't allow the crimp connector to adequately seal - this wouldn't have been a problem with the insert connectors. Cut the offending piece of tubing (always leave yourself some slack), and a new crimp connector worked just fine.

There are two morals to this story; crimp connectors work, and always pressure test your system. I don't doubt the Wirsbo system is superior, I am just not sure it is necessary.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 10/9/2008

One manifold is adjacent to the HWH, the other manifold is at the other end of the house and is fed with a recirculating loop. The recirculating pump is demand only, operated from a switch at the kitchen sink. Without the recirculation pump, it would take too long to flush the hot water line between the HWH and the manifold.

This is not ideal, but is the only solution I could figure if you are going to have fixtures significant distance from the HWH. This also wasn't my original plan, but the 36-port PEX manifold I was originally going to purchase was special order only from my supplier, the 18-port and 24-port were in-stock items.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 5/25/2010

The Vanguard installation material indicated that the recirculating line shouldn't run through the manifold (the above message from me with this information was cut-and-pasted directly from their literature). I would have done it that way (using top and bottom of the manifold for my recirculation), except for the manufacturer's recommendation. I still don't understand why this is not supported from the manufacturer, but they must have a reason?

I did it the way you are proposing. I have a continuous loop with a T-fitting. The T-fitting ties into the inlet for the manifold.

Also, since I run fire-on-demand hot water, I agree that continuous circulation (in this situation) would be a bad thing. I use recirculation on demand with remote switches, the entire line flushes in short order at six gallons/minute. If your lines are long, I would consider insulating them.

One other caution on these manifold systems, and I mentioned this in another forum. I found a minor (drip-drip-drip) leak from my cold water side of one of my ports. I turned off that individual port (advantage of the manifold) and tightened that one fitting. I found that every cold water fitting needed to be snugged up (only one was leaking, all needed some tightening). On the hot water ports, I found that none had loosened. Let my lesson be a warning to you; throw one of those plastic wrenches on there and tighten your connections periodically.


Miscellaneous  >  Whirlpool tubs by Whirlpool called Cielo or rigid
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/1/2005

Have you looked at any air tubs? These have a drying cycle and blow heated air through the lines after the tub is drained, preventing most whirlpool funk. Lasco, Aquatic, Bain Ultra are a couple of suppliers. We ended up with the Lasco, special order from Home Despot.

While my plumbing supplier could hands down beat the big box on pricing, for this the Box was way cheaper. I asked my plumbing supplier to price match, and HD was below their cost, so they chose not to. Then we used a 10% off coupon for an additional savings. As much as I hate to admit it, sometimes you just gotta shop HD.


Miscellaneous  >  James Hardie siding with 'Topcoat' vinyl paint com
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/14/2005

I am also using Hardie lap siding. I would be careful about putting too much faith in the website vs. what your local wholesalers carry. I wanted smooth lap. The only size the local wholesalers carry is 8-1/4" (7" exposure) - I simply cannot get any other sizes unless I order lift quantities. Lowe's will order lift quantities from a wholesaler in Oklahoma City, 84 Lumber will get lift quantities from a wholesaler in Omaha, Nebraska. I found it interesting that 6" exposure cost the same/plank that 7" exposure did, effectively a 14% cost increase in materials alone because you need that many more lap planks (not to mention labor, but I am hanging it myself so my only cost is time).

The other challenge I found was getting the coordinating trim pieces and smooth vented soffit - the local wholesalers simply do not carry them so they are simply not available, although I got them from 84 Lumber. They run enough trucks between here and Nebraska that they just loaded them on one of the trucks as it was returning.

I think the smooth looks really good. My previous house had cedar lap siding, and it was completely smooth (if you notice no painted wood siding ever has wood grain). All the wood grain products (vinyl, Hardie) look very fake to me compared to the real thing. If I could find a permanent paint for it, this would be the best of all worlds.


Building Phase  >  Footing depth?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 5/23/2006

Your footings need to be below the frost line to prevent heave, as John noted. Even though you are farmstead exempt from inspections (whatever than means, I really don't know but it is not necessary that I do know), there are still building practices that should be adhered to. The footings should also be sized depending on soil bearing capacity and the size and loads of the structure you are building - I realize that most people don't get a geotech analysis to size footings, but anything less is a guess. Proper sized footings are cheap insurance, fixing them later is very expensive.

For reference, in Kansas City they want to see the footings at least 36" below grade, although there are special exemptions if you have to excavate bedrock. I didn't do a geotech analysis, I just poured them big (24" wide, 12"-14" thick), but I also built ICF so I needed larger footings due to the increased mass. Although it wasn't necessary to pour them this thick, this allowed me to use the PT lumber I used for formwork as my window bucks, saving me some material cost.


Owner-Building as an Investment  >  Hot or cold?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 5/23/2006

I would say in the Midwest it is definitely cooling off. There is still considerable new home construction, and the subs seems to be quite busy, but the resale market is starting to soften up. Since most people need to sell their existing house to buy a new house, this will eventually translate into the new home market as well, although it is not readily apparent just yet.

Shift takes some heat out of home sales

Oversupply and softening demand turn the KC area into a buyer’s market

By KEVIN COLLISON
The Kansas City Star

This is peak season for selling homes, but Joey King has had his four-bedroom, 3 1/2 -year-old home in western Shawnee on the market since mid-January.

He already has dropped his asking price from $309,950 to $289,950. Now he is willing to throw in the family’s home theater setup that includes a 55-inch, high-definition television.

King and his wife, Brooke, a pharmacist, have two young children and are expecting a baby. They are building a house on 18 acres near Louisburg, Kan., that is scheduled to be finished in late July.

“We’ve tried a multiple of things,” said King, a 32-year-old computer software salesman. “We’ve lowered the price, put in incentives to the agents, and the buyer can even take the refrigerator.”

Join the growing crowd. After years of record-breaking home building and surging sales and prices, the Kansas City-area real estate market is awash in homes for sale.

Inventories for new and existing homes are at historic highs while demand is reverting to historic norms. The result is that homes are sitting on the market longer than they have in years, price appreciation is ebbing and stealthy incentives increasingly are becoming part of the negotiating process.

It’s all supply and demand — and it’s becoming a buyer’s market.

On the supply side, there were a record 21,104 new and existing homes listed for sale in April, a 30 percent increase from a year earlier, according to the Kansas City Regional Association of Realtors. That figure did not include homes being sold privately by owners.

On the demand side, meanwhile, sales softened. In April, the Realtors reported 3,090 closed sales, still healthy but down 13.5 percent from a year earlier. The average sale price for a new or existing home in April increased 2 percent, to $180,128, from a year earlier.

What is happening, real estate professionals say, is a shift to a more normal market after several years of red-hot real estate. They say there are fewer discretionary buyers who took advantage of the exceptionally low interest rates of the last few years to move up the housing ladder. As a result, the inventory of available new and existing houses has swollen significantly — and it will take time to work it off.

“The people who wanted to buy entered the market during the past five years when rates were more favorable,” said Jim Gamble, an agent with Reece & Nichols Realtors and past president of the area Realtors association.

“Now, the people who have to buy are driving the market: people moving into town, people getting divorced, people having more children — all the things that happen in life. It’s a more balanced or average pool, and the inventory is sitting on the market longer.”

A buyer’s market

When there is less than six months of inventory for sale, Real estate agents consider it a seller’s market. Above that constitutes a buyer’s market.

By that standard, April marked a buyer’s market, with 6.8 months’ supply of new and existing homes on the market. There were 6.2 months of existing-home inventory for sale in April, while there were 9.1 months of newly constructed home supply for sale.

Some industry experts have warned that sales competition would make it tough for people trying to sell larger, recently built homes near outlying subdivisions where similar larger houses continue to be built.

That appears to be what is hampering the Kings in selling their home in the Maplewood of Crimson Ridge subdivision in Shawnee.

“There are so many new spec homes sitting out there, which I think is hurting resell,” Joey King said.

Tim Underwood, executive vice president of the Home Builders Association of Greater Kansas City, said builders had noticed the shift in the market.

So far this year, permits for future construction are down 13 percent from last year, but inventories remain high. The local industry is coming off four consecutive years of building more than 10,000 houses annually.

“The number of finished unoccupied homes is 35 percent higher than a year ago,” Underwood said.

To be sure, no one is predicting that the housing bubble will burst in Kansas City in the way that some expect in such hot coastal markets as Florida and California, where prices exploded in recent years and unsold inventory now is piling up even faster.

Indeed, industry studies and the financial press regularly cite Kansas City as a comparatively safe housing bet because of its steadier growth and price appreciation in recent years.

Even so, the local real estate market is adjusting to the new supply-and-demand equation. One early indicator is the appearance of stealthy incentives to attract buyers.

Homebuilder Bruce Rieke, for example, is offering buyers a free two-year lease on a BMW 325. He has sold four homes since the promotion began in mid-April and has two sales in progress. His homes range from $300,000 to more than $1 million.

“There’s more competition than before,” said Rieke, who has built homes in Johnson County for 17 years. “You have to differentiate yourself from the competition.”

Soft landing?

Despite the increase in incentives, housing prices generally are holding up, according to the Realtors association. Price appreciation is expected to continue — albeit at slower rates.

The average price for a new house in the Kansas City area was $264,574 in April, up 8.5 percent from the previous year. The average sale price of an existing home was $158,199, up 1.3 percent.

“We’re not seeing the appreciation we had seen,” said Dan Whitney, president of Landmarketing Inc., an area housing research firm. “Builders and developers don’t have the elasticity to move up their prices. It’s a difficult time because costs are rising rapidly.”

One key expense that is affecting buyers and sellers alike is mortgage rates.

The typical interest rate on a 30-year mortgage has climbed about one percentage point in the last year to nearly 6.75 percent. That means the cost of repaying a $150,000 home loan is almost $110 more per month than it was a year ago, said James B. Nutter Jr. of James B. Nutter & Co. mortgage bankers.

“We’ve completed the move to a buyer’s market,” Nutter said. “More and more people are so informed about this. They understand that supplies are up and sales are down. They’re going to try to get the best deal they can.”

A slowdown in the national housing boom — which some economists credited for helping create four out of 10 new jobs in recent years — would affect the broader economy. Although the U.S. gross domestic product surged at an estimated 5.3 percent annual rate in the first quarter, it is expected to slow in the latter half of the year.

David Lereah, chief economist for the National Association of Realtors, said he expects a “soft landing” for the national housing market. The national association on Thursday reported that April sales of existing homes were down slightly, and the nationwide median price of $223,000 was up 4.2 percent from a year earlier, the smallest year-over-year increase since September 2001.

Some see that as a buying opportunity, if would-be buyers can sell the houses they already are in.

“Some of the consumers who haven’t bought the past four or five years will find better values, but their challenge is getting out of their existing houses,” Whitney said. “Many have taken cash out of their houses by refinancing, and they don’t have as much room to negotiate a price.”

Showtime for sellers

Real estate agents like to talk about “staging” when it comes to selling a home. That includes making sure the first impression from the curb is positive, and once the buyer is inside, making the home feel more spacious and inviting by properly positioning furniture and eliminating clutter. Scented candles, soft music and freshly baked cookies often are part of the show.

“It’s critical that sellers stage their properties well and price according to the market,” said Greg Koons, broker-owner of Re/Max of Kansas City and a past president of the Realtors association.

Bob Hennecke and his wife, Debbie, recently bought a home in the Highcroft area of Overland Park. They had been living in a condominium in Mission but decided last winter to search for a bigger place after having their first child. Their price range was $180,000-$220,000.

Bob Hennecke estimated that he and his wife looked at 50 houses before buying.

“I did notice the houses that were quality houses were selling quickly and the ones that need work, unless priced right, were staying on the market,” he said.

“It was my impression that people still thought it was a seller’s market and could put any house on the market at a price above the market. They weren’t so much concerned about how it would appear.”

Teresa Booker, a real estate agent with Keller Williams Realty Partners, organizes quarterly seminars on the housing market for fellow professionals. She detects a growing nervousness among some colleagues.

“Some agents feel they’ve already hit a summer slump,” Booker said. “People are best served by talking to agents who are candid, honest and realistic about the condition of their property. Then they’ll get accurate and competitive pricing.”

On the pricing front, the homes that are taking the longest to sell generally are the more expensive ones. Entry-level homes continue to do well. In all categories, rational pricing is the key to getting a deal.

Kathy Copeland, an agent with Prudential Kansas City Realty and the president-elect of the local Realtors association, said how well the local housing market does this year may depend as much on psychology as supply, demand and mortgage rates.

“We need to be very positive,” Copeland said. “If we believe it will slow down, then indeed it could. I’m telling agents it’s a very decent market.


Miscellaneous  >  Insurance Coverage Problems
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 12/14/2009

Yes, my insurance premiums are pretty stout. I got two explanations from my agent; the first is that we saved a lot of money by O-B, and they can't account for that in their replacement costs as we would have the option of just hiring a GC to replace or repair our house. The second was a surcharge for ICF, yes I pay extra because I built ICF. He had two explanations for this as well; the first was that replacement of ICF was premium, and thus the insurance rate was compensated to account for this premium.

The second was that if a tornado hit my house compared to my neighbors' house, the insurance company risk curves would count both at a total loss and start with demolition on both sites, and then complete replacement. However, the difference would be that demolition on a stick structure would be basically site clearance, whereas demolition of a reinforced concrete structure would be time consuming and expensive (his estimate is over $70K for demolition costs associated with rebuilding). I suggested that the reinforced concrete structure designed for 250-mph wind gusts might not need demolition in this situation? Obviously that went nowhere. At least for fire, I qualify for masonry rates and these are significantly less than more traditional construction. ICF pays me back enough other ways that I still highly recommend it.

So short answer, my experience with insurance cost is similar to yours. I stroke that check annually.


House Features  >  door height /density cost differences
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/27/2005

I used some 8' exterior doors. The main problem was not getting into the custom market. When you are shopping for 6'8" doors, you order from a large catalog with a myriad of options - glass, hardware, panels, everything. When you order 8' doors, you get a page of standard styles to choose from.

For example, I wanted brushed nickel hinges on my 8' door. This wasn't an option in the catalog, so it put me into the custom door market. This one change on an otherwise standard door was a cost increase of over $150. I asked if I could purchase the nickel hinges separately, and they were willing to sell me the same hinges for $1.60 each. So, the hinges came taped to the door when it was delivered. Now why they couldn't assemble the door with different hinges I will never know. But I got my "custom" door anyway, just at a standard price.


House Features  >  Ceiling height cost differences
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/1/2005

On my house, the cost of one additional layer of Insulated Concrete Form, which increased the total house height by 16" was right at $1.5K in place (ICF block, rebar, concrete, labor). This doesn't account for increased length of interior framing. My sheetrock bids came in right around $.73/s.f. and would also need to be factored in to the total costs.

What I found was that precut studs were more costly than full length (e.g. the 92-5/8 studs that result in standard 8' walls were more costly than 8', the studs that result in 9' walls were more costly than 10'). You will use the scrap anyway for sheetrock backer, bracing, cripples, headers, etc., so just get the longer studs and save some money. I also found the precut studs varied in length as well, and needed some cutting to get them all exactly the same, so they don't really result in a time savings either. Maybe it was the lumberyard, but I got great quality lumber with very little wasted pieces so I tend to think the quality control issue was elsewhere.


Missouri  >  Mid Missouri
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 5/19/2006

Welcome to the site. I am on O-B Connections, but let me warn you that messages get picked up by my anti-spam filter, so unless I check periodically they get automatically deleted. 

If you have questions of a general nature, post them to the general forums and you will get better response as we don't seem to get too much traffic over on the local forums area. However I am always willing to help, and we seem to have a fair number of people from Kansas City also willing to help, although I don't know how many subcontractors we deal with are willing to travel to Columbi so you will be out there on-your-own somewhat.

If you run the numbers and you don't have extenuating circumstances, I doubt you will find that geothermal to be cost effective in our environment. We get better payback out of incorporating passive solar, upgrading insulation, controlling infiltration, better windows, airtight sheetrock, etc. than we do by going with geothermal. Build energy efficiency in first, the payback will be greater than trying to add energy efficiency through the most energy efficient HVAC.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/12/2007

If you do all of that, you will have more building knowledge than most of the people that undertake an O-B project the first time. Knowledge is good, and being overqualified is always a good thing. However please remember that O-B is about managing the project too, and not just how these houses go together. I am pretty hands-on though, I like to know how it comes together so I know if the professionals are getting me good product. Also I sometimes like to show the professionals a better way to do their job, better construction at less cost is a win-win situation for all parties involved.

There is currently a discussion on the Planning forum of the General Forums on must read books. It hasn't had much traffic, but gets you a starting point. As to recommending Mark's books, or the Whole Enchilada, I am not the person to talk to. When I started this, the Whole Enchilada was not available. I was still on the third edition of The Owner-Builder Book (the fourth edition is greatly improved), and many of the books I read are out of print or re-released.

That a pretty big house down there you are planning on building. Is that a year-round house, or vacation house? The reason I ask is I might recommend considering different construction techniques (ICF or SIP), but if that is summer only then I wouldn't worry quite as much about thermal mass. Also (and I have not been down there in awhile) you will be somewhat restricted to local talent and subcontractors, so you don't necessarily want to be the learning laboratory at your expense.

As far as sitting for a MO GC license, check with your permitting authority where you are building. For me, sitting for the license basically meant writing a check. I learned to do that in high school, I like to think that it takes more expertise to build a house than write a check but the gov't. doesn't necessarily agree.

I would definitely consider the community college avenue, perhaps you don't need the entire associates' degree, but I bet some of the coursework is definitely worthwhile. Are you in the KC Metro area, which community college? I didn't know we had this option and would be interested in learning about it.

And as to Habitat for Humanity, definitely some value here.  There are two kinds of people who volunteer; those who know what they are doing, and those that like to say they volunteer. The first type tolerates the second type. Gravitate towards the first type and really try to learn something (it is really easy to tell the difference). Don't waste your learning time scraping sheetrock mud off the floor, sweeping, and picking up trash - help the real workers get the real work accomplished and let the volunteers do the menial labor. And in the end besides learning something, you also helped a somewhat valuable cause. Spend some time learning the language, trades like to talk to people who know the language and it definitely gives you an edge when talking to them.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/12/2007

If you are looking for an eventual year-round house, I would look at ICF. However the challenge, depending on where you are building at the lake, is getting equipment in. For ICF, you need to have good access for a concrete pump. Concrete pumpers get some good money, and you get to pay travel time, so make it efficient. Depending on which side of the lake you are building on, your concrete pumper could be traveling quite some distance. Looking at SIP (a strong second choice for me), you still need to get a boomer in there, which will probably be more local.

The problem with SIPs is that they are prebuilt, and any variation in your foundation could be problematic. I built ICF, and had my trusses built to my template, which was based on my footers. I had some 30-degree angles (which for construction is unusual) and although my angles were set very close, trusses built to the drawings and not to the template would have been problematic. Trusses built to the template were exact. Now next time I pre-order my trusses and get my surveyor out twice (once before my excavator gets there, and again to lay out the footers), time is also a factor that must be considered and survey equipment is much more accurate than anything else out there. For panel-built (of which SIP is a subset), this is critical.

I will check out the metropolitan community college coursework. I don't need it (I manage far bigger projects), but I get a lot of inquiries from local O-Bs and I like being somewhat informed.

Most of your questions will be answered on the General Forum side of the house, the local forums don't get much traffic. As to local suppliers and contractors, your best bet is O-B Connections in your area. I get over here simply because I am a moderator and Mark sends all posts to my email directly, so I know when there is traffic. And as a habit, I check the Kansas forums too since I am so close.

And yes, the MO GC program thoroughly disappointed me. I always felt (before my O-B experience) that I could rely on professional builders having some modicum of experience or knowledge. After doing this once, I realize that I will never again trust professional builders (not to say all are bad, but I have seen houses built with minimal actual building experience by a professional builder who had no qualifications whatsoever). As to the inspectors, they are your friend but they have limitations too. No one cares about your project the way you do, again it never hurts to be over-qualified when it comes to construction knowledge. I found many cases when I could explain different construction techniques to my subs (e.g. using Miami-Dade Building Codes) that actually both saved me money and resulted in better construction. This is something they can incorporate later (and save money, and set themselves apart from competition, and probably ultimately charge more money) and I get for a reduced price, I like that.

As to Habitat for Humanity, all of the Kansas City chapters have recently joined together, they are Heartland Region Habitat now. I have been involved with several previously that were very good (Wyandotte County had great ICF houses), and some that were not so good. Perhaps with the joining all under one umbrella, they are all better. PM me, and I will send you some contacts to look for on Habitat houses. One of which is the single best resource in Kansas City on ICF - he has worked both the custom $1M+ houses and Habitat (as a paid employee, not volunteer) and knows more single-handedly about ICF than any other source locally.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/14/2007

I checked out the KC Area Metropolitan Area Community College link to Construction Management Associates' Degree. Wow, right in our backyard. I would recommend any prospective O-B's in our area at least get some more information on this program. Now then, it requires 63 credit hours, but 15-18 of those are general (history, English literature, etc.) that really don't equip you for construction management, so i don't think I would pursue the entire degree unless I had a larger long-term goal such as trying to get a job in the construction industry. 

But that doesn't mean many of the courses are not worthwhile. If you pursue these, please provide some feedback on the courses you are taking, and which you feel would be the most worthwhile for an O-B. I think that would be a valuable resource to other O-B's in our area, both from a content area as well as potential networking with other people either thinking about doing this or in the industry.


Planning Phase  >  Building with ECO-Block, anyone know it?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/30/2004

I have found that all of the ICF distributors I have talked to are ICF builders first, and distributors second. They have a tremendous amount of expertise of actually how to put this stuff together. We had one designer try to steer us away from ICF construction as he had done one house 5-6 years ago that went $100K over budget. After looking at the plans it became obvious, as every window was arched and it also had radius corners - it was a $1M house to begin with. Then they used a concrete flatwork crew for the stacking and pouring, no experience with ICFs. If you want to train a crew, you don't start with a $1M complex house.

I have been on several placement and pour jobs; it really isn't that complex if you have a good distributor who is willing to help DIY'ers. My lowest bid just came in for cheaper than 2x4 construction, but the bid comes from a crew where the least experienced member still has 5+ years experience. I wouldn't let HGTV steer me away from ICF. Just be informed about what you are doing.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 7/21/2009

Dennis,

Sorry for your bad experience with ICF. This has also been discussed on the ICF forums at greenbuildingtalk.com.

As to ICF, it is just polystyrene with webs and rebar chairs every 6-12" o.c. Look at any of the myriad of ICF forms available, they are all very similar, including the price. They all use the same density of Polystyrene (although commercial blocks are higher density Polystyrene, all residential blocks I am aware of are the same density), they all interlock at the top and bottom, some fold, some are site-assembled, some ship fully assembled. As with any other construction material there are qualified installers and inexperienced installers.

My message has always been clear. If you are interested in ICF, choose your installer first and let them use the ICF they like. If you are DIY, choose your supplier very carefully based on their experience and service after the sale. I have seen enough DIY first-timers install ICF without any of the issues you illustrate, showing that if you pay attention to details, it is not that difficult (but they didn't buy this stuff at the big box with no service after the sale, either).

Hiring unqualified subcontractors is the fault of the O-B, and not the fault of the material. If you saw a house framed out-of-square, would you blame the framer, would you blame the lumber, or would you blame the lumber supplier? Me, I would suggest that the O-B perhaps didn't check the qualifications of the framer they hired in the first place, and it certainly isn't the fault of the lumber supplier or the lumber. Yes this ICF installer was recommended by the distributor, but that doesn't relieve the O-B from actually visiting completed projects this installer performed and talking to past clients that used this installer.

In the interest of full disclosure, I am a licensed ECO-Block distributor (yep, I took the ICF class, any O-B remotely interested in ICF should make the one-day investment for this class, whether you intend to subcontract it or DIY). However I also used Amvic on my O-B project, but that was because I subcontracted the ICF and that is what my installer preferred.


House Features  >  Favorite Features
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 6/9/2009

Interesting topic, I will watch this one closely to see the feedback.

 

I compare my house to my favorite piece of clothing, my favorite leather jacket, my favorite chair, or my favorite pair of shoes. Think about it, what is it that makes your favorite chair what it is? Is it the covering, the style, what? It is not easy to define as one feature, but the whole is greater than the sum of the parts and it is just inherently “right” for you. Your favorite pair of shoes probably doesn’t fit me, and if they did I might not like the style.

 

That is how I feel about my house; I can’t point to any one feature so much as I can just say “it fits.” We worked with an architect, which was a very difficult exercise for us. Instead of traditional design questions you might expect, he wanted to know things like “how do you want this room to make you feel?” Huh!?!? Well, once we sorted that out, I can say he got inside my head and determined what I wanted better than I could explain it, and truthfully better than I knew it myself. He didn’t design a house, he designed my house. No different than getting custom made clothing vs. off-the-rack. It is that transparent, you can’t describe it, but the house is just right.

 

If I were to build another house, I can’t imagine I would do much differently. Sure I would change some things in the interest of ease of construction, perhaps some different finishes, I know where the one error in the construction drawings is and would avoid that, but overall I can’t think of much I would do differently or specific “features” I wish I added. More often than not, I don’t notice specific “features” until I see other houses (new construction, major remodels) that don’t have them and then I think that for only a minor effort more you could have achieved greatness vs. mediocrity.

 

Now then, to attempt to answer your question as to what simply “works” let me try.

1)    We designed passive solar, this simply works. In the winter, we get just the right amount of heat gain. At night, due to quality shell construction, we don’t have significant heat loss. It all balances out very nicely, never too hot and rarely needing HVAC intervention to warm the living area. In the summer, we have adequate overhangs to protect from excessive heat gain.

2)    In conjunction with passive solar and super tight envelop, we needed HVAC that wasn’t traditionally sized. Given a challenge, we built flexibility into the system. Five zones of ductwork, but we left out the zone controller and thermostats ($1,200 for the zone controller, we adjust manually twice/year, thermostat wire is already in place). Your HVAC tech needs to know that this doesn’t fit into standard analysis techniques.

3)    I used a fire-on-demand hot water heater. I never run out of hot water. We had guests this past week, one liked long showers. Every house I have lived in previously would have been a challenge, not this one. These are transparent features you don’t notice until they don’t work or you don’t have them.

4)    Durable and low-maintenance finish materials, inside and out. We have three large dogs and entertain frequently. The comparison of dust mopping the entire living area vs. pulling out a vacuum cleaner, and truthfully a dust mop across hardwood is much more effective at cleaning than a vacuum across carpet. James Hardie exterior siding really holds a coat of paint, exterior fiberglass doors and windows are equally low maintenance. Other examples include Corian windowsills instead of wood (dogs like to look outside), tile entries at every door, composite deck, timeless finishes instead of trendy. Think about your favorite leather jacket, it feels better and looks better today than it does the day it was brand new – choose finishes and materials that will age with patina vs. simply wear out or look dated.

5)    The layout of the house is as comfortable for two people spending leisure time as it is for entertaining a large amount of guests. For example the kitchen is open to the living area, so guests are connected (for us, the kitchen seems to be a gathering point) without crowding the kitchen. Yet the kitchen is comfortable for one person to cook, but when other people want to help we have five separate workstations we can spread out to.

6)    Hire professionals vs. technicians. Any electrician can wire a house to code, a good sparky will listen to what you want and need, and suggest ideas to make that utility transparent to your lifestyle. They might suggest larger service, more circuits to certain areas (kitchen, entertainment center, future hot tub, garage/workshop), areas with insufficient lighting details, areas you might want future ceiling fans, switched exterior outlets for Christmas lights, all things that become transparent because they work for you and are not simply code minimum. Sparky is just one example, every professional you hire has experience you want to listen to, and many of these professionals can save you money in the process.

 

From these examples, these are features that become transparent once you live here. I have probably missed dozens of examples (and the architect was only responsible for #1 and #5 above, but good design is a critical feature that can’t be easily changed or retrofitted later).


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 6/19/2009

Mandatory reading for all O-B's in the design phase should be Better Houses Better Living. I checked out the previous version from the library (truthfully I checked out seemingly 100's of books from the library, most took all of a couple of minutes to review and return) but had so many Post-it notes stuck in the book I just had to buy my own copy so as not to lose the thoughts. Many of these suggestions and ideas cost absolutely nothing, but the concept is that your house should be user-friendly.

I had the previous version of this book at my job site. Over lunch it wasn't unusual for a tradesperson to read it. Every one of them was more than impressed with the book and came away with ideas and suggestions they could use in future homes they would be working on. I probably sold a dozen copies just from subcontractors working at my house.

This was one of the very few books I recommend purchasing.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 6/20/2009

Great point on Universal Design, I did this as well. I have stepless entrances from both the garage and front entry, wide doors, and many other features of Universal Design. My thought was just as yours; if I ever need it I will really appreciate it, if I don't I won't notice. Actually my movers noticed, they said this was one of the easiest houses to get large furniture in that they had ever experienced. Most of these features don't add cost.


Planning Phase  >  Getting bids before or after permits?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/20/2008

I am a big proponent of sharing draft plans with subcontractors, prior to having your designer drawing the final plans. The reasons for this are twofold;

1) I like to have a handle on costs. Are you going to get firm bids, probably not. Are you going to get ballpark bids written on the back of a napkin, probably. During planning I always wanted to make sure I was in the ballpark, and the back-of-napkin bids were good enough for me. Also I wasn't looking for three or four bids from every trade at this point, just ballpark.

2) More importantly I wanted their input on how this gets constructed, and any changes that should be made now to make their jobs easier as subcontractors, or using their expertise to give me a better overall product. This may be fairly simply like building in some utility chases to you can get plumbing, electrical, or mechanical up the walls. Some of this is so basic as to not locate a truss where you want a toilet, but is rarely considered (normally that truss would either get field modified [a bad thing] or that toilet would get moved).

As it turned out, the subs I consulted during planning did almost no work on my build job. However the subs I hired were all amazed that their trade had been considered in the planning process, and definitely appreciated this extra level of detail. This level of detail also resulted in almost no field changes (one field change based on an error in my plans themselves), and no field changes equates to no change orders, and this is good from a budget perspective.


Construction Bargain Strategies  >  Floor joists?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/27/2005

I found open-web floor trusses to be a cost savings over TJI wood I-joists. The beauty of open web is all of the utilities can be run in the joists, leaving a flat ceiling in the basement. You need to coordinate with your HVAC tech to make sure utility chases are in the spots s/he would like them, but otherwise not a huge issue.

The biggest advantage of open-web joists are no one hacks them apart. With TJI you are limited to certain size holes in certain locations. With dimensional lumber you will find all of the subs will hack them up to get their pieces in. With open web, no one touches the trusses via modifications. Nice. That they offered a cost savings over TJI made them a no brainer (both TJI and floor trusses from the same source too, so a real comparison).


Finding Subcontractors  >  Workers' Comp for hourly employee/ friends
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 5/19/2006

You might try sending them to a labor shop, and having the labor shop pay them an hourly rate. I used Labor Pros and Labor Ready both. I had agreements with both if I wanted to hire someone specifically that I could send them in. The labor shop hired them at my hourly rate plus their surcharge for insurance, and their service charge, and they would then send them out to my job site. I found this a more cost effective way to make sure they had insurance, they also paid taxes and I didn't need to worry about the administrative costs.

I found that friends in the planning stages were not very reliable labor. I helped people build their own houses, had several friends volunteer, have friends that felt that if they helped me I would help them with a project later (I would), etc. When it came time to work, very few actually showed up.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 11/6/2006

Yellow Pages. There are day labor shops in most medium size to larger metropolitan areas. The idea was not mine, it was recommended to me by a person working on Habitat for Humanity houses as a way to get side labor but still with insurance coverage.

As a GC with no history, I found workers' compensation insurance to be prohibitively expensive. In fact they wouldn't even write it unless I covered myself first, at a fairly high salary even though I wasn't making any money. (I figured my time on my house was free; I have a day job after all). And then it was based on class of labor. For example, workers' compensation on a roofer was 120% of their salary (and we wonder why there are so many companies willing to hire/exploit illegals doing roofing work?).


Planning Phase  >  Engineer needed for HVAC?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 5/19/2006

I would be careful hiring an HVAC subcontractor to do your design. Some of them know what they are doing and will provide a very good design, others are just metal benders and don't know enough about sizing ductwork and HVAC systems that you will never get a balanced system with proper airflow to every room.

If you don't believe me, take your plans to three to five HVAC subcontractors and ask them each to design the system you need. I found that by doing this, I received multiple designs that had no relation to each other and certainly couldn't be compared apples-to-apples. At the very minimum, download one of the trial software packages for HVAC design, and do the calculations yourself. The best solution is to hire a mechanical engineer. I hired one and mine more than saved me his fee. In the end, engineers usually save far more money than their fees.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 5/30/2006

To be honest, the M.E. I hired I would not use again. I didn't even share my engineer's report with HVAC contractors and ask them to bid it apples-to-apples, as the HVAC subcontractors (or any subcontractors for that matter) tend to inflate their bids if they think an engineer or architect is looking over their shoulder. If I provided an engineer's report, they would make the assumption that said engineer would be inspecting their work.

I used the engineer's report to determine which HVAC subcontractors truly understood system and ductwork design, figuring if they have this level of knowledge they probably also have good installers. I found one HVAC installer that did truly quality design (I tend to think the quality from this source was better than the engineer I paid), although I found out later that they don't do their own designs and they subcontract this portion out. They include this design as part of their bid process (no charge), obviously using someone very knowledgeable and with a proper software package.

For the HVAC subcontractor I ended up hiring, I shared his design, the engineer's design, and the other HVAC tech's design and we discussed why the differences between them and what we should do to make sure the installed system is the "right" system for my house. Doing this over again, I now know who to call to get a good HVAC analysis. An engineer is not required. I would focus on HVAC installers who do commercial work to do the design, although getting one interested in your residential project is not likely to be easy.


How Owner-Building Saves Money  >  Big Family - Lots of Help in Building - DIY
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 9/14/2004

You need to balance the time value of money in here somewhere. If you have financing, you pay interest every month. When you calculate the additional interest cost vs. cost savings from DIY, you find often it is more cost effective to contract it out. You need to treat yourself as a limited resource, and determine where your time is most effectively spent.

Another thing to consider is builder's risk insurance. Ours comes as a single policy with a time frame of up to one year. If we complete the house in six months, we don't get a rebate for half the policy amount. If it takes 13 months, we have to pay for another policy, which is good for one year.

For some trades you will find it is actually cheaper to contract than DIY. I don't know what it is about insulation, but I can have better insulation installed cheaper than I can get materials and DIY. The key is to be honest with yourself about your skills, and focus on the trades that have higher labor to material costs. I know for some issues we chose to DIY, we upgraded materials or bought nice tools to assist relatively inexperienced people (us) to do a quality job, and by the time you consider this increased cost it didn't really save money. However I do have some really great tools I will use in the future, and the capability to use them appropriately, and this is worth something as well. I also learned some basic carpentry capability (I hired an experienced carpenter to help me), basic plumbing (I hired a plumber to help me), basic electrical (my brother is an electrical contractor), and really understand the mechanics of the house.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 10/16/2004

Great post, John!!!

I'll second what you say about making sure you have the funds to have someone do all of the work. When I was securing my financing, my banker wanted bids from all of the major trades, and strategy for how the rest would be done without our involvement. I thought this was a bit silly and a large waste of time, as we fully intended to do most of the work ourselves. However he asked the question "what if you break a leg the first day on the job, how do you ensure it gets completed?" My translation was "we don't really care about you, but we (the bank) have a lot of money tied up that we don't want to lose."

When we started getting bids, we realized that hiring professionals would still allow us to meet the ultimate goal. At this point, we chose some high return on investment tasks to do ourselves. For example, originally I was going to do my own ICF, but I found a talented crew (each individually with a considerable amount of experience) that was trying to get established in my locale - this was win-win situation for both of us as when they submitted the bid this turned out to be a low return on investment task for me, so I hired them.

I never really considered how my lifestyle might change if I was injured, just how my house would get completed. There is more at stake here than just building a house.


Construction Bargain Strategies  >  Hiring Out-of-Area Subcontractors, Pros and Cons
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/20/2008

Oleg,

I am surprised this post has been out here a couple of weeks without any responses. I can share my experience.

I hired an out-of-town ICF subcontractor for my ICF work as well. I had a couple of challenges:

1) Checking workmanship and quality of other ICF projects that the subcontractor had completed before I signed the contract required me to take several days off work and drive around western Kansas. I saw a lot of windshield time before I was confident in their capability. Local subcontractors you can probably do this after work or on weekends.

2) The subcontractor had to pay travel and per diem to his employees, and he also paid one way of drive time. As a result, he wanted to come out for full weeks of work -- so if the weather was calling for rain on Wednesday he may decide it wasn't worth the drive time for two days of work. As a result, my shell took longer than it should have. Local subcontractors don't have to worry about this. You get to pay for this travel cost; it will be included in their bids.

3) ICF requires other support than just a crew, including local concrete ready-mix plant, local concrete pumpers, and other local supplies. "New" subcontractors that may not necessarily bring in repeat business may have difficulty competing with established ICF subcontractors with the concrete pumpers (price and/or service). Establishing new ready-mix accounts shouldn't be an issue, but concrete pumps are expensive, so having a local subcontractor with a better price may result in more competitive bids.

That said, I received top-notch ICF workmanship (straight, plumb) at a great price. I have had no problems recommending this ICF subcontractor to others, and I know he has accepted other jobs in my area. If I were building another house tomorrow, I would do it again.

There were other subcontractors I hired who weren't exactly local; the main problem is checking references (and not just calling people over the phone, I like to actually check workmanship, preferably before it gets covered up) and paying for travel expenses.


Financing  >  Interest Payments
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 10/16/2007

A couple of things, and I think Tiffany hit on them as well. I found you cannot convert your loan to permanent before the invoices come in. I had a single closing on a construction to permanent loan, but my lender was only interested in servicing the construction loan and once it converted sold it immediately. They were very stringent on having all invoices, all invoices paid, and lien releases from all suppliers and subcontractors before converting to permanent loan, either for their protection or to make the loan marketable on the resale market for these things. Please note that I had one threat of a mechanic's lien, and I was certain to close prior to that being filed (and several years later, it has never been filed).

Most of the time, I simply paid the interest out of my pocket. My interest was calculated based on what was disbursed, so at the very beginning of the project this monthly payment was very small. At the end of the project when most of your money is disbursed, your monthly payment will almost equal your house payment (not accounting for taxes and insurance, which I am not required to escrow if I can demonstrate capability to pay them directly). Granted you are paying interest only and no principal costs, but at the early end of a 30-year note you are paying mostly interest anyway with very little principal. Again this doesn't include the escrow payment that most people make that covers taxes and insurance. Also note that the construction loan will be at a higher interest rate than your permanent loan, so it is possible that your permanent payment may be less than your monthly interest charges on your construction loan at the end of your build job.

To estimate interest costs easily (and probably close enough, but that is for you to decide how much work you want to do on the estimate), I would use my interest rate, and also use a standard monthly disbursement (which in your case would be $423K/12 months, or roughly $35K/month). Your first interest payment (after one month) would be about $235, your last monthly interest payment would be about $3K, so your total interest charge over a 12-month build would be about $17K +/-. Note that this didn't take me very much time, but probably puts you in the ballpark. Be sure to verify the numbers for yourself, and if you have questions ask your banker.


Planning Phase  >  Planning to stop before we're done. Hmmm.
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 5/28/2009

Rather than “not finish”, I would look to commercial construction practices. Have you ever noticed that when a company closes or moves, a new company can move in, totally gut and reconfigure the space, and be done fairly quickly and open for business? They may even totally change the nature of the business that was in there; perhaps from office space to retail space to restaurant space. The other construction practice I would look to would be the alternative reuse and conversion of historic commercial space to residential lofts. This is currently common in urban areas, so depending on location you may have access to this type of build-out.

 

I think residential construction should adopt some of the “easy reconfiguration” aspects common in commercial construction. Structures should be built for 100+ year life spans. Clearly within that life span there should be capacity for reconfiguration; utility systems will need replacement and upgrading, most interior materials will have long since been replaced (100-year-old kitchen anyone?), the occupants of that structure will have changed, wall systems should able to be easily reconfigured as occupants needs change, who knows what technology brings us in this time frame that you may wish to retrofit (100 years ago, electricity wasn’t so common in structures and they used natural gas lighting, not to mention sprinkler systems, fire alarms, technology, lower-cost solar is coming). Notice that much of this is incorporated into commercial construction, but how much of this is incorporated into residential construction? Clearly you can’t anticipate everything; life safety, ADA compliance, earthquake structural retrofit requirements, etc.

 

Setting that stage, I would focus on good design (qualified architect, not a standard house designer), quality shell construction, long-life exterior finishes, a minimum of interior structural requirements (free-span trusses, no interior load bearing walls, columns only if they cannot be avoided), accessible utility chases, upgraded utility services coming in from underground (sewer, water, electric). I would then look to a minimum of interior finish, just enough to get a Certificate of Occupancy. From this, you have a space with easy build-out and ability to reconfigure as your needs change (from minimal finish to detailed finish, to reconfigure for the future).


Legal Issues  >  Contractor breaks contract/subcontractor liens
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 5/25/2009

Mary,

I paid attention to who showed up on site and what name and phone number was on the truck.

Lets use my ICF subcontractor as an example, because he used several different suppliers and subcontractors. He used forming lumber for the footers from Lowe's, the chances of getting a lien release from Lowe's is slim to none, however the chances of getting a mechanics lien from Lowe's is also low. However, when pouring the footers, he had a concrete pumper show up and ready mix trucks show up, both with names on the trucks and clearly suppliers that should be paid. Next comes the ICF and reinforcing steel, again this came from a supplier with a name on the truck. If nothing else, this gets me the large suppliers. I can call them directly, or I could have my ICF subcontractor provide lien releases from suppliers before the next draw (he needs a draw to pay suppliers so the lien releases only come after the draw, but before the next draw). I used both techniques (calling suppliers directly, having subcontractors provide them), and neither had any problems with either technique.

Now then, for some subcontractors (sheetrocker), the only truck that showed up was from them. The supplies came on their truck, I have no idea who their supplier was. However I also figure if the supplies came from their truck, the supplier probably didn't know they were being installed on my house, and the chance of a mechanics lien is again slim.

I would at least get the large suppliers. Your carpenter will have lumber (or trusses) delivered from somewhere, the plumber will have plumbing delivered from somewhere, the electrician will have electrical materials delivered from somewhere, your concrete flatworker will have concrete delivered from a ready mix plant and may even have a pumper show up, etc. Delivery is free so why would these subcontractors drive over and put this on their truck to unload at the job site? Even better, these suppliers will pick up the excess. However load this onto your subcontractors truck and they no longer deliver, unload, and pick up excess, and your subcontractor needs to take a trip out of their way to go get parts. Due to this service, I didn't even know where some of my suppliers were physically located. Now then there are always small parts that come off the trucks; I had Home Depot, Lowe's, plumbing suppliers, electrical suppliers, etc. all within easy driving distance to go pick up last minute items, I didn't expect lien releases from these suppliers for every item. If it was delivered by a supplier to the job site, that was an indicator that I wanted a lien release.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 5/24/2009

Where are you in the building process and how much time do you have before you need to close your mortgage loan (vs. your construction loan which is open)? The reason I ask is that all liens need to be cleared before you close your mortgage loan, but if you have time it may be worthwhile to let it work to your advantage from a supplier lien. You hired a concrete contractor, who in turn used a ready mix supplier. That supplier is entitled to payment for material they provided to the contractor.

Fair enough, but do you think the only recourse the supplier has for payment is a mechanics lien against your property? I know for most of my large subcontractors I also got lien releases from suppliers as well, but when I called the ready mix plant my concrete contractor used six weeks after the job, they still hadn't been paid. I asked if the account was delinquent, and they agreed that it was. They also identified that this was typical of the contractor I used (slow pay) and that they had methods to receive their money other than mechanics liens, such as waiting until he had a large job with a concrete pump booked for an entire day, and stopping delivery half way through this job until he paid his delinquent amount in full. If you have time on your side, their supplier may have other methods of retrieving their money.

I had another concrete subcontractor (I went through several) that the last truck of the day wouldn't leave until the concrete was paid for in full. At that point, the person with the checkbook had already left, I called my subcontractor, wrote the check myself, and deducted this amount from their bid amount. Again I figure this payment requirement was in direct response to the historical subcontractor paying habits, again another technique besides mechanics lien that gets exercised by suppliers.


Building Phase  >  inspections
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 5/19/2006

When you pull a permit from your code department, they will identify what inspections you need. 


Construction Bargain Strategies  >  Andersen 400 Windows vs. Pella 850
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/15/2008

Is it the Andersen windows you are displeased with, or the service you received from your distributor? Did Andersen mess up the order, or did the distributor mess up the order to Andersen. I am not trying to defend Andersen, but there is more than one entity at play here.

I ordered Milgard Ultimate fiberglass, and while the windows themselves are excellent, I agree that I wasn't entirely pleased with the company I ordered them from. However, I also recognize that the problems were local and not with the windows nor Milgard. I heartily recommend Milgard Ultimate, I might think twice about who I order them from though...

Please provide some clarification.


Construction Bargain Strategies  >  Hiring an independent building inspector?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/22/2005

I would recommend an independent inspector even if you didn't live 2-1/2 hours away from the project site. I did not hire one, but then I also have a degree in civil engineering, project engineering experience, and am not afraid of a blueprint. In fact, to show my bias here, I would look to the pool of engineers to pick my inspector from.

There are so many pieces to the house that are critical, I would want someone looking at it to make sure it gets done right - you can hide a lot of defects with concrete or sheetrock. I know some people like to rely on the code inspector, and after seeing them do the all-rough inspection (framing, electrical, mechanical, plumbing) and their final report, I am extremely uncomfortable relying on them to ensure anything (which makes me all the more scared of spec houses now).


Construction Bargain Strategies  >  ICF's adapted to custom plans?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/22/2005

ICF can be adapted to just about any plan.  Some dimensions may change slightly as the ICF is adapted to the house you want to build, based on the ICF itself.  This is common.


Miscellaneous  >  AVG. SAVINGS ACTING AS GC?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 12/27/2006

Thank you for your apology about all-caps.

 

First of all, a GC probably doesn’t “make” 30% on any house.  However you can save more than the GC profit percentage of 15% quoted by your builders.  Lets look at how this might get done.

 

1)      Your builder has a truck, his employees have company trucks, all of these company trucks get gas, insurance, maintenance on them.  Now on each of these trucks you have tools, someone buys these tools.  The cost of this comes out of building houses, but as part of overhead.  As an O-B, you immediately eliminate overhead, as you already have a car and you are managing your project out of either your apartment or your old house, you have no employees, you have no accountant doing your bookkeeping, etc.  As your builder friends how much “overhead” they charge, in addition to how much “profit” they charge.  Some put this together (OH&P), others don’t.

2)      Now builders will tell you they get better prices on materials because they have commercial accounts.  The problem is this is complete legend, I found I could beat almost every one of my subcontractor’s prices on almost every material.  I had them all bid material separate from labor, using their normal material suppliers.  Some of them turned in price quotes directly from their material suppliers, which I compared to bids I received from my own material suppliers.  Guess whose were lower?  Several of my subcontractors changed suppliers after I showed them my bids compared to what they were paying.  Builders usually only use a couple of suppliers, and they are not very good shoppers, so they pay too much, more than you do.

3)      Just like suppliers, builders like to rely on the same set of subcontractors.  Actually I found that many quality contractors don’t do spec work because the builders are trying to squeeze them for every dime.  However these subs weren’t necessarily more expensive.  My HVAC tech came out of commercial HVAC for a fairly large company, and was trying to start his own business.  He had no history as a business, so couldn’t compete on commercial work.  He really needed some references for residential.  I was able to provide him an opportunity to showcase his residential capabilities, and also provide a reference for future work.  Lower overhead plus startup equates to good deal for me.  This wasn’t the only subcontractor I hired without local history (they all had history though).  Again builders don’t shop for new subs, O-B have to every time so we can get the best combination of price and quality.

4)      Builders don’t take advantage of special offers.  I found great tile on closeout, took advantage of the situation and purchased almost an entire pallet of tile as I wasn’t sure just how much I needed.  Our tile prices on this closeout ranged from $0.25/s.f. to $0.6/s.f. (three different tile styles), original street price ranged from $4/s.f. to $6/s.f.  How many builders would either be shopping for tile deals, or be in a position to take advantage of this quickly?  Builders don’t shop for tile, they leave it to the subcontractor, who again unless they have a place to put it probably are not buying it.

5)      Builders manage schedules, and don’t like to rearrange schedules to fit suppliers or subcontractors.  Take cabinetry for example, I can go to any number of places and order cabinets and have them delivered on a set timeframe.  However I found custom cabinets were a cost savings, custom made using wood of my choice to my house.  What was the catch, my cabinet maker had a nine month wait time before he would get started.  Managing my own schedule, I could make that work and got on the waiting list.  I have much nicer cabinetry than I could have purchased for double the cost, but it took me additional coordination and time to make sure I would get them at the proper time of my project.  Many houses are complete in less than nine months, but since I was doing the planning as well I included the entire process for considering materials and suppliers.

6) Builders do what they know.  Frequently there are other methods you can show them that result in better quality at less cost.  The Internet is your friend here, and most builders are not current on the latest materials or building techniques.

7)      Builders cannot use side labor.  You can hire your friends and family to perform some side labor (not that I would condone such a practice, but it does happen).  Be careful here, just because someone is working as a side job doesn’t actually mean it is saving you any money.  And side labor is outside your normal insurance policy, so you take on additional risk.  But cash talks…

8)      I know what I paid for my house, I also received a bid from a quality builder to build it turn-key as well as just a dry shell.  After I received my bid, I upgraded almost everything and came in with a complete finished cost at the same expenditure that the builder had agreed to build just a dry shell.


Miscellaneous  >  Flexible Heat Ducts
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 5/1/2006

I rarely see flex ducting installs, even on the cheapest spec houses.  The question is what is the standard in Chillicothe, MO.

My HVAC tech had all of the ductwork shop built, it came in to the house in fairly large pieces.  It requires good planning and measuring, but he installed all of the ductwork very quickly.


Finding Subcontractors  >  How do I find subs?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/27/2006

Ray, it looks like you are up in New York State.  Now I don’t have a map handy, but there are 222 people registered at O-B connections in New York State, some of these resources must be local to you?  This doesn’t even consider potential subcontractors traveling from adjacent states if you happen to be near a border.  Unfortunately (or fortunately if you don’t want to receive spam) you can’t simply mass mail all of them, but for those of us that get many more O-B messages than we send it is a nice feature.

 

Is there new construction taking place anywhere near your site?  You might stop in and talk to the plumber and see if they are interested in another job.  This is nice, because you are already on a job they are working on and you get to review their workmanship right there.

 

Do you have other subcontractors lined up?  Subs work side-by-side with other subs on job sites; they know who the good ones are and conversely they know who to avoid.  You might ask the subcontractors you already have lined up who they would recommend to work on their own houses.

 

Have you ever called a plumber for your current house?  Plumbers tend to either be service, or construction, but almost never both.  Your service plumber you use at your house probably won’t do new construction, but since they shop at the same supply houses first thing every morning they know who the good construction plumbers are and can provide a reference.

 

You might call your code office.  Code officials cannot recommend specific trades as they need to maintain impartiality.  However they can provide a list of plumbers licensed to work in your locality, and more often that not they will share their opinions verbally about which are good plumbers and which aren’t.  They get to see the workmanship of all of the competition; they know which plumbers pass code inspections the first time out and which ones require rework.  They won’t commit to anything (maintaining impartiality and all), but they are usually happy to talk if you ask.


Construction Bargain Strategies  >  Craigslist
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/19/2008

Julia, it looks like you have saved $7.5K +/- just on appliances by being an aggressive shopper and being willing to store these items in your current house. Out of curiosity, how much time did you invest to save that amount of money? I would have no problems driving a couple of hours (was that each way, or round trip) to buy a Sub-Zero for $250, even if I left it there, it would probably have been worth the risk at that price.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/19/2008

So for an investment of 32 hours and $80, you saved $7.5K. That works out to over $230/hour for your time, and spare time at that when you weren't otherwise going to be productive. And some critics say that being an O-B doesn't save you anything ;-).

Nice example, I see your journal also provides cost savings you have accumulated. Please keep us posted on your project.


Planning Phase  >  Calculating Linear Feet
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/21/2008

This sounds like a lap siding bid. What is the dimension of the lap siding? I used 8-1/4" Hardie lap siding, which is 7" exposure, but it comes in many different sizes depending on what your local wholesaler carries.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/23/2008

Here is how I would interpret this. Your bid is $5/linear foot of lap siding. The question is how many linear feet of lap siding does it take to finish your house -- right? This way you can at least compare this bid to others you are receiving.

Well, Hardie lap siding is 12' long, and at $5/linear foot this would mean $60 for every piece of lap siding (and for this price, it better include everything including two coats of nice paint). Now then the 8-1/4" lap has 7" exposure, and covers 7 s.f. of wall. So your bid price in a more comparable unit is $8.60/square foot. Please note that this is square foot of exterior wall space covered by siding, and not square foot of wall. The question is, how many square feet of siding do you need? At least square feet is a little easier to calculate.


Building Phase  >  Input please. Building with ICF is not possible?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/25/2006

Let me get some thoughts down here:

1) The window to the right of the front door, second story. Are you going to have enough header space above the window using ICF? This looks to be minimal height, and depending on your roofing framing choices, may be difficult. 

2) My ICF subcontractor uses corner windows all the time without corner supports. I would think the look with your corner windows would be much cleaner if they wrapped around the corner with no center supports. Since your ICF needs considerable detail anyway, this is something you may want to think about. However you are also limited as to the size of the window when you do it this way, although the limits are greater with ICF than they are with stick construction.

3) I wouldn't think the different roof heights would be much problem, as long as the first floor supporting walls and the second floor supporting walls line up. Think of ICF as Lego blocks, and how you would put them together, you just stack. You don't have to stack all of your Lego blocks the same height; this is no different than ICF. For the flat roof portions, no big deal, just stack that wall higher. My architect drew the plans showing each level of ICF block (my plans are nowhere near as complex as yours), if you have this level of detail it shouldn't be hard for your ICF subcontractor to identify how to stack and brace it.

4) What are you using for your roof framing? For the flat roof and slightly sloped portions, have you looked into SPEEDFLOOR or Hambro? I haven't used either one (I considered SPEEDFLOOR for my house), but it would appear on the surface that a floor system such as these would work well for your flat roof sections. Given your styling (I really like it ;-), I would consider leaving the flooring system exposed from underneath if using either of these systems(not using sheetrock finish).

5) Your ICF subcontractor isn't going to like your arched roof section. Depending on your roof framing here, I would stack the block, mark the arch, and hit it with a reciprocating saw. You need to provide a masonry-based anchoring system cast into the ICF here to secure your roof framing. I would do the same for the sloped sections, stack the ICF higher, use a chalk line to mark your cut, and a reciprocating saw to finish to final height, and then fill as typical. Your rebar placement within the ICF block becomes a bit more of a challenge doing it this way, but I don't see that as insurmountable.

6) You must not get much rain and obviously no snow load. The flat roofs don't bother me, but the roof over the garage will drain back into your house. I like all drainage to go toward the perimeter, but on your house the aesthetics simply wouldn't be as pleasing to pitch that roof the other way.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/25/2006

If some walls don't have anything to rest on below, that will certainly pose a challenge for ICF. One of the first premises of ICF design is that all exterior walls need to line up to form a continuous path to the footers. For some reason, subcontractors don't like to construct suspended concrete walls.

However, my ICF subcontractor Dean, who is my friend, designed his house (actually his ex-wife's house now), with the second story walls not matching up to the first story walls. He has a suspended ICF wall on the second story with roof load, that is completely open underneath. This was done for the sole purpose of dispelling the common myth that ICF walls need to line up.

The suspended wall is designed as a concrete header/beam, bearing on each end. The roof load is evenly distributed across this header/beam at the top. The floor load for the second story is evenly distributed across this beam at the bottom. Obviously the two walls supporting this concrete header/beam are reinforced for the extra point load as well. You won't find this in the IRC2000 code book (standard used at the time he built his house), nor the more recent IRC2003. It definitely takes engineering to back this up. I wish I would have been there to watch the pour, as I imagine underneath the suspended concrete wall was some considerable bracing to support the weight of the wet concrete, not to mention the shock of dropping it from the top of the wall as it was filled with a pump. It has a pretty good amount of steel in this header/beam, but given the depth of the beam (a full story), it isn't as much as you might think.

I saw a website for an Amvic house that was under construction when Hurricane Katrina hit, the house was elevated on piers, the ICF did not bear directly on walls below on that house either. Do a search for "Sundberg and Katrina" and you will find information, although much of it is the same as nbnnews.com/CHBC. This was designed by a structural engineer, and he uses beam walls as well.

You can do it, and it isn't as difficult as most ICF subcontractors would lead you to believe. However most don't have experience doing it, and you will pay extra for their learning curve.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/25/2006

As an O-B, I was inexperienced doing residential construction work. However I also know that more subcontractors and more trades leads to more problems for things to go wrong between the trades, mostly due to miscommunication.

Anytime you start combining systems that the subcontractors are not used to combining, you introduce uncertainty. Combining SIPs with ICF, and you introduce uncertainty to both subcontractors, especially on your house where they will be working side-by-side, and they have never done this before (the HVAC tech is used to working beside plumbers and electricians, the ICF subcontractor is not used to a boom truck being on-site lifting SIP into place). This is why ICF subcontractors (around here anyway) like to bring their own excavators and pour their own footings - less uncertainty for them. This is also one reason I have an ICF garage. Why bring in a carpenter to frame the garage when the ICF crew is already on site (and that it was a cost savings is an extra bonus).

The other item I found was that if you start breaking jobs up too small, you get less interest. Would your SIP subcontractor rather undertake an entire SIP house, or would they rather undertake a minor supporting role? I would rather deal with less subcontractors, and larger chunks for each one. O-B is challenging enough, less subcontractors to worry about makes your job simpler. I would rather have a more complex job that can be completed by one trade, even if that means less than ideal use of ICFs or SIPs, just to eliminate an entire subcontractor in a small role.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/26/2006

As I was thinking about this, is your architect aware of your desire to use ICF construction? If so, and if he provides a design that isn't conducive to ICF construction he isn't really providing the services you need. I had a difficult time finding an architect who had experience with ICF. It isn't that difficult to work with or design to, but there are certain things commonly done with sticks that simply should not be attempted with ICF.

I would like to see some of the interior renderings of your house, please post some more pictures.


Planning Phase  >  Economical Easy Plans
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/4/2004

The best thing to do in this case is to find a local architect or designer you want to work with and let them know your expectations for the design. I explained to the architect that I had a good DIY project background, but wanted enough information on the plans so that anyone could build it without a code book (how many trades carry code books in their trucks? How many actually refer to them? How many O-Bs even know what code requirements are?). I didn't want to rely on the code official for all inspections, as I intend to be on-site daily.

As a trade-off, I told the architect to not spend time on finishes or the "how things look" stuff as I could do this myself. My 90% plans have considerable "how it goes together" construction detail and not very much "how it should look" design detail. It helped that my architect had been involved in many low-income infill-type house designs, so he also knew how to design houses economical to construct.


Construction Bargain Strategies  >  NovaBrik
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 8/31/2009

If you are going to use Lowe's for a large purchase, don't forget your coupon. I used to get mine from Freeroms - freeroms.com/lowes_printed_coupon, but there are certainly other sources. I have no affiliation with this source, I just used it routinely and never had problems with the coupons I received.


Construction Bargain Strategies  >  Wall Insulation Options and Performance
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 8/14/2008

I know someone that built a dual-wall system using 2x4s and fiberglass insulation. What he didn’t do was leave airspace between the two walls; he filled the entire cavity with fiberglass. More importantly, he staggered the stud locations on the inner wall to eliminate the thermal ghosting you get with any framed wall construction. Those of you that think that thermal ghosting doesn’t exist are sadly mistaken. Those of you that fill that cavity with Icynene or other foam also get that thermal ghosting, despite what you may have been led to believe. Anyway the person I know would identify substantial benefit. Whether it is worth the increased cost, or more importantly whether that increased cost is better spent elsewhere, is up to you to decide.

One thing I would recommend is looking at subcontracting your insulation, I found I could hire it installed for less than the price of insulation I could buy through my normal suppliers. Further I found that upgrading my attic from R-30 (standard) to R-50 was negligible increased cost, leading me to believe that this is truly cheap material with substantial markup for profit, and that the truly high volume users don't pay the same price as I was being quoted.

Now then what you haven’t included is the additional cost from installing nonstandard door depths and window depths. If you look to other building methods that use nonstandard framing members and thick walls (log cabins, ICF) you will find solutions to this problem. More importantly, you will find opportunities that don’t necessarily increase cost but look very nice with thicker walls. I have attached photos of a window detail that is easy to figure out the framing work to accomplish (this was an ICF install here, but very clean way to take advantage of a thick wall nonetheless):


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 8/14/2008

The question I have here is what would a more traditional air-to-air heat pump cost? What is the SEER of this more traditional method? What is the SEER of the geothermal? How much monthly operating costs do you expect to save? What is your acceptable return on investment? It is only with these numbers that one can calculate whether the additional investment in geothermal is worthwhile. I know for what I paid for HVAC for a similar sized house in your environment (Lees Summit is not very far away ;-), that there was no way I would have a payback on that additional investment.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 8/14/2008

I’ll throw some real data on here just to make this more fun (I have previously posted this in the green building forum). I have ~4,000 s.f. in my envelope, ICF walls, R-50 roof insulation, light gray (Tamko Pewter) shingles, 3-ton 12 SEER A/C (geothermal is rated using EER which is a different rating) which is less efficient than anything you are allowed to buy today, 90+ variable-speed gas furnace, low-E windows but without Argon fill. My A-coil is slightly oversized, and coupled with the variable-speed furnace I get an effective 13 SEER. I am in the same environment you are, as Smithville and Lees Summit are both basically Kansas City (and I use weather data from the Kansas City International Airport, as you would as well). We are also similar sized in square footage, so this should be an apples-to-apples type comparison. That said, three tons of AC was way too small according to everyone (except Manual J), every tech wanted to install at least four tons; my ICF subcontractor thought four tons might work, and a mechanical engineer I hired to do independent calculations recommended minimum four tons as well. In actuality, three tons is too large, but no one knew how to calculate the thermal mass effects of an ICF house.

 

With over two years of data and pulling out baseline data, my HVAC costs are ~$50/month. I use my summer natural gas usage as baseline, as while I don’t need heat I do need hot water and clothes dryer (truthfully I will use more gas to heat water in the wintertime as incoming water temperatures are lower, but I can’t easily quantify that and it doesn’t matter anyway). I use winter electrical as my baseline as my air conditioning isn’t running. I run a ventilating dehumidifier almost year round, so I include this in my baseline and not my HVAC costs. This is fair, because you still need ventilation regardless of whichever HVAC system you choose (and I maintain a ventilating dehumidifier better suits our needs than an ERV for both ventilation and independent humidity control). Natural gas is generally cheaper than electricity for an equivalent energy usage, but including the monthly fee I pay to say I am a natural gas customer (which over the course of over two years equates to about 49% of the total I paid to Missouri Gas Energy, $0.49 of every dollar I send the gas company goes toward administrative cost and not natural gas cost!!!) and converting back to 100% electric, natural gas is still a wash with the $0.10/kWh +/- I pay Aquila.

 

So let's speculate that your geothermal HVAC is double the efficiency as mine, thereby reducing my HVAC costs by half. So you would save ~$25/month, or $300/year. My capital costs two years ago are roughly 25% of your geothermal bids. This is the reason I don’t have geothermal. It is also why I don’t have a $1,700 ERV (this is what it cost when I built, perhaps more today); energy recovery coupled with ventilation simply wouldn’t pay for itself either.

 

As I have said before, and will continue to say, you get more bang-for-the-buck by putting your money into building the box to minimize energy usage than you do with upgrading your HVAC efficiency coupled with standard construction. Icynene is definitely an upgrade, but coupling that upgrade cost with some of your geothermal HVAC costs easily gets you into ICF, and ICF is definitely superior. As I understand the new KCMO code, housewrap isn't required for ICF either.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 8/15/2008

I apologize for the thread creep, this really should get moved over to the green building forum, and it is especially disturbing that as I moderator I am contributing to it. But here goes…

 

For my next house (my SO would kill me if she heard me say that ;-), I figure I can get very close to zero energy. Passive solar heating is a no-brainer, and there is enough information to perform good design here. However you are constrained by your building location here so it is not for everyone. Solar DHW has great ROI, however solar hot water heat doesn’t because you only use this capacity part of the year and the rest of the time your equipment is idle (this is equipment I pay for, I like it to work for me). However radiant heating is very nice, and would work well with solar hot water.

 

And here is where it gets interesting. In the summertime, what if you run your pumps for your solar hot water collectors at night, do you get night-sky radiant cooling? Some of the data in arid climates is showing you can get that water 10C below ambient (I am not in an arid climate, I would be happy with 50% of that). So what does this do for you? Well how about using your temporarily used very large hot water tank supporting heat only during the wintertime to store chilled water in the summertime, and using your radiant heating tubes to flow this chilled water through your slab. Radiant floor cooling is not ideal, but it would seem that 60F water running through that concrete mass might be about the limits of how cool you want that floor anyway, which should be right at what I might achieve if I get 50% of the benefit of an arid climate. Now then the equipment investment to support solar hot water heat is working for me twice as much, increasing my ROI. Of course air conditioning is also humidity control, and this does nothing for that (but I have that covered with my ventilating dehumidifier ;-).

 

The next question is would this provide sufficient cooling? I built my garage out of ICF as well (for me, ICF walls were actually cheaper than stick so ICF decision was a no brainer). My garage slab is thermally isolated (I turn my own wrenches), it has windows but no HVAC. Anyway I track the garage temperature daily first thing in the morning (I figure this is the only way I might be able to calculate the thermal mass effects of ICF). In the hottest part of summer, it never gets above ~84F (until you open the garage doors and do a quick air exchange with hot air, but it will ultimately stabilize again in the low 80s). In the cold of winter, it never gets below ~45F. What this tells me is I only need my AC to cool 12F to get down to acceptable 72F, provided I accept the lag time caused by uncontrolled ventilation. In a higher-volume structure with air circulation, the lag time shouldn’t be as great as a garage. 60F water running through the concrete slab might just do that for me.

 

I have also performed some experiments on my house by turning the AC off (actually it is part of trying to make an oversize AC work more efficiently). On the hottest days (temperature delta of 25-30F), if I turn my AC completely off my house temperature increases ~1F/hour, so I actually let my temperature rise to 78F before cycling my AC system on. My AC system will cool 2F/hour, but more importantly by running longer is not short-cycling and provides better humidity control. Again exactly how much cooling does a high-mass house need and could you get this from a basically “free” source (once you pay for the equipment, and of course your pumps take electricity).

 

To further increase ROI, what if during spring and fall when I don’t need much if any HVAC, I use this solar heating (or cooling) capacity to start preheating (or precooling) the ICF walls? This thermal mass is not directly accessible as it is insulated, and you would lose ~50% as half goes inside and half goes outside, but your only cost to do this is pumping cost. As might not surprise you, I track my natural gas usage and can very accurately predict it based on heating degree days. Winter 2006, from November 13 through April 16, I had 4,453 heating degree days, and I can exactly correlate natural gas usage to heating degree days until February 14, when my natural gas usage starts to increase relative to heating degree days. Winter 2007, from November 13 through April 15, I had 4,951 heating degree days, and again I can correlate natural gas usage to heating degree days until late January when natural gas usage again increases relative to heating degree days. I attribute this to thermal mass effects of ICF, and in both winters the effect starts as I get past 3,300 heating degree days and continues to trend upwards as long as I need heat.

 

If that doesn’t work, there is always waste-heat adsorption chilling equipment, and I figure solar hot water heating equipment in the summertime may provide enough “waste” heat to generate a sufficient amount of water chilled to a much lower temperature. The problem is this is industrial equipment, and not sized small enough for residential application (which doesn’t mean the technology isn’t coming). There used to be residential natural gas absorption chilling using ammonia, but obviously that technology didn’t work out. I actually have a friend who has an Arkla unit, probably the only one that has ever operated trouble free and it has been operating 30+ years now. He also has a never installed, brand new, still in the crate, Arkla replacement unit (these things haven’t been made in decades and he figures he might need service parts some day).

 

Now that I have eliminated my largest use of electricity, a relatively small PV system should do the trick. This also has the added benefit of feeding power to the utility during peak times while I will be using power during non-peak times.

 

Please refrain from any more disparaging remarks about desk jockeys.  ;-).


Planning Phase  >  Plans and Materials List
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/13/2007

Go to the library and look for the Means Manual for Residential Construction. It is a good starting point to determine house costs, and fairly accurate as long as you put in accurate information. Follow the process, and you will get a pretty good idea what it costs to build.

It starts with basic rectangle and square footage costs, and then you can add/subtract based on level of finish, level of trim, more complex shapes (more corners), different roofing materials, etc. From a starting point, it will help you narrow down quickly what you can and cannot afford, and then you can target your plans accordingly based on either your champagne or beer budget, and again based on if you like to drink vintage champagne from France, or if a Sparkler from CA is adequate. A lot of information in that one manual. Most libraries will have a copy.


Miscellaneous  >  HardiPlank or HardiPanel (stucco finish)?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/22/2005

If you are trying to go with a spanish style, you will see the seams at the panels.  My Hardie supplier identified that the pattern won't line up from one panel to the next.  On the vertical wood grain panels, there are natural "seams" so you won't mind the appearance.  If you want a board and batten look to the stucco, the seams won't matter.  Based on this, I decided to go with hardieplank.


Planning Phase  >  Stuck In Plan Land
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/11/2006

I would get an architect, but then if you search here you will notice I hold my architect in very high regard. However I would negotiate on what services you need from them, and the fees. I found may architects do the plans, assist with subcontractor selection, site inspections, etc. right up until the house is complete. I have an engineering background; I didn't want this level of service. I didn't even want too much detail on my plans, as subcontractors tend to get a little nervous if they know engineers or architects are looking over their shoulder (they didn't know my background).

I asked the architect to put only enough detail on my plans that you could build it without a code book (most subcontractors don't have these on their trucks). I also asked him to develop plans only, no follow-up construction inspections, etc. that he can normally provide. Once we got his level of service down, his prices were actually very competitive. Also given some things he incorporated to ensure ease of construction, I am almost certain that he saved me more money than I paid him in our negotiated fee.

We looked at thousands of sample plans, and had a pretty good plan drawn up ourselves that would have worked well, but the architect thinks in terms of space and proportion and was able to develop a house plan that was better than anything I could have come up with on my own.


Construction Bargain Strategies  >  Pouring your own ICF walls
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/22/2005

I would say this is doable based on the following items to consider:

1) How much technical support are you getting from your ICF supplier? I asked for several references in different stages of building from the ICF supplier I was considering. I called these references (all owner-builders), volunteered to provide free labor to use the system, and noticed that Blaine (the salesman) was at every pour, getting his hands dirty. I realized two things, service after the sale from the supplier, learning ICF on someone else's project, and hopefully gaining points for favors I could call in later.

2) Does your supplier have an ICF installation class? I would take this no matter what supplier you end up using, or even if you are considering subcontracting it out. You learn a lot in the class, if you buy ICF from the supplier they will credit the class costs on your first order. I ended up using a different supplier, but the class was still worth every penny and then some. If I had some labor I knew I would be using for pump day, I would pay for the class for them too.

3) Does your supplier provide bracing? ICF needs a lot of bracing, you need to have a source for it somewhere.

4) Does your ICF supplier provide contacts for pump companies, concrete ready-mix suppliers, etc.? Subcontractors usually have these contacts worked out, but your ICF supplier may have these as well.

5) Around here, some of the Habitat for Humanity organizations use ICF. The block is stacked by volunteer labor, but they use experienced people to pump the block. Do you have a similar opportunity? Learning from professionals on someone else's house is worthwhile.

In the end, I subcontracted the ICF portion of my house. This was not because I didn't think I could do it myself (I knew I could, I had experience on other houses), but simply based on cost and limited use of my resources. Your time is a limited resource; you need to balance the cost savings with the time commitment to determine if your time is better suited doing something else.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/8/2005

The ECO-Blocks make up pretty quickly, although very tedious. I would hire some day labor from the local labor shop and have them do it. It will be the best money spent on your project.

I would argue that the bracing is less important for the block strength now, and more important to keep your walls straight.  I have seen the pros cut their bracing down to every 8' or so, but the difficulty with keeping your wall straight with minimal bracing increases exponentially. Straight walls more than offset the additional labor in the bracing.


Construction Bargain Strategies  >  Flipping a plan
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/17/2005

Mirror image changes nothing structurally.  Have you asked your permit department if they will take a copy of the mirror image, a copy of the plot plan from the surveyor, and a copy of the regular plan so they can read the structural details?  I wouldn't spend a bunch of money without asking these questions from your permitting official first, some can be quite reasonable.


Legal Issues  >  Insurance desperation
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/9/2005

I have Farmer's Insurance for my current homeowners policy.  They didn't blink an eye when I asked for Builder's Risk.  I don't recall if I told them I was a contractor or not (I have GC license - definitely a positive on many factors), but it was very clear that I am doing much of the work myself.  Builder's Risk has no application to whoever is doing the work, because if you are working on the structure it offers you no protection anyway.

However, are you talking Builder's Risk or some sort of Workers' Compensation?  Before I can have any employees, I have to have a workers' compensation policy on me - and Workers' Comp is very expensive for a GC with no previous construction experience.  I don't have employees anyway, just perhaps the way you are presenting the information to insurance companies maybe they think this is what you are asking for?


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/9/2005

Basically I called my agent (John) and told him I needed a Builder's Risk Policy for a new house I was constructing.  I provided a set of blueprints, but this was more of a formality as I think John was simply interested in what I was doing (note here that John comes over to my house and drinks beer on occassion, sometimes with his spouse and family, there is more than just a business relationship).

John provided a price and faxed the information to the bank.  I write a check and give it to John.  John filled out all of the paperwork, I signed it.  I am happy, bank is happy, John is happy, we have insurance.  That is the process I followed, and I didn't leave any details out.  This is probably not much help, but this is also why I went through my existing insurance agent (although I also shopped around to make sure he was giving me a fair price).


Planning Phase  >  PEX Manifolds?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 8/14/2009

All of you with no sheetrock in the mechanical rooms at first struck me as odd, as I had to sheetrock my mechanical room. It took me awhile to think of if, I have ICF, no exposed polystyrene in the finished building. Sheetrock really does dress up your mechanical room.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 11/13/2009

I thought I would share my recent experience (from yesterday) for those of you with PEX manifolds like the one Faye shared in her post. I have two of these very same manifolds (Vanguard). Anyway, yesterday I went into my mechanical room (not really something I do very often unless I am changing a furnace filter or something, out of sight - out of mind and all that). Anyway I noticed that one of my joints was leaking at the manifold, thankfully not very much and not for very long (I estimate less than a couple of days based on water on the floor and how quickly it dried up after the leak was fixed). Anyway I turned that leg off (the joys of home-run plumbing), drained that one line, and then reconnected the compression fitting. Turned it back on, and no leak. However, I took the opportunity to check the rest of my connections, and I found every one of my cold-water-side connections needed a bit of snugging up (1/8-1/4 turn, one needed 1/2 turn). Now only one of these leaked, but all were a bit loose. When I checked the hot-water side, they were all tight.

Those of you with PEX might want to check on these after a year or two, just to make sure your compression connections at the manifold stay tight. At the other end (at the fixtures), I used crimp connectors and am not worried about leakage.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 11/14/2009

Yes, I am lucky I caught it in a short period of time. However my mechanical room has a floor drain, so all would not be lost as long as that drain could keep up. I would guess a wholesale leak out of a 1/2" port could have gotten more exciting. Anyway this is why I was sharing, so others could learn from this and perhaps check periodically.

That said, I used all 1/2" water lines. I kept my runs short to minimize lag time to get hot water, and with a fire-on-demand hot water heater I have an additional three seconds from when I pull hot until my heater fires, thus further contributing to the delay. However compared to my old house, it is still right with what I lived with previously (short runs). I used 1/2" lines because I wanted to fill big draws (washing machine, air tub), and thus purchased a manifold with all 1/2" ports (as opposed to all 3/8" ports). And since I had 1/2" ports, and I used all 1/2" tubing, I purchased a larger quantity and thus had lower cost/linear foot for 1/2" and thus a cost savings. In the realm of living with this, I don't think 1/2" is really necessary for most fixtures. I doubt I would really care if the washer takes an extra couple of minutes to fill, and the air tub is rarely used (and your idea of running double lines here accomplishes a similar task). I would run what your plumbing supplier has on the shelf, because they will also stock fittings for what they sell. For me, that was 1/2" manifolds; 3/8" manifolds were special order.

My leak was at the threaded connection between the PEX and the manifold itself, I haven't seen any other way for the Vanguard MANABLOC manifolds to connect here, I don't think crimp is an option. I have seen other options where the manifolds are all crimp connectors, though. That's why I referred to Faye's picture for reference and clarification, as this is the same manifold I am using. Those of you with Uponor or Wirsbo probably won't have this issue.

And while I am home-run to two different manifolds (in two different locations, to keep my runs short), if I had a larger house, I think I would home-run to rooms vs. individual fixtures (for example, I have eleven [11] individual lines running to my master bathroom - two shower heads, two lavatories, air tub, water closet, that's a lot of spaghetti) and then run mini-manifolds in those rooms to further distribute. For example, instead of 11 lines to my master bath, I would run one hot and one cold, and then smaller hot and cold manifolds to further distribute to individual fixtures. This way I shave (and get hot water at the lavatory) and then instantly get hot at the shower. Right now I have a lag time with each fixture even when I use them in relatively quick sequence. My house is really not large enough to go this hybrid route, but something others may wish to think about. Mini-manifold distribution like this would also make easy recirculation based on occupancy sensors in these rooms, thus further reducing lag time to nothing (walk in, occupancy sensor trips recirc. pump to come on, instant hot at the faucet - and that, my friends, is luxury that most will never experience, and one small detail that you would live, enjoy, and smile daily for a minor cost increase).


House Features  >  What unique items did you put into your house?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/10/2008

Welcome Phil, this is really a wide-open question without an easy answer; every house is unique. Perhaps if you share a floorplan or something, we could help. I will start and toss out an easy one. In your kitchen have your framing contractor inset your refrigerator into the wall - you won't mistake it for a Sub-Zero built-in, but with refrigerator depths what they are, it is something that will make you smile every day, especially those days you are at other people's houses and realize they missed a detail so easy and free. I have many ideas (many I incorporated myself), but I need some help from you here too.


Building Phase  >  Insulating basement ceiling - your recommendations
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 11/23/2009

Construction techniques do indeed vary depending on environment. I would suggest that JLC is a pretty reputable source.


Planning Phase  >  Want to do ICF in Ellicott City, MD
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/3/2008

I paid a lot less for an architect, I could have paid more for a designer. It depends on the services you need. As Jon identified, if you are comfortable with your floorplans and elevations, you could just pay for a professional engineer. Actually in my locality, I don't need any stamps so could get by with home-drawn blueprints as long as it was all in compliance with the IRC tables. Truss designers provide their own engineering.

I would look at Speedfloor, I have no direct experience with it though (I do have the design manual and span tables, but it looks like Jon beat me to that). I would also look at AmDeck if you have a local Amvic distributor. Talking to my local representative (I used Amvic ICF, my build site is used in their advertising material, even though I am complete I maintain ongoing relationships with some of the people I used) they can easily get spans of 35' and are only using shoring at the midway point (17-18'), this is much less than typical shoring needed for ICF floors.  I can't compare the costs between the two, only that the source exists. ICF floors (and Speedfloor too) will require engineering, and in my locale would require an engineer's stamp (the reinforcing steel schedules or span tables are not in the IRC) to issue a building permit.

Sorry to hijack your thread, but here goes ;-). Jon how did you like Speedfloor? What concrete mix did you use, I was thinking something with some fibers and minimal water to reduce shrinkage so that I could actually etch the floor so the concrete would be my finish floor (either stained later or with color mixed in at the plant)? You have pretty short spans, do you know where you are on the span tables? Are the floors rock-solid? Did you have a local supplier, or deal you deal with speedfloorusa.com (or formerly ARIT)?


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/3/2008

Let me start by suggesting if you are interested in ICF construction, your supplier will have a one to two-day training course. This is worth your time tenfold. If the PolySteel distributor doesn't offer the course, take it from another supplier, as ICFs are similar enough that the installer's course from one supplier will translate directly to another supplier. Use the search tool; there have been some informative discussions on ICF. Also greenbuildingtalk.com is frequented by a number of professional ICF contractors and installers, a wealth of information over there and a great search capability.

I was under the impression that many (most?) ICF products could be obtained with borate treatment. This serves not only as a termite issue (and if I had an issue with termites, I would get my termite guy out there and spray under slab, spray prior to backfill, and not just rely on borate) but IIRC, borates also discourage mold growth - which is only a problem if you don't design your moisture issues correctly.

As to thermal mass, the only data I have seen was from John in Colorado, and he hasn't posted here heavily since circa 2005. He checks in occasionally and was a great asset, but obviously moved on to other things. He had temperature sensors throughout his house... I know there is debate on this topic, but as someone who lives in a passive solar ICF house, I can tell you the thermal mass is there, and it does impact the interior, unfortunately there is no way to model it ;-(. How much mass is there on the south face of your house? Understand that this mass is available, only that it is covered by R-10 insulation (EPS ~R-5/inch) so is not as accessible as uncovered concrete would be - this serves to slow the whole system but not eliminate the effects entirely. Understand that 50% of this benefit goes outside, but if you are putting on thicker exterior foam then you can reduce this percentage.

As to spray foam on the underside of the floors, spray foam is expensive and its greatest benefit is sealing the envelope. If sealing isn't necessary (and inside your envelope it should not be), spray foam is probably a lot of extra expenditure for little commensurate benefit.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/4/2008

See: ownerbuilderbook.com/forum/messages.aspx?ID=2364 - this thread, "Thermal Mass Example" is over in the Green Building forum. Notice there is also discussion about a system to move the thermal mass to the interior. While ideal, and you could simply use plaster to finish your interior walls (and over outside of Baltimore you probably have plasterers to choose from as a trade, while it looks a lot like sheetrock, they are two different trades; I haven't figured out why). My issues with this stem from getting your electrician in there early and operating completely differently by running conduit in the walls and preplanning your electrical. ICF is far enough outside most subs comfortability (read that you get surcharged for the PIA Factor), that pushing this envelope further wasn't something I wanted to do.

I have discussed this issue with my department of natural resources energy specialist, and he tends to agree on the thermal mass benefits. At one point we discussed collaboration to try to figure out a better way to capture and predict/model but we have never really gotten this issue off the ground.

I have posted a lot on ICF, some on passive solar, and my build is pretty well documented on this site. The easy way to get a compendium on any single users posts is to look at the left side of a post on any topic with a user you think is interesting, look at the number of posts that user has made, and click on that - it leads you to a complete compendium of that user's posts. From that you can actually go back to the topics of interest. The compendium is a great kicking-off point to get to some really interesting topics, which in turn gets you to some really interesting compendiums. For thermal mass and ICF issues, I would definitely get the John M compendium, or as a shortcut here - ownerbuilderbook.com/forum/user.aspx?ID=5854.


Miscellaneous  >  Roofer Dilemma
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/21/2009

This sounds like it worked out well for you. Remember that coupon may be advertising for your roofing contractor. I have sometimes found with coupons that the underlying job price is higher, and with the coupon then you really get "normal" price. You may have taken "normal" price and then applied a coupon.

Re-roof jobs tend to be higher profit margin and/or insurance jobs, and insurance pays better than new construction. With re-roof jobs, the contractor gets to educate the consumer on the value of better flashing, better underlayment, etc., all of which equates to more "investment" and higher profit margin. On new roof for a GC, all of this is wasted. I have a friend of mine that is replacing a roof on a six year old house, this should have been a 30-year roof. When they got up there for the tearoff, no underlayment, flashing, etc. A completely substandard job in every aspect.

For me, I found it very difficult to find a roofer for new construction, I was calling out of the yellow pages. Finally I asked why they weren't interested in new construction since it should be easier than re-roofing and tearoffs, they explained because GCs are willing to sacrifice quality for price, and they couldn't compete on price and weren't willing to sacrifice quality. I then identified that I was O-B, I was building this house for myself because I wasn't interested in sacrificing price for quality like so many GCs, and then I got interested roofers. I guess the roofers GCs use don't advertise in the yellow pages?


Miscellaneous  >  HVAC Sizing Way Off !!!!
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/6/2006

Spray foam insulation is your variable. Find some contractors familiar with ICF or other tight construction to run the calculations. At a minimum, find a contractor that fundamentally understands Manual J. Also consider hiring a mechanical engineer or other specialist who fundamentally understands Manual J. This shouldn't be more than a couple of hundred dollars and you will more than save this amount on your install.

I found that many HVAC contractors who use Manual J don't fundamentally understand the variables, leading to garbage in-garbage out. Anyone can use a computer and plug numbers into a black box and get results, the question is in the validity of the results. I found the best Manual J I got from HVAC subcontractors were when they independently had the analysis done (the techs bidding the job didn't run the Manual J themselves). They either had one person in their shop who just did Manual J, or they used a service that just did the calculations for them.

I commend you for learning about your needs, running the evaluations yourself, and then asking questions when the results come back different from expected to learn why - this is one reason O-B houses are superior.

Richard from Valparasio will probably weigh in on this subject due to his experience in HVAC. I would expect his advice to be a great next direction as he is directly experienced here.


Planning Phase  >  House Details per Chapt 6 of OBB?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/16/2007

Yes, or that different-depth toilet that was selected. Engineers don't like field changes performed by the trades; it makes them very uncivilized (and as a civil engineer, I really like to stay civil).


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/16/2007

The intent of this chapter of the book is to think through the house in sufficient detail to get accurate bids from subcontractors and avoid rework and change orders. Rework costs money, potentially a significant amount. Change orders are a potentially significant source of frustration for everyone involved. Trades don’t like them, who likes to do work multiple times because expectations were not clear (think about your professional career, how do you like it?), so trades will charge a frustration factor into change-order prices. You don’t like them, because the increase in cost is something that you have not budgeted for. And this is a potential significant cost increase, one that can be avoided through your 1,000+ hours of planning that Mark espouses in his book.

 

Now looking at your spreadsheet of expectations; I notice that many of the items are things that should be included on your plans. However, many significant details that normally wouldn’t be included on your plans and need to be in your story of a room are missing.

 

To illustrate the level of detail necessary, let me pick a seemingly simple room you haven’t completed your spreadsheet for. I will pick a full bathroom, not master bathroom; typical level of finish with a bathtub, toilet, and sink. A relatively small room we have all seen hundreds of times, if not more. These only encompass roughly 50 square feet, how hard can it be after all?

 

Starting with your bathtub, do you have a left-hand tub or a right-hand tub? Now this will actually be shown on your plans, but do you want a cast-iron tub, a fiberglass tub, or a steel tub? You need to know this because while fiberglass tubs are all built to a standard dimension, and cast-iron tubs are all built to a standard dimension, they are not the same dimension, as fiberglass tubs are wider than cast-iron tubs. Why does this matter? It affects your drain plumbing. If you are building this in a basement or slab-on-grade, this plumbing is put in before the concrete gets there, and changing this plumbing later requires a jackhammer (read lots of time and frustration for the plumber plus tool rental equates to a big unbudgeted bill for you). If this is installed on an above-grade framed floor, your framer needs to know because you do not want a floor joist directly where your drain belongs. And if you are using an engineered floor system (TJI or open-web joists), your engineer needs to know as well, as they need to know where they cannot put a floor support because a drain is needed. Engineers take a dim view of field modification of their engineered system, and if a plumber hacks a floor joist or engineered system to get his drain where you want it, it won’t pass your framing inspection. And what does this mean for you? Rework and additional cost that could have been easily avoided simply by knowing where that drain has to be, accurately.

 

OK now, we have a tub. Is this tub going to be mostly shower use, or do you intend to use it for baths as well? I ask this because on a standard 60” rough-in dimension for a full bathroom, if it gets significant use as a bath, I like to have the bath roughed-in at 61” so that the sheetrock can extend all the way to the floor surrounding the tub (normal sheetrock installation is to a lip at the top of the tub), this allows for insulation and the additional sheetrock really helps hold heat in the tub, which is nice for whoever is bathing. However if this is just a guest bath not intended for frequent use, I would forgo this minor detail (which isn’t standard, so your sheetrockers better know what you intend as well, as this moves you drains a bit so your plumber needs to know, too).

 

For your tub, what do you intend to use as a surround? If this is a fiberglass tub, is it a one-piece insert? If so, this answered your question. Do you intend to tile your surround? You need to know this, because your plumber needs to mount the shower valve so it will be flush with the finished wall. Tiled wall has different thickness depending on your tile selection, and fiberglass is different yet. Now if your plumber is using PEX, remounting this is not too much trouble, but if it is all soldered together (copper) then it takes more work. Your plumber will charge less if he only has to install it once. This is also the time to think about the height of the showerhead. Are you extremely tall, does it really bug you to stoop to wash your hair? For a child’s bathroom, maybe this isn’t a problem, but this is one of my pet peeves when I go to hotels - having to stoop down to get my head under the shower. You get one chance to do it right the first time; raising it later costs extra and it is avoidable cost.

 

However your sheetrocker also needs to know some details here, as well. Is this a guest bath for intermittent use, if so perhaps greenboard (marine-grade sheetrock) is adequate? For daily use, you may want to upgrade to tile backer board such as Hardie tile backer. You better specify this. And of course your tile layer needs to know; again if this bath is for intermittent use, perhaps mastic is good enough, for daily use I would want a thinset tile install. However if your tile layer likes to use the Schluter Kerdi system, then this really should be installed over sheetrock, and tile backer is an unnecessary expense for your sheetrocker. For more information here, just put any of these terms into the search tool at johnbridge.com and learn more. Your tile layer will also be interested in if this is primarily a bathtub, or primarily a shower, as they will install the soap dishes at different heights depending on primary use.

 

And lastly for a bathtub, I always like to assume that the bathroom will be later upgraded for handicap accessibility, and it is better to install backing for such things as grab bars now than try to tear out finished tile walls later – your framer needs to know this.

 

OK, all this just for a bathtub, let's move to the toilet. Do you have a specific toilet picked out? I ask because toilets come in three different depths; the center line of the drain in relation to the back wall can be 10”, 12”, or 14” depending on toilet model. Standard is 12”, but again different models come in different depths. Without additional information, your plumber will use a 12” because this gets him the greatest chance of success, as you can almost always find a 12” toilet that fits your aesthetic needs. Again this matters to the framers because you don’t want a floor joist or key piece of your engineered floor system directly where your toilet needs to be. Or maybe you have your heart set on some obscure toilet that comes in a 10” size only; your plumber needs to know. Alternatively, perhaps you want a wall-mount toilet to make it easier to mop the floor, a nice clean look that is much more prevalent in commercial work, but possible in residential work. Your plumber needs to know this, but your framer needs to know as well, because now you are putting a significant moment on that wall it was never intended to take and needs reinforcement to make sure the toilet doesn’t come off the wall while someone is using it (think about the extra weight on the wall, not to mention the torque). Also if your plumber is supplying the toilet, is this available locally or is it special order? My Toto Drakes were on-the-shelf, but my Toto Pacifica was eight-week lead time, your plumber will want to know what your expectations are. The Toto Pacifica is a smooth-apron toilet; these don't mount to the floor the standard way. The plumber will charge extra to mount it, as they take more time. (For the record, I did all of my finish plumbing, and I had the painter, the finish carpenter, the cabinet installer, and basically a handful of other trades at the house that day; all of us had replaced toilets at one time or another, and yet none of us could figure out how to mount that Toto Pacifica. We all looked at it completely dumbfounded. I figured it out eventually and I could mount another one fairly quickly, but it is still not as easy as a standard mount).

 

Alright, now we have a bathtub, shower, and toilet, let's move to the sink. Are you going to use a pedestal sink? You need to know this, because this affects your plumber. Normally when they run water lines, they run along a wall stud, but with a pedestal sink they like to tuck those lines in much closer to the center line of the sink so they are not visible once the pedestal is installed. This also affects your framer, because pedestal sinks hang from the wall. You need to have reinforcing backing in there to support the sink (the pedestal itself is purely decoration and serves no other purpose). What height is your pedestal sink? The reinforcing needs to be at the appropriate level.

 

Now to finish plumbing. Do you want the capability to shut your water off at the fixture in case you get a leak? Or do you want to run to the basement to shut off the water supply to the house to replace a leaky faucet? And what if your lifetime warranty faucet needs to go back to the factory for a six-week rebuild (this is why for lifetime-warranty faucets the warranty is useless, but I digress). I like vales at each faucet; your plumber needs to know this. And further if you want valves, do you want the normal righty-tighty, lefty-loosie crank valves, or do you want those trick little quarter-turn specialties? I like the quarter turn valves; I found them to be under $4/each from the big box (one of the few items cheaper at the big box than the plumbing supplier).

 

If you are going to use a vanity, do you have the room for a standard-size vanity you can purchase off-the-shelf from a big box? Or do you have a custom size that will need to be made by your cabinetmaker? I do not know what standard sizes are available, as I used all custom cabinetry in my house and didn’t worry about such details; further coupled by the fact that I found custom cabinetry was cheaper than off-the-shelf cabinetry, so I didn’t worry about it. However, if you are going custom, at what height do you want your finished vanity? Children’s vanities are normally 30” above finished floor, and adult vanities are anywhere from 32-34” above finished floor. Are you exceptionally tall? Perhaps you want a vanity that is 36” above finished floor? Maybe you are short; either way, I wouldn’t get to far out of the expected range, as someday you will sell your house and you don’t want a noticeable “defect.” Your cabinetmaker isn’t going to care; they just need to know your expectations, as once your cabinet is made, further opportunities for customization have disappeared. I will assume for the sake of simplicity that your cabinetmaker is also providing your sink (mine did not, but could have).

 

However let's think about some details you might like in your vanity. Some people like to have the top drawer hold their hair dryer and curling iron; among other power tools, women tend to use these more than men. It is a nice clean install if you have power in that drawer, you pull the drawer out, use your styling tool, and when finished you push the drawer back in; very nice detail. However, this little detail automatically eliminates your standard big-box cabinetry and mandates a custom unit (but if you are custom anyway, your cabinetmaker isn’t going to care, as they simply make the top drawer to lesser depth). Now then, a tricky little detail like this requires your electrician to understand your expectations, and your code official is going to want to look closely too. What happens when you leave your curling iron on, push the drawer in, and it builds up heat all day long while you are at work? I’ll tell you what happens, you come home to a burnt house, how much damage is directly related to how quickly one of your nice neighbors noticed your house was on fire. The outlet should not be energized when the drawer is closed, which is why your electrician needs to know about this little detail, and your code official will scrutinize this little detail closely. However, this little detail doesn’t add very much additional cost, as long as everyone knows your expectations up front. Also understand that you can’t plug your rechargeable razor into the drawer, as the outlet is not energized when the drawer is closed, this is a limitation you must understand you get to live with.

 

We are making progress here. The next question is how are you going to ventilate the bathroom, and which trade provides the vent fan? Again, let's go shopping at the big-box home-improvement store. Notice the base-level Broan bath fan is ~$12; this is what you are going to get. However, notice that you can easily spend a couple hundred dollars if you want more capacity, more quiet, a combination heat/vent fan, or any of the above. Or perhaps you want a remote ventilator to eliminate the noise almost completely. Depending on what region you are in dictates who buys the fan in the first place. I have seen it where the HVAC contractor buys and installs the fan, and the electrician wires it. I have also seen where the electrician buy and installs the fan, and the HVAC tech comes back later to run the ductwork. And speaking of ductwork, where is this nice fan going to vent to? HVAC techs like to take them close to your roof vent and let them vent directly into the attic, although if you have a cold attic without sufficient ventilation, this will lead to icicles forming along your ridge; not a good thing for many reasons. Do you want it vented through the roof, truly the proper venting location? If so, this mandates a hole in your roof, including proper flashings, which means now this simple bathroom has also impacted your roofers. I like to vent out the soffits, although this is less than ideal, any shortcomings can be overcome with powerful vent fans. For the record, I used Panasonic vent fans, sized at least double code requirements, vented through the soffits, and extra ventilation for clearing humidity from bathing is very nice.

 

Which now brings me to lighting and switches. Do you want your vent fan operated on a timer, so you can leave the fan on after you leave and not worry about leaving it on all day and sucking your nicely heated and/or conditioned air right out of your house all day? This is a nice little detail, and it fits in your standard switch box, but your electrician is unlikely to have one of these little units on their truck. It is an easy retrofit, if you have a neutral in your switch box, but there is more than one way to wire your bathroom and your electrician doesn’t have to install a neutral in your switch box to meet code requirements. Depending on their normal method for wiring, they need to know this minor detail. If this all sounds like a foreign language to you, go ahead and have the electrician put the timer in as part of the finish work.

 

Keeping this at switches, one of my pet peeves with custom-level housing is varying locations of switches in relation to doors. They will all be at the same height, but I like them all to be at the same location relative to the door. Normally the electrician will put the switch box based on where the framer put a wall stud, but if the framer knows you want your switches a certain distance from your door they can make sure a wall stud is always at that location. This way, it becomes second nature in your house where your switches are, especially nice as you are fumbling around in the dark trying to use the restroom. And for switches, do you want that standard cheapo stuff, or do you like the decorator switches? And maybe you really like the no-exposed-fastener covers; it is cheaper to identify this now than to change your mind later.

 

Which brings us to lighting. Do you want your lighting on top of your mirror, in the center? Or perhaps you want a smaller, more decorative mirror with wall sconces on both sides? Or perhaps you want something different entirely. The problem is, your electrician needs to know, because these lights all mount to boxes, and the boxes go in before the sheetrock goes up. If you don’t know, your electrician can leave a fairly long length of wire looped through the studs and use what is called an “old work box” and cut them in later. However this is also a tricky little detail, as sheetrockers don’t like to bury non-terminated wiring and will likely pull this wiring out near its termination, leaving it exposed where you don’t want it. If this happens, push it back in the wall before the finishers get there and they will tape and finish it properly without the Romex exposed.

 

However, we also have a couple of questions relating to your backsplash for your sink. Are you going to tile that backsplash? The reason the electrician needs to know is because they have to mount the boxes so they are flush with the finished wall, and a tile wall is thicker than a sheetrock wall, so this affects mounting depth of the boxes. And perhaps you want a big mirror, and an outlet actually in the mirror (I have this as well). Not a hard detail to do, but now you have to involve your glazer so that they can properly cut the mirror, as well as provide the mirrored cover for your outlet.

 

And speaking of walls, what are you going to put on them? Are you going to tile the walls? If so, perhaps you don’t need to pay your sheetrocker to make them paper smooth, thereby saving a bit of money. Are you going to paint them? Then you don’t want to use the standard flat paint you typically use throughout the rest of the house and you want to go to a satin paint. Well, satin paint shows more defects in sheetrock, so if you want smooth walls be sure to let your sheetrockers know you want level-five finish, paper smooth, so there will be no finish defects and the satin paint will look really good.

 

And this takes me to finish floor. What flooring are you intending to use in your bathroom, and what flooring is in the adjacent area leading to it? In a new house, another pet peeve of mine is differing floor depths from different flooring materials. Are you going to tile your bathroom? Well, this is a different depth of flooring than a sheet-vinyl floor would be. If the adjacent floor is carpet, your carpet installers can do this pretty easily. But if your hallway leading to your bathroom is hardwood floor, you want to make sure your flooring material choice in the bathroom ends up at the exact same height as the hardwood floor.

 

So here I have almost six pages of detail for one relatively small room; apparently that small bathroom is not quite as simple as it appeared!!! You can see how what appears to be a simple bathroom affects your engineered-floor-system designer, your framing crew, your plumber, your electrician, your roofer, your HVAC tech, your sheetrocker, your tile layer, your painter, and even the person laying flooring in the adjacent area, and I probably missed a couple here.

 

Now some other minor details you may wish to consider include where are your towel racks? Do you want your framer to put some blocking back there so you have solid mounting points for them? What about your toilet-paper holder?

 

So how do you get all of this down on a detailed spec sheet? I didn’t. I met each trade individually, I talked to them about my “story” like I just wrote above, for every room (for the record, the kitchen is your most complex room, so write this story last, followed by your master bathroom, so save this one for second to last). I asked them how I should coordinate with trades before and after them to ensure it all moved smoothly. I asked them if I missed anything (you do this every day, what details am I missing that you need to know about?). I basically facilitated the entire thing. Next time, I think I would build a storyboard for every room, 7/16” OSB was under $5/sheet the other day and you could build a board with a half sheet for every room. If you know your toilet and tub, include pictures and specs. If you know your pedestal sink, include pictures and specs. If you are buying your own material (I highly recommend this), include specs on all material you have bought or intend to buy. Laminate all of this information at your local Kinko's, and duct tape it directly to the board. If you have a picture you cut out of a magazine, laminate it and tape it to the board as well.

 

Now even with this level of detail, you will get caught off-guard on something. But compared to “normal” 20% +/- change orders on custom houses, my change order total was <2%, and this was actually based on an error in my architect’s plans and specs, so I could have perhaps recovered this cost from him in small claims court.

 

A book I heartily recommend to help you do this is Myron Ferguson’s Better Houses, Better Living. I read the old version, Build it Right, but I understand the new version is much improved (hard to believe; the old version was excellent). And while Mark isn’t paying me to publicize his site or the products he is selling, he has this book available in his bookstore at a better price than Amazon. I checked it our from the library first, but I had so many Post-It notes stuck to it I eventually had to buy my own copy, which not being entirely frugal, I purchased from Amazon.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/16/2007

I am no longer involved in construction projects.

The most difficult thing for an engineer supervising their own residential project is not letting anyone actually know an engineer or architect is checking their work. Engineers tend to be picky about details, and as such, residential trades really don't like working for engineers and will typically surcharge a bid by 30% or so just for the headache of doing so. I never volunteered what my profession was, but all of my subs knew I was somehow in one of the trades just based on the way I talked to them, and an overall knowledge of better construction techniques.

I didn't even want my code inspector to know my background. The only two people who knew my background were my architect, (because he and I collaborated on the structural details that would be included in the blueprints), and my sparky, who happens to be related. My blueprints were actually the least level of detail I could get, again not wanting to unnecessarily scare potential subs, although I was very specific on expectations when I talked to the subcontractors directly.

Putting together specs for your own use, and sharing them entirely with your subs are two different things. I had some friends, husband and wife, both large-scale engineers working in construction project management, who decided to manage their residential project like they were used to. Once the subs invited to bid quit laughing, and of course none even returned bids, the project was burnt. They couldn't get anyone residential to touch that project, even at significant premium. They eventually got their house done, and it is hands down one of the nicest houses I have ever had the pleasure of touring, but at what cost?

Hence my recommendation above to keep it simple. Know what you want, share what your expectations are, use their language, but don't get too technical on the specs. Start telling your sparky that you want GFCI outlets in the bathroom, and you are going to upset him quickly, because that is a basic code requirement and he already knows that. Use quality subs and treat them like professionals, and they will enjoy your project and deliver to your expectations. Try to write specs like an engineer, or try to get too many details that are already on your plans or in the code book, and they won't respect your project.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 10/25/2007

I used a Gastite home-run system for my gas lines; corrugated stainless steel. There has been a recent class-action lawsuit against several CSST manufacturers. I put some information on this in the "Product Reviews" section of the forums, since I also provided a review of the Gastite over there, and more recent users should be aware of that lawsuit and potential implications for their project (for me, I am not a party to the lawsuit and didn't share in the proceeds, nor do I intend to).

This is one of those things I would discuss with potential plumbing subcontractors when you are asking them for bids, as it will definitely affect your bid price. I wouldn't put it on the plans though. I like to talk to subs; the plans are secondary to our walk around the house, and provide them something to take notes on so they may prepare a bid later. It is the story I tell on the walk-around that is important. Of course your plumber gets involved pretty early (underground plumbing), so you need to have this walk-around with him/her before each stage (underground, rough, finish), just so they remember.

Now then, I would also pick out a representative stove and outdoor barbecue. Different appliances have different supply needs, and I would want to make sure that when I hook up my big commercial range that it gets enough gas. Just saying I want a gas line here doesn't do much, saying I want a gas line here that can supply my XXX,XXX-BTU appliance tells them what they need to know to adequately size the supply line. Same thing goes for your electrician. Not all cooktops use the same amount of electricity, and you want adequate amperage there. Running bigger copper or gas lines after the sheetrock is up gets mighty expensive.


Planning Phase  >  Input On Poured Concrete Floors for the 2nd storey
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/6/2006

There is more than one way to solve a squeaky floor.  I used open web floor trusses, sized to L/480 deflection, glued and screwed subfloor.  I don't have any squeaks and I also have a rock solid floor, albeit wood.

If I was going to do a suspended concrete floor, I would use Speedfloor or Hambro to avoid the extensive bracing (they are braced, but much differently than Litedeck).  I seriously considered this, but in the end went with the wood trusses.


Missouri  >  Contractor's license to pull building permit
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/5/2006

Call your code department, they will tell you the requirements to pull a building permit.


Construction Bargain Strategies  >  Countertop Deals
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/5/2006

Capri, available at some Lowe's, used to be available to DIYers, but no longer.

The material itself is pretty cheap, install is more complex and uses some fairly expensive tools. However the real price is in the exclusivity and professional installation. It is a premium surface, you will pay a premium price.


Building Phase  >  Re-work
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/5/2006

The person I would call is your surveyor.  My surveyor did the plot plan, as required to pull my building permit.  My surveyor laid out the corners of the house, offsets, and excavation depths.

Your building code should not have been issued with a mistake in the plans, and an inappropriate setback is an obvious mistake (they would have caught that locally, but you aren't building here).  However you surveyor should have known better, and this is where the mistake first occurred.

We had to put our house back 10' further than we were expecting, but we learned this when we got the plot plan back so it really wasn't a surprise other than we cut down a tree we would have otherwise liked to keep and had to cut down another that we wanted to keep.  This is a common first-time O-B mistake.


Miscellaneous  >  Bargain faucets
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 11/19/2009

I am with you as well here. Bargain and cheap are rarely the same, and shouldn't be used interchangeably. That said, my plumber had never seen Danze faucets, and when he held them in his hands he thought they were a bit pricier than what I paid. And while I originally found these based on the Internet and aesthetics, I certainly didn't order them without finding a local supplier and going to look in person. Besides appearance and what appeared to be initial quality, my decision point on these faucets was ability to obtain any single replacement part locally, from multiple sources. Being able to service and repair items vs. simply replacement is often the difference between bargain and cheap.

And while those 1850 faucets are clearly quality, how easy is it to find parts? Granted at this point parts cost what they cost because you wouldn't replace the faucets themselves as that would significantly diminish the nature of the room. However with quality fixtures, there is not a lot to wear out either. And here is a situation where replacement and updating would probably lower the appraisal as well ;-). Thin metal foil finish over plastic parts is something different entirely.

Given the thought and level of detail Faye has put into her house, and that this isn't her first build, I definitely have a high degree of confidence when she recommends a source.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 11/21/2009

I don't wish to hijack Faye's post here, so I started a new thread over in the Construction Bargain Strategies section on cost vs. quality (Cheap-vs-Quality-sometimes-cheap-wins). Actually as I think about it some more, if I was in a budget crunch I would definitely buy the absolute cheapest faucets I could get by with. Why, because they are easily replaced later with minimal impacts on anything else in the house. There might be other examples, which is why I don't wish to hijack or scope-creep this thread but thought a new thread might be better.


Miscellaneous  >  3,000 or 3,500 PSI for foundation?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/3/2006

I can't really answer this question for you, but I can tell you what I put in. I used 4K psi concrete mix for all concrete. I placed most with a pump, and 4K psi flows through the pump like gravy and consolidates much nicer. Compared to recent concrete prices, you are getting a bargain at $60-62/cy.

The price delta is so cheap, I figure it is just cheap insurance. At the same time, $200 today, $500 tomorrow, $150 next week, and pretty soon you get to some "real" money. I drew the line at stronger than 4K psi and also didn't use state grade aggregate. I would consider the upgrade as money well spent.


Miscellaneous  >  Foundation / basement
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 4/1/2006

Actually Mike, it is concrete.  Cement is simply one component of concrete, there is also course aggregate, fine aggregate, water, and admixtures.  The strength of concrete is a function of your water/cement ratio (more water, less strength), your aggregate, how much air you have in the mix (obviously air has no strength), and admixtures.  You can mix concrete for many different reasons, they all have different proportions of the same basic ingredients.  For example, the newer pervious pavements use a concrete mix without fine aggregate, so they contain a lot of pore space (and hence porosity).

Are you using a subcontractor to pour your footings and basement?  You might start there as they should know a thing or two about the concrete they are pouring and finishing.  Alternatively you might try the Portland cement association Internet site such as cement.org.  Most concrete specs for residential construction is based on 3,000 psi strength.  I used stronger for two reasons; it's cheap insurance, and since I am using Insulated Concrete Forms and don't strip the formwork to make sure I get good consolidation of the concrete the 4k psi pump mix is easier to consolidate and more forgiving to flowing in tight spaces.  For exterior slabs (driveway, sidewalk, patio) I used a 4k psi mix for insurance, and also included air entrainment admixture.  You will find that most people that finish concrete will tell you that 4k psi concrete finishes better than 3k psi, but I think there are too many other factors here than simply strength of the cured concrete.


Building Phase  >  Painting
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 7/26/2009

I used a similar sprayer, I borrowed it so I can't verify the make or model. Graco, but which one? Not pro level, but very nice homeowner level, if that helps.

I am a big fan of primer and two finish coats for most paint colors (lighter paint colors might work with one coat). I always partially tint the primer depending on the color of my finish coat. Sometimes your paint shop will have a special primer color that helps with coverage (I selected a dark burgundy for the front door, the primer was tinted bright pink, not sure how they select but that is what was recommended in the computer by my color selection and it was really bright - I left it that way for a couple of weeks just to gauge the neighbor reaction, and yes it generated a ton of reaction). Also new drywall gets a different primer than other applications, your knowledgeable paint supplier should be able to help you here.

If you have vents in the walls (cold air returns, HVAC ductwork), paint the area inside the ductwork black and it will provide a bit nicer finish when you put the covers on.


Planning Phase  >  HVAC and SIPs
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 12/18/2007

Brandon,

I would agree, you do not need an ERV. Let's look at what an ERV supposedly provides for you:

1) You do need ventilation, no question about that. Building a tight envelope, ventilation becomes more critical. However, an ERV is not the only means of providing ventilation. In fact, design and adequate ventilation in humid climates is more critical to control than design and ventilation in heating climates (which isn't nearly as critical to get right, so do it easy and throw in an ERV or HRV in that situation and don't worry about it). Here is an old study, but I find the concepts still quite relevant - buildingscienceconsulting.com//Bugs_Mold_Rot.pdf

2) You do need humidity control, no question about that either, especially in a hot, humid climate. An ERV is not a good method of providing humidity control. I would suggest that a dedicated dehumidifier would provide a better method of controlling humidity than an ERV.

3) An ERV provides energy recovery, and this is icing on the cake. Build with SIPs and properly detail this, and you have reduced your energy-use levels a significant amount over traditional construction, reducing the amount of money you will save with your energy recovery, thus reducing the amount of benefit energy recovery actually gets you.

4) You do want positive pressure, and this can be accomplished with a $15 skuttle valve.

For my money, I ditch the ERV and install a ventilating dehumidifier in its place. I would look at the Aprilaire 1700 or a Therma-Stor APD (air-purifying dehumidifier). The Therma-Stors are nicer, but also much pricier. This will allow you to control ventilation independently of humidity, both factors you need to control. I would worry about the best way to do this, and forgo the icing on the cake if that means sacrificing key design parameters (short answer, the ERV isn't going to do the job you need it to do, energy recovery isn't something you get if you want to adequately control humidity AND ventilation, sacrifice one or the other and you can have energy recovery - not a good sacrifice).

As a side note, I have tracked over two years of HVAC data for my ICF house, 4,000 s.f. +/- in the envelope; and my HVAC costs are right at $50/month with ventilation, positive pressure, but no energy recovery. Would an ERV save me money? Probably in the winter, but summertime likely not (my AC is oversized, so reducing operating need is counterproductive in that it leads to short-cycling - a design flaw I get to live with as I have not fixed it yet). An ERV was $1,700 installed at the time of my installation, so assuming $10/month cost savings financed at 6% mortgage interest, I would never recover the incremental cost of an ERV.

As to the greenbuildingtalk.com website, I don't find the link very compelling for relevant information on this topic (yes, I am a member over there). For your question, I would suggest spending some time over at the indoor air quality forum on HVAC-talk.com, and even then I would read about hot, humid south and not pay any credence to dry, north, heating climates, as the issues are entirely different.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 12/20/2007

Notice the lack of an ERV?

This diagram (Thank you, Jon!!!) is exactly what I recommend, except you install your ventilating dehumidifier between the outside air and the supply for your air handler. That motorized damper gets removed (this function is provided by the dehumidifier). There is also a duct from the supply for your air handler to the dehumidifier as well.

Figure 28: Outdoor air connected to return side of air handler

 

Notice a Therma-Stor Ultra-Aire APD has provisions for both by looking at this picture (indoor air from your supply line, outdoor air from your outside air source, and fresh dry filtered air back into your distribution ductwork):


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 12/21/2007

I will provide my final recommendation, and it is not any different than what I did in my house. I had conflicting recommendations, and based on this I even had a mechanical engineer (living in an ICF house) perform an independent analysis to help me figure out the best approach. Next time I save my money, as the engineer didn't give me anything of value for what I paid. Anyway I figured out the installer I wanted to use. I then shared with him the conflicting information for the other installers, including the mechanical engineer and said, '...let's work through these issues because I honestly don't know who is right and who isn't, but I do know none of you "experts" agree and sometimes your disagreements are pretty significant.'

That said, I went with the minimum system I could get by with, but with the ability to upgrade to the top-of-the-line system easily if that were needed.

1) For example, I am ducted for an ERV or HRV, as installing ductwork in a new construction job is easy, retrofitting ductwork behind sheetrock is hard. If I decide I want an ERV or HRV later I can bolt it up and connect the pipes. Sure I paid a minimal amount extra during construction, but I minimized my risk in that if I ever need one I can install it pretty easily. Since I openly disagreed with the experts, I felt I better build myself an opportunity to save face when I was later proven wrong (how can a person who has never done this before explain that he is right and everyone else is wrong?).

2) Another example I had is that even the experts couldn't agree on what size AC to install. Manual J showed three tons, but "rules of thumb" showed anywhere from 5-6 tons. My ICF subcontractor said there was no way I would get by on anything less than four tons. Even the mechanical engineer said he wouldn't install anything less than four tons on my house. So what to do? I have ductwork and air handler to support four tons of airflow, A-coil for three and a half tons, large enough line set, and a three-ton compressor. If three tons wasn't going to be sufficient, I have only one piece of equipment to upgrade to four tons, the compressor. Nice and easy to fix this later. Sure some of these upgrades cost a bit extra, but in the face of uncertainty I was willing to invest a bit extra to minimize risk and minimize the cost of "fixing" it later. As it turns out, three tons is actually too much, but I live with this and am happy I didn't listen to the "experts" steering me in the right direction. However I am also happy I had the foresight to upgrade if I were indeed wrong.

I have other examples, but they really aren't relevant to your situation. The point I am trying to make is to assume the solution you are using is wrong, but allow yourself the opportunity to fix it later if it needs to be fixed. Live with the minimum; if you don't have sufficient dehumidification you can later install a unit like I recommend (the Aprilaire or Therma-Stor APD) using the ductwork (and the power your electrician already ran for this unit and the floor space you left next to your air handler) you installed for your ERV or HRV. If you don't have sufficient ventilation, you can later install an ERV or HRV. If you don't need either one, well, you have some extra ductwork that didn't cost very much. If you decide you do need it, you (and your HVAC tech) will appreciate your foresight to already have the ductwork and electrical connection in place, because now a retrofit is very easy.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 12/21/2007

One question on HRVs. The way I understand it is that when they are balanced, the exhaust-air flow rate equals the intake-air flow rate. I understand you can set the balance to provide a negative pressure or positive pressure (me, I would set to positive pressure and not zero, but that is open to debate and a separate discussion for another day). My question is how does the HRV provide enough makeup air when the house goes into a negative pressure situation, such as when you fire up your bath fans (I know some people use the HRV to exhaust bathrooms, I don't like it and code officials in my area don't allow it, but that doesn't mean it doesn't change after the code official leaves) or more importantly a big flow such as your kitchen hood (unless you have those horrible recirculating kitchen hoods - yech)?

I don't recall the exact details on my system (it is a couple of years ago), but we addressed this in "most" situations. That 500-CFM kitchen vent causes negative pressure, no doubt about it. Fire up all bath fans together (~350 CFM), and I get negative pressure then, too. During "normal" operation, I maintain positive pressure, and one or two bath vents or a clothes dryer doesn't change this. As a side note, my other combustion appliances (furnace, HWH) are two-pipe systems bringing in their own combustion air.

Agreeing with Jon, when you exhaust air, you better design a place to get an equivalent amount of makeup air back inside, preferably with some sort of conditioning before it is introduced into your living area, especially on an SIP house. That air will come inside; you want to control it.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 12/21/2007

That's how I understand it as well. 

BTW that Lawrence Berkeley National Laboratory Report is a fantastic resource that should be mandatory reading required in any O-B's 1,000 hours of planning. Or at least the condensed version in The Journal of Light Construction.

Truthfully, this is one of the best discussions on this board in some time, the resources and information here are relevant to every O-B. It is the education from topics like this that continue to bring me back here even after my house has been completed for over two years (I would dump this moderator gig in a second if the discussion weren't fresh and exciting). It is also helping O-Bs to do their own research and when necessary to buck conventional wisdom to do things better, probably the single link that draws us all here together.


Construction Bargain Strategies  >  2008 Builder's Show???
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/28/2008

I realize this is a somewhat old topic, but how about a report from some of you that attended? The show was just last week, please share...


Financing  >  Can't Finish Build -- No more funds
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 12/12/2007

I have a couple of suggestions here:

1) When I received my construction loan, it was based on an appraisal based on the plans I submitted. However when it came time to close on a permanent loan, they based it on the appraisal at the time of closing (which allowed me to take a cash stipend out for my labor since my appraisal went up). I wonder if you could ask your construction loan lender for a new appraisal, based on current market conditions and perhaps a bit less conservative (you actually have most of a house, not just a piece of paper, there should be less risk). With current market conditions, this could work against you, so be careful what you ask for.

2) Does your construction loan need to be closed? I know some get called within a certain period of time, say 12-15 months. However on mine, they (my small local bank) routinely lent money to subcontractors for construction loans that would be used as model houses to show to prospective clients, and these loans remain as construction loans for time periods of potentially several years. My construction loan had no deadline for me to convert it to permanent, in fact we left it open as a construction loan for several months after we received our CO and moved in, as it was an interest only loan we weren't really in a hurry to convert this to a mortgage. Do you have this option?

Truthfully I would get my CO on a shoestring (you would be surprised how little you actually need to get this) and finish it as you have expendable funds. Selling a partially finished house is a definite loser as no one will pay what you have in it and have to complete your project.


OwnerBuilderBook.com  >  Internet Links
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/13/2009

I have a suggestion for emails that contain links. When you click on those links, it opens the link in the same window and closes the O-B forum message. I would suggest a better way would be to open the link in a new window, that way you just close the new link when done. And you always have the message (sometimes there is data or analysis in the message that I like to read as I peruse the link).

This seems to be especially prevalent among Grant's messages, he interprets and provides relevant links, it would be nice to have the link open in a new window so you don't lose Grant's commentary.


Planning Phase  >  Contracts for subs?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/23/2007

I went more with Michael's approach here.  Some of my contracts (eg. sheetrock) were nothing more than a page torn out of a spiral notebook with my address on it, and an agreement to provide finished sheetrock at a fixed price (the bid price).  However some trades are a bit more crucial, I would have never been satisfied with a proposal like that from my ICF subcontractor.

I would like to clarify or perhaps one additional bit of advice to Michael's about never paying more that the value of work done to date.  Never pay so much on the job that it isn't worth the subcontractor to not come out and finish the work.  As an example, if you pay your concrete flatworker by the square foot (not unusual), and he pours your driveway but not your sidewalks, don't pay him for the entire driveway as a sidewalk job may be simply too small to lure him back to finish, thus leading you to have to find a new flatwork contractor for a small job.  For progress payments, I like to give the subcontractor enough to cover his suppliers (unless they were using my supplies, and be sure you get lien releases from his suppliers, not just the subcontractor) and his hired employees, but I like to withhold enough so that I know he will ultimately finish the job.  This is one experience many O-Bs learn the hard way, myself included.  I would rather be able to hire a replacement to finish a job than hound a nonresponsive subcontractor to finish the job.  They don't become nonresponsive when there is a good bit of money on the table, and if they do, well that money can go to the increased cost you will incur trying to get someone to do a partial or small job.

Now you need to understand the laws of your state.  In some states it is very easy to file a mechanic's lien against your property for the amount of damages, and in some states they don't even have to notify you that a mechanic's lien was filed leading you to find it at closing - fire a subcontractor or don't pay them an entire amount whether they do the job or not and you risk seeing this mechanic's lien.  However in some states, the sub contractor cannot file mechanic's liens if they are working directly for the owner of the property (which as an O-B that is you) unless they reserve the right to file a mechanic's lien in their contract (no contract, handshake, no mechanic's lien).  Now then, their suppliers can still file mechanic's liens as the suppliers are not working directly for the owners but for the subcontractor (unless you get your own supplies).  Missouri is an example of the latter example, and since I was an O-B (although many thought I was the GC, and not an O-B) and ultimately all subcontractors worked for me and didn't necessarily know the laws, this was a bit of extra protection for me.  One subcontractor threatened to file a mechanic's lien, but a letter on lawyer letterhead explaining his rights to his attorney seemed to alleviate the situation.  Out of all my subcontractors, only one actually had the proper language reserving his right to file a mechanic's lien, and this was not a subcontractor that did new construction but always worked for the owners of property, also one of the few subcontractors that insisted on a contract prior to starting work.  Interestingly only one of two contracts I actually signed for subcontract work.

However, this makes prescreening your subcontractors and getting your own supplies that much more critical.  For example, my subcontractor could choose not to pay a supplier and I was still vulnerable to a mechanic's lien from that supplier (which is why I wanted mechanic's liens from suppliers too, not just the sub).  I figure if they are bad subcontractors, then their paper isn't much better than they are and how much protection does it really get you?  No paper, and you are free to fire them at will as they have no protection either.  I would rather they have no protection, and am willing to sacrifice my own protection to get them there.  As for me, I am resourceful and will find a solution, even if that means me doing the work myself.  This is not a conventional approach, and if you are going down this path you better make sure you have alternatives and you better make sure you know the impacts of the trades following any given trade.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 11/26/2007

Sorry, it has been a long time since I looked on this thread, probably too late for you but still a good question that deserves and answer.

First of all, I paid attention to the suppliers subs were using. Lets use a concrete subcontractor as an example, I paid attention to whose name was on the concrete pumper truck as well as the name on the concrete Readymix truck. The concrete guys got progress payments, I paid the first progress payment and told them the next progress payment wouldn't be made until I received mechanics' lien releases from the first round of construction. I also realized they stopped by the lumber supplier to pick up some form work, and I didn't worry about this because it was small, and since they were loading it directly on their truck I figured the supplier didn't have an address or build job associated with it. One of my concrete subs used lumber from Lowe's, and the chances of getting a lien release from them was nil anyway (and the chance of getting a mechanic's lien for a relatively small amount of lumber likely even smaller). I realize they need my payment to pay their suppliers, so one payment delay between suppliers and lien releases seemed reasonable.

For the subs that didn't have progress payments, I would also pay attention to the names on the trucks and call the billing department of these suppliers. Most subs have a history with suppliers, I wanted to know that their payment history was good. Further I would give them a week or so after I knew the check cleared my bank, and call the suppliers again asking if I may fax a lien release for them to sign.

Interesting on one supplier and one subcontractor, the supplier made the delivery and the subcontractor was not there (very common). However the supplier would not leave without payment for his materials, definitely reflecting that the subcontractor had problems with making payments to suppliers (he was a good technician, but sometimes good technicians don't get financial training when they decide to go out on their own). I paid the supplier, got a paid invoice, provided the invoice to the sub and deducted it from his bid. No problems.

And truthfully some subs (HVAC and drywall), I didn't have a clue as to who their suppliers were. Given the size of my drywall subcontractor, I figured if he had supplier problems it would severely hamstring his operations. And as to HVAC, I used to work with one of his parents and still talk to them, I don't think he would have caused me long-term issues.

Once you explain to your subs that you need the lien releases for your bank loan, they don't have any problems getting them. However be reasonable and don't ask for lien releases from every dime they spend (oops, need a plumbing fitting, I am going to the closest supplier and not my normal supplier) but at least pay attention to who the big money supplies are coming from.


Planning Phase  >  heated/living vs garage
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/27/2006

I figured about 50% of my price for rough-in, 50% for finish.  A garage doesn't have a high level of finish (painted sheetrock, no heat, no bathrooms, no fancy floors, basic lighting), so roughly 50% of finished living area.  This is an estiamte, I have seen some garage mahals that cost as much on a finished cost as my living space.


Building Phase  >  Installing Tile
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 7/7/2009

For reference, I would use the forums from the John Bridge internet site. Plenty of professionals over there, but also very civil and helpful to DIY tile setters. You can install tile over drywall, and if you have a drywall tub surround there are methods of waterproofing it first (Schluter Kerdi system is one such method).

For the subfloor, when I put down backer board I use both thinset and screws. This makes for a rock-solid base for the tile and there are absolutely no voids between the subfloor and the backer board. A different school of thought is a decoupling membrane such as a Schluter Ditra membrane. I like to keep my floor transitions nice and level, the decoupling membrane allows for a thinner total install than the backer board. My preference is dictated by the adjacent flooring materials.


Miscellaneous  >  TRUSS HELP!!!!
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 9/25/2004

I recently received an order of wood open-web floor trusses, some of which needed repair. I requested the truss designer come out to the sight and inspect the trusses I identified didn't look quite right to me. Of the seven trusses I identified (out of the entire order), he submitted truss repair orders to their engineer to determine appropriate follow-up. The engineer identified that one truss needed replacement, identified field repairs for four other trusses (field repairs to be performed by the truss company), and determined the the other two were fine. The truss fabricator provided a replacement truss within 24 hours. Unfortunately this was the wrong truss, so they provided another replacement, although this one took 48 hours (total 72 hours after identified problem). As a bonus, the first replacement truss coincided with a truss that needed field repair, so we used that one instead of the field repaired truss. The critical part of this equation is that the engineer modifications become part of the paper trail for the truss package. When the code inspector gets here, if he sees modified or field repaired trusses without the engineering drawings, he will fail this immediately. Since the truss designer and fabricator have the engineering to support these repairs (and I have a copy for the code inspector), this should alleviate this issue (not been inspected yet). Bottom line, if the engineering supports field repairs, I would let the truss designer use field repairs to fix their mistake. I would not do field repairs on my own, and especially not without engineering drawings.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 11/18/2004

I want to provide some process information and tips for anyone considering using trusses.

1) The truss fabricator will provide a template and shop drawings for your verification and ordering.  They will not fabricate these without your approval.  The shop drawings are very difficult to interpret, but since they are all different scale (they are scaled to fit on a page), you can't look at one truss and compare it to another.  As O-B, we are not "experts" and may not know exactly what to look for to identify potential problems down the line based on 2-D renditions.

2) My roof truss fabricator "claimed" to use the architect's drawings to design and fabricate the trusses.  Unfortunately we didn't notice until they were all installed that two roof transitions simply looked "wrong."  All trusses matched the shop drawings, so there was no problem with the fabrication shop.  As it turned out, the Architect left a key piece of information off the plans to allow for a smooth roof transition, and the truss designer simply assumed that the slope should be the same as most of the house (an incorrect assumption).

3) The truss fabricator has the ability to provide a 3-D visual image of the trusses.  My fabricator identified that they simply don't use this capability since the architect provided the specifications.  If I would have taken one hour to go to the fabricator and view this in 3-D, I would have immediately realized the error and we would have corrected this BEFORE the trusses were ordered.

4) As it is now, the truss designer is blaming the error on the architect and the architect is blaming the error on the truss designer, and all I want is a correct roof pitch so I can get my roof sheathed and roofed before it gets too cold.  As such, I am paying for the extra materials, labor for repairs, and will take up the "who pays for it" question later.

5) The main lesson learned here is to use the 3-D tool to visualize what you expect the roof to look like.  Do not order trusses without this visualization.  This simple step would have prevented ordering and installing incorrect trusses, delay to engineer "corrections," delay to the installers, and delay to the subcontractors that can only come in after the roof is installed (roofer, windows, doors, Plumber who puts vents through the roof, HVAC).


Miscellaneous  >  Building with ICF
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/6/2004

I am relatively new to this site (first post here, but longer-term lurker), but am also considering owner-building with ICFs. I am looking at the ECO-Block system, mostly because I can get great local support and the local distributor (ICF Solutions) really supports O-B. There are several O-Bs locally who have used/are using ECO-Block. I was able to take an ICF installers' course sponsored by ICF Solutions and ECO-Block - if you have one available locally from whatever ICF block distributors service your area, I highly recommend it. As a bonus, If I do use ECO-Block at some point in the future, they will refund my course costs.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/22/2004

One of the challenges we are finding is designing to use ICFs. Most of the designers and architects we have been talking to "...tried this once five or six years ago, and the project went over budget..." so they don't recommend it (and all identified that this cost anywhere from 20% more to over $100K more). You really need to find someone familiar with the technique for the design; they are out there, it just takes effort. I don't simply want to convert a stick house plan for use with ICFs, because I am interested in reinforcement schedules, designing window locations for ease of placement, designing dimensions for ease of placement, etc.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 6/30/2004

I am going to start construction pretty soon (excavator gets here on July 5) and ended up planning for the Amvic ICF system. I ended up with Amvic because the installer I hired prefers this system due to the strength of the block. I had bids both ways (ICF and stick-built) and found the ICF costs the same compared to good-quality stick-built construction based on the cost of lumber.

My bids came in at the absolute high point of lumber prices (they have stabilized and are starting to come back down in Kansas City)... Given the $0 price differential and the quality and experience of the ICF crew I hired, the decision became a no-brainer. The key here is an experienced ICF installer and ICF crew, so no on-the-job training at my expense.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 10/19/2004

I have heard of other O-Bs using ICF having the same problem. This is threefold; 1) Most framers haven't actually worked on ICF construction so there is a learning curve. 2) The ones that have have probably worked on ICF construction where the walls weren't quite straight (typical using ICF) and the labor costs ate them up, hence the higher installed price they pass on to the builder. 3) The carpenters who know what they are doing with ICF probably have enough work with established ICF builders.

There are two solutions to this. I know in Illinois, the union apprentice carpenters are learning to frame the exterior walls with ICF. This education process is the carpenters' recognition that ICF is here to stay, and if they want to ensure future work for their carpenters they better embrace this technology.

I took a different approach. I had floor trusses and an engineered floor system developed. If you are going to do this, you better be very meticulous and detail oriented. The USP truss hangers were cast directly into the ICF and tied into the top course of rebar. The upside, once these were delivered floor framing took a professional crew of two people 1-1/2 days, with another day for the subfloor. This system cost me about the same in materials as using TJI wood I-joists. The crew was impressed enough that they have used my truss supplier to bid a couple of other jobs.

The downside, my underground plumbing was slightly off, so a 2x6 wall became a 2x10 wall (2x4 furred next to the 2x6 wall) so the trusses would have proper bearing and the plumbing would end up in the wall. This could have been solved by moving the plumbing slightly. In traditional framing, the fix would be to leave some joists longer, and since they are all field-cut anyway, this wouldn't be a big deal.

Once this was done, the interior non-load-bearing partition walls become easy to frame. I hired a laid off carpenter to help me and paid him hourly. I had him go through a day labor shop so that he had workers' compensation insurance and they also took care of social security, taxes, and the other administrivia I don't know how to deal with. I certainly don't need an uninsured carpenter getting hurt on my construction site.

Wherever there is a problem, sometimes you just need to be creative to find a solution. Given the cost and ease of using floor trusses, I am surprised this isn't more mainstream.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 10/21/2004

Rundquist and Associates. I dealt with Greg Rundquist. He was great.  816.472.6006. He definitely knows who I am.

I shopped a lot for an architect willing to work with ICF; I found this to be a big challenge. I found a couple, but Greg was far and away the best alternative for me.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 10/21/2004

This is where you need to get creative in your planning process.

1) For example, my DW and I frequent several local drinking establishments for Happy Hour. Several of these are "blue collar" type bars. We talk to everybody while we are there. We know all of the bartenders, and a lot of the patrons. The bartenders know all of the patrons. Point being, the bartenders know we are building our own house. When we are in there, they always ask about progress. We tell them we are looking for certain expertise, and to let us know if they know anyone willing to bring us a proposal. For example, when we needed carpentry, we told them we were looking for a carpenter, basic scope of work, how much work, what tools, whether we were willing to take a side job on the weekend or wanted a primary crew, etc. We have met suppliers here, subcontractors here, and if we talk to them while we are at the bar we buy their drinks. We buy a lot of beer at Happy Hour prices.

2) Another example would be to volunteer for Habitat for Humanity. There are two kinds of volunteers: 1) those who understand construction, and 2) those who like to say "I volunteer for Habitat for Humanity." Gravitate toward the first type, even if you don't know anything. Most of these people are professionals (you don't learn framing without swinging a hammer, same goes for electricity and plumbing), not amateur volunteers pushing the broom. You get contacts, and you can validate quality of work because you worked side by side with them to build a house when they were working for free. I figure if you pay them, you probably get a higher grade of work than the pro bono work.

3) Talk to your local suppliers. They know what contractors are busy, who is looking for work, who does good work, and who cuts corners. This is one reason you use smaller trade-only suppliers and not Home Depot or Lowe's. Talk to them. Most people working at the lumberyard have built their own house, or at least a garage or deck - these people have expertise. Many of them used to work in the construction trades. These people have contacts.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 10/26/2004

PM me at by clicking the "send a private message" button at the left and I can provide more details. I am somewhat hesitant to discuss my bids on a public forum, lest they be taken out of context. I have been happy to share my sub list with other people who have contacted me via this site. I will even tell you people I talked to that I didn't select, and why - perhaps saving you some time and effort. You're local; I would be happy to give you a guided tour.

As to the floor trusses, this is one decision I have been happy with. My truss supplier is Builder's Resource in Merriam, KS, although McCray Lumber has since acquired them - talk to Jerry Meek. My roof trusses should come in within a week or so, from McCray this time (again Jerry Meek).

If you are going to do floor trusses in ICF, you need to be meticulous in the template. Especially if you did like I did and cast the truss hangers directly into the concrete. Floor trusses are not very forgiving. My architect asked me the day before the trusses were delivered if I thought I made the right decision. He was skeptical, but not as skeptical as the truss designer was. Considering how easily they dropped in, with no truss modifications (although a couple of field repairs as described in another thread), I really think the factory-built floor system was a good decision. When you consider that the material only costs were slightly less than the TJI material-only bid I received, and the labor savings from the floor trusses not needing any cutting, etc., why it really becomes the right call. The only downside was that a plumbing wall (also a bearing wall) was not in quite the proper location, and furring a 2x4 wall adjacent to the 2x6 wall solved this. Using TJI, these pieces would be field-cut anyway and this wouldn't be an issue.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 12/6/2004

No problems with the inspector. However, my truss system was engineered based on the USP hangers - I provided the manufacturer's data and a sample directly to the truss designers. My truss designer had never seen these before, but afterward has recommended them for several installations (which says a lot as they are Simpson Strong-Tie distributors). My code inspector simply looks at the installation to make sure it was installed per the engineering. They don't have the qualifications to determine if the hangers are the correct way to attach the trusses, but they do have the qualification to tell if they were installed per the engineering specifications and drawings. The inspector looked at these connections prior to the concrete pour (tied in to the rebar), and will again during the framing inspection (enough fasteners holding the truss in place).

The USP connectors I used have a lot more bearing than was necessary per the truss designers. What I did was stub my trusses 1/2" (have them all fabricated 1/2" short) so that they would drop in easier. The whole floor system dropped in smooth as butter with this extra 1/2" to work with. If your trusses aren't stubbed, you need to make sure the trusses are perfectly perpendicular to the wall or they will bind and be difficult to install.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 12/21/2004

I don't have one close by right now. An interesting note is that it isn't in the catalog - this was pointed out to me by the truss designer.

IIRC it is an RPW series connector. I will get part numbers and report back later.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 12/28/2004

USP IFH Series. The sizes for 1-1/2" wide (single joists) are IFH28 and IFH28-11 (longer bearing). For a 3" wide (double joist) they are IFH28-2. For the 3-1/2" (Trus Joist) they are IFH48 and IFH48-11 (longer bearing).

This should help you.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/1/2005

Most of the block is based on a 48" linear size by 16" tall, so it really doesn't matter. ARXX has some strange dimensions (metric), and the corner dimensions are all different. If you deal with the commercial ICF block, they are all based on sizes of CMU units and are standardized. Also the IRC does not care what block you use.

Now then, the code inspector needed to know what block I was using so they could verify code approval. Interesting, since the block contributes no strength to the finished wall. It was the first time they dealt with Amvic, so they had a learning curve to get up to speed. I tried to explain that Amvic was no different than Reward and ARXX (both of which the building inspector was familiar with) in that they don't ask whether a builder is using aluminum or wood for basement form work in traditional construction. This all fell on deaf ears.

One advantage is that all of the ICF companies have standard drawings that you simply add to the detail drawings of your plan. This is all based on their block. When I switched from ECO-Block to Amvic (based on the subcontractor), my architect simply printed a page of Amvic standard details and eliminated the page of ECO-Block standard details. No problems. I don't know if it would have been necessary for the permit, but I felt that since they were not familiar with either system, it would be best if my drawings match my materials.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/18/2005

I took the ECO-Block course for $125. If I would have purchased ECO-Block, it would have been credited off my first order. Even though I didn't ultimately use ECO-Block, it was money well spent. I anticipate most manufacturer's courses are very similar. Even if you intend to subcontract the ICF, take the course as you learn enough to be able to evaluate good subcontractors vs. subs taking shortcuts with factory requirements.

I didn't choose Amvic over ECO-Block. Instead, after receiving bids I chose to subcontract the ICF portion of my house. I am trying to balance my limited resources vs. what it costs a professional to do the same job. Based on my ICF bid, I decided to focus my efforts differently (I just finished all interior framing myself, something I originally intended to subcontract). My ICF subcontractor prefers Amvic over all of the other blocks he has used, and I saw no reason to disagree or ask him to use a block he was not familiar with. At the end of the day, I have concrete, rebar, and foam insulation; any ICF would provide the same thing to the end user.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/19/2005

Are you using roof trusses? If so, the gable ends would normally be taken up by the truss fabricator who would provide gable-end trusses.

What ICF system are you using (more to the point, since you are local and we have exchanged PMs, I am curious who you may have been talking to).


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/20/2005

vbuck.com/gallery

V-BUCK has them.




2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/20/2005

While I found many of the ICF distributors were installers first (distributing the block they are installing), Bob is a distributor only.  Are you looking to DIY the ICF portion of your house?

If so, I would encourage you to look at the service after the sale.  Do they rent bracing?  How much technical assistance will they give you?  Bob is not really local (Lawrence), how much support will you get?  How many material deliveries?  Will they pick up excess material?  Will they be there when the pump truck shows up?  Do they get their hands dirty?


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/31/2005

Wow, a lot of recent activity in this thread. Now for my input:

1) I would not select my ICF based on trying to save concrete. If you want an ICF house, you are at the mercy of your local market and what is used there. If they only use flat-wall systems in you local market, I wouldn't want them trying to learn waffle-wall, post-and-beam, or other system on my project. Stick with tried and true and locally available.

2) If I am trying to DIY, it is flat wall only. On my six-inch flat wall, for large openings (9"), we had a tough enough time getting the concrete top flow around the double #5 rebar top and bottom of the lintels, and this was with 4,000 psi mud (flows like gravy compared to the standard 2,500 psi mud). I can't imagine trying to get it to flow into all of the waffle grids without voids.

3) If you want to save material on flat-wall systems, look at the four-inch systems and save a third of the concrete over the six-inch wall. In my area, they don't use these because the increased labor cost more than offsets the material costs. (This is like robbing Peter to pay Paul. Deal with qualified ICF subcontractors, and they will tell you the best-value way to get the job done.) If it is waffle wall, they will let you know.

4) Please note that the code deals with waffle-wall and post-and-beam differently than flat-wall systems (at least IRC 2000, which is my relevant code). In my locale, I had a tough enough time educating my code inspector on flat-wall, I would not want to take the extra time or engineering to try to educate on post-and-beam.

5) Hydrostatic pressure is not based on the quantity of concrete, but the height of the lift. Pour the concrete in XX lifts, and the hydrostatic pressure doesn't care if you are pouring four-inch-thick wall or 24-inch-thick wall. However on the thinner wall, the wall will fill faster allowing the hydrostatic pressure to increase faster, potentially overshooting the maximum and resulting in a blowout (according to the local knowledge, fairly common with four-inch flat wall systems). The hydrostatic pressure subsides as the concrete sets up, which is why they pour in lifts. You could pour that 14' wall in 4' lifts without any special bracing (although the standard bracing I have seen only extends to about 12').

6) Around here, any wall over 10' requires engineering to support the wall height. If you are pouring a 14' wall, this is definitely an engineered wall and not just what the reinforcing schedule is in the code book.

7) Fire protection - isn't this largely provided by sheetrock? I can't have exposed foam, even in unfinished areas (a large part of my basement is unfinished). Also with fire rating, please note that once you put in a penetration (window or door), your fire rating reduces. e.g put a 20-minute fire-rated door in a four-hour fire-rated wall, and now your wall is only rated for 20 minutes.

8) Lumber prices are volatile. Steel prices are volatile. Labor prices are based on regional factors. There is not a set amount that ICF will cost more or less than stick framing, unless you are reading the manufacturer's literature. My house cost less to frame with ICF than with sticks, and this is not even accounting for reduced HVAC, different insulation, etc. This is simply comparing shell to shell; ICF was cheaper. Since that time however, lumber prices have come down and steel prices have gone up. Bid them both and make an informed decision based on current conditions, and not on anecdotal evidence presented by some manufacturer trying to justify upgrading your components.

9) ICF houses are not tornado proof. They would be if you didn't put in any windows, but who wants to live here? The main failure mechanism with tornadoes is the garage door fails first (are you building a house without a garage?), causing the roof to fail next. The fact is that the roof connects to the house with a mechanical connection, typically a hurricane clip or hurricane strap (preferred). These connections have limited strength. If your garage door fails, it is all over regardless of your construction methodology. The other tornado-failure mechanism is missiles, and as long as you have windows and doors you have little defense against missiles.

10) My homeowners insurance provides a discount based on ICF construction. However they also surcharge my cost of replacement based on ICF construction costing more to replace than standard construction (they obviously didn't pay attention to number 1 above). My homeowners is the same using ICF construction or stick-built for the same floor plan.

11) The appraiser recognized that ICF is quality construction. However the appraisal is based on what you can sell your house for, not what it cost to build. If your local market does not recognize ICF as a superior product, or if your local market does not have adequate sales of comparable ICF houses, your appraisal will be based on comparable stick houses. Being conservative is not a bad thing, it serves to keep you out of trouble.

12) After using a router to cut all of my channels for electrical and plumbing last week, I can say that hands down I would never use PolySteel. Before this sets off too much of a PolySteel defense, let me ask how many ICF manufacturers are out there, and how many use steel ties? ICF construction has been around for over 30 years and the industry has a tremendous amount of knowledge based on many years of construction. I can name only one company using steel ties, yet I can name dozens using plastic ties without issues. Since most companies are on second and third generation block, you would think that if steel ties offered a competitive advantage they would all be using them.

13) And once again, if you are subcontracting the ICF, you should select your block based on the merits of the installer and what they prefer to use. If you are DIY, you should select your block based on local availability and the distributor willingness to provide technical support and expertise to your project. In either case, the ICF itself is secondary.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/31/2005

Fair enough with the patent issue.

What is an interior-exposed web you refer to on the ARXX blocks? I haven't seen one in awhile. I am trying to figure out what was different. I do recall the web exposed on one side - is this what you are talking about? I have seen them installed with the exposed web pointing outward as well.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/1/2005

I simply set the depth gauge on my router to 2-1/2" and cut the foam all the way down to the concrete. I do not know how deep the electric has to be in the wall, but it can't go any deeper. To secure the electric, I got some "Great Stuff" expanding foam from the local evil orange.

As to backing, for the cabinets I used 1/2" plywood based on the millwright's template - the sheetrock will butt up against this. Once the cabinets are installed, it will not be visible (the backing is slightly smaller than the cabinets). As to towel racks, I have only one on an exterior wall, and I can pick up the webs in the ICF with a stud finder. For curtain rods, I am using wood bucks, so I have plenty of backing to screw into. I have seen people use aluminum screen patches behind the sheetrock on the walls where they might want to hang things - basically it just spreads the load out and gives you something a little bigger to hit. Since I can find webs via stud finder, I am not too worried about small stuff (pictures, shelves, towel racks). And then don't forget the drywall anchors for small items either.

For the deck, I will carve a section of ICF foam out and secure a 2x12 ACQ or borate (hard to find borate in large dimensional lumber) ledger plate with Hilti anchors. I will cover this plate with a 1" plywood, bringing my total depth to 2-1/2" or equal to the foam removed. This way, the siding will completely cover my ledger plate, leaving only the joist hangers exposed.

I have not figured out what to do about baseboard trim yet though, (actually if I could eliminate it altogether it wouldn't bother me, as I am trying to achieve a very modern look), although this path has been crossed by others prior to me - there is always construction adhesive.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/7/2005

Good discussion on membrane-type waterproofing products - look what happens when I am working on my house and don't have time to check the computer.

My ICF subcontractors used a rubber roll-on type waterproofing. They swear by this stuff - I will check the packaging (it comes in 5-gallon cans) when I get back out there and post what it is. This stuff is thick and goes on like plaster or stucco; they use a trowel to spread it over the surface.

I also looked at dimple board (Platon is fairly common around here for ICF, systemplaton.com). I tend to think that these systems are not really waterproofing, but backup that provide a way for the water next to your foundation to drain away. If you combine a membrane or roll-on type waterproofing with a drainage-type system, I don't think you can really go wrong.  For the drainage-type waterproofing, I spread 120 tons of 3/4" clean crushed limestone with a 4" perforated sewer pipe (not the typical flexible black plastic drainage tile) to create a French drain around my entire house (I have a walkout basement, the drainage is daylighted about 4' down elevation in my backyard). This provided about 3' of crushed stone around my entire foundation (around here, a sump pump system usually has about 3-4" above the drainage tile). Cheap insurance.

As to staying on budget - good luck. Prices go up, prices come down, hopefully there will be some balance, although I have found more material prices going up than coming down. One of the hardest issues affecting our budget is upgrading materials and options - when we bid items we were frequently not aware of these options - and while good value, it doesn't take much "a couple of hundred dollars here, another hundred there") before you start getting into some serious money. Our bank still thinks we will come in under budget though, although I think we will be extremely close.

One thing that helped, never quit shopping for materials, suppliers, and subcontractors - many of our suppliers or subs are not what we turned in with our loan information (we had to have bids for all major work packages). For example, we found great tile on closeout for extremely low prices, and we agreed to take all remaining tile (bathroom floor tile for $.25/s.f., kitchen backsplash tile for <$.50/s.f., floor tile for other areas for $.65/s.f., all in the $4-$6 price range before closeout - whatever we don't use goes to Habitat for Humanity for a tax deduction).


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/3/2007

As someone who has been on site during many pour operations using several different brands of block, I might be inclined to disagree with this statement.  Some of the blocks are much more stout when it comes to dropping concrete at 150 pcf down into a wall 12' high from the top.

However once the wall is installed, they are all basically the same.  You have a concrete wall, you have rebar, you have insulation on both sides.  I would also recommend extensive bracing, but bracing itself has a cost both in terms of rental and time.

For a subcontract job, select your ICF based on what your subcontractor likes to use.  For a DIY job, select your ICF based on the service after the sale, bracing rental cost, strength of the ICF, and overall cost.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/3/2007

I agree with many of your positive and negative experiences, however I would add a couple of my own.

1) For me, ICF was actually cheaper than sticks. However, lumber prices are down based on what I paid, concrete is up, and steel is roughly the same. I would assume that ICF prices themselves have increased as well.

2) As to lower insurance costs, I asked my agent about this. He explained that I qualify at a lower rate, but then they surcharge the rate based on the cost to replace the house being higher for ICF than for traditional construction. I found insurance costs to be a wash.

3) Energy efficiency - this speaks for itself. My house is also passive solar, so my bills are not directly correlated to anyone else's, even with comparable-size houses.

4) Quiet and solid - there must be some monetary value here, although I wouldn't know how to compute it. Temperature swings, wind, outside weather, everything that affects "normal" construction is completely eliminated.

5) I found that the block stacks pretty quickly, it is bracing and aligning that takes time. On my house, a skilled crew of three could assemble an entire story in five hours; of course they spent the next four days setting up bracing, adjusting to ensure straight walls, plumbing the walls, building walk boards, etc. Compared to removable concrete forms, this is definitely slow. However we had no difficulties during the pour, no blowouts, no floating, no settling, nothing. I attribute this to heavy bracing and gluing every block.

6) I found the drywallers simply looked at the stuff and said "huh, what am I supposed to do with this?" However after I showed them how to find where to screw, and how much holding power a screw had, none of them upcharged me on their bid. My plumber had already worked with ICF; my electrician agreed to do it only after I told him I would cut all the channels for the wire (and once he realized how easy it was he bought his own router); my HVAC tech was familiar with ICF, my sheetrockers didn't care, siding again didn't matter. It took some hand-holding initially, however none of the trades had any difficulty. Your trim carpenter might not be too happy if you didn't consider where to nail your window trim, your baseboard trim, or your crown molding, since polystyrene doesn't have much holding capacity for a finish nail; but there are easy solutions here if you consider them prior to sheetrock.

7) I found that most siding installers don't bid ICF because siding will telegraph every imperfection. The only imperfections in one wall, we were able to trim with a rasp to get perfect. The walls are straight as a string, plumb, and true. The truss fabricator set a template based on the actual structure, I can tell you every angle, every length, based on his CAD rendering, and yes, they are true. Again it is all in the bracing. Brace it heavy and take your time to do it right - this is your single largest labor source for ICF walls.

8) If you sheetrock, wrap your windows. ICF is much nicer than traditional construction and the drywallers don't care and won't charge extra. If you like fully-cased window trim, you will pay extra for your finish carpenter's time and effort for the non-standard wall depth.

9) As far as cutting blocks, I would encourage anyone building with ICF to adjust your plan dimensions to reduce or completely eliminate the amount of blocks that need to be cut. Working with my architect, the plan dimensions almost completely eliminated any block cuts. This makes the ICF stacking go much faster.

If I were building again today, I would definitely consider ICF even at a cost premium based on the concrete. I talked to my ICF subcontractor, and he said he doesn't charge too much more than I paid because he has gone to weaker concrete (mine are all 4,000 psi, he now uses 3,000 psi, the IRC prescriptive tables are based on 2,500 psi) and has trimmed back his steel (I have horizontal steel every 16" o.c., IRC prescriptive tables require only three horizontals, and again with verticals we put in over double the amount of steel required). So given weaker concrete and less steel than I used, he says ICF is still cost effective with sticks (however not cheaper), but that is simply one data point.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 9/11/2007

Ben,

Any pricing estimates I have are well out of date and probably of very little relevance. Concrete prices are different, steel prices are different, labor prices are different; you will find that all construction commodities are somewhat volatile so estimates from three years back have very little comparison to reality today.

You need to find some local installers of ICF and talk to them. If you have some local distributors of ICF, they should be able to guide you toward some installers. I found the material prices to be somewhat constant among the different brands. Obviously the concrete price is fixed as the dimensions are all the same, however some blocks are easier to work with, some installers already have bracing (others rent it), pump prices are variable based on how often the installers need that service; this is where the variables come in. Price of form work (since you found a reseller for INSUL-DECK) is pretty much the cheapest part of the install, it only goes up from there.

If I were looking towards INSUL-DECK, I would take a hard look at SPEEDFLOOR. I think it is more versatile, probably easier to work with, you can get much longer unsupported spans (try working around columns your entire project, not much fun), and the installed price seems to be quite reasonable. However if you have no local installers, you will pay a premium for asking them to learn on your job. Honestly anyone who does flatwork could use either system, if they take the time to mind their details. If you are stuck on ICF forms for your floor work, check out AmDeck from Amvic, but then since I know my Amvic Distributor and used Amvic on my house perhaps I am biased? I am fairly impressed with AmDeck, although I would use SPEEDFLOOR on my next build (many years in the future, probably plenty of different options by then anyway).

Yes, there was some engineering work done on my house. However most of it followed the IRC2000 ICF schedules that were in enforced in my jurisdiction when I did my build, which are all based on the prescriptive method for ICF construction prior to code approval. Suspended concrete slabs do need engineering stamps in my jurisdiction.


Planning Phase  >  To all stucco home owners!!
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 7/30/2007

Are you interested in "real" 3-coat cementious based stucco?  Or are you interested in an Exterior Insulation Finish System (EIFS) that looks like stucco?  Most "stucco" around here is EIFS, but then I am not from Louisiana.


Construction Budgeting  >  Excavators
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/22/2006

I used the same excavator throughout my project, he did such a great job at a fair price for the initial excavation that I didn't see a need to change later.  A transit will level it just fine, it really doesn't matter what equipment they use as long as they undertand how to use it and use it properly.  A transit takes two people, a laser level takes only one, the transit is more accurate.

Have you looked at stay-in-place lineal foundation drains such as Certainteed form-a-drain type?  I didn't use it for my footing tile drains, but it seems to be widely used locally.  I installed drain pipe adjacent to my footings and installed them during backfill.  I had the excavator put a bed of crushed stone around the footings, installed the pipe, and had the excavator cover the pipes up to a level of a couple of feet with crushed stone.  I used a perforated sewer pipe, but you can also use a flexible plastic pipe that is probably more common.  I drained my foot tile drains to daylight, but I have a sloping lot with a walkout basement so the slope wasn't a problem. 


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/21/2006

In my locale, excavation is always an hourly charge.  The excavator I used was familiar with the area, and potential obstacles he might run in to.  He also gave me an estimate on how much time it would take him to do the job, which turned out quite accurate although his rate was hourly and not per job.

I wouldn't necessarily select the lowest hourly rate among excavators, and I doubt you find too much difference anyway.  I would select the excavator that has the right equipment for the job, including laser level equipment (your footing subcontractor will appreciate a level excavation).  My footing subcontractor commented that "typical" excavation will yield an elevation difference as much as 15" across the footprint, whereas my excavation was level within 2".  This didn't save me any money (footing subcontractors bid the job per linear foot), but sure made for a happier crew.  For even money, I'll take happy workers.


Missouri  >  SF cost of construction in KC
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/23/2006

Are you looking at GC cost or O-B cost? When I was shopping, I found that the going rate locally for entry level (house and lot) seemed to be about $100/s.f. I looked at some fairly-large houses at about the same s.f. cost; it seemed to be more in the level of detail than in the size (the local McMansions are built to the same level of detail as the entry-level housing).

My final price to O-B was very similar to this, including land. However I have upgrades throughout including custom design, larger footers, ICF construction with extra steel, five-zone HVAC, flash hot water, fiberglass windows, custom cabinetry throughout including bathrooms, R-50 roof insulation (code is R-30), upgraded rough wiring and plumbing (actually I upgraded almost everything you don't see), nice fixtures and lighting, nice grade of appliances (although not commercial), all hard-surface flooring on the main level (tile and bamboo), no sheet vinyl anywhere, etc. I got one bid on my house, and prior to all of the upgrades I wanted, we were well over $150/s.f. - at this point we quit asking and realized we would have to O-B if we wanted to get exactly what we wanted and still be able to pay for it. The insurance company confirmed this when they performed their own evaluation of what it would cost to replace it.


Financing  >  Be Careful
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/12/2005

Is this other people's experience getting construction draws as well?

Not for me.  I hold the checks.  I write the checks.  Gayla or I take the invoice to the bank, along with the check before I mail it.  The bank makes a copy of the invoice and the check.  I mail the check.  Done.  Whole process takes less than five minutes from the time I go in the door.  If the vice president is on the phone and can't get to me immediately, the president does this for me.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/18/2005

 

Baine,

Switch to decaf please.


Planning Phase  >  Anyone willing to look at my floorplan?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 12/11/2007

1)       That front entry is not the most welcoming feature of the house. Without a front elevation it is hard to tell how it is integrated. However perhaps remove that wall immediately to the right (by the formal living room) and it opens that space up considerably.

2)       Double doors from the garage into the house are nice for big items, but they are always troublesome on where to properly put your switches so think about which one you want for your primary.  Also look at the door interaction between your coat closet and how the door from the garage opens into the closet door – this is years of frustration living with this feature.

3)       I would reverse the door swing in the kitchen to your back patio. You will be coming from the kitchen, carrying your tray of steaks out to the BBQ to cook, and oops swinging in the wrong direction.

4)       Your kitchen is going to be a high traffic area, do you want this? All traffic coming in through the garage is routed directly through the kitchen, and you have to go through your kitchen to get from the living area to the guest bedroom.

5)       That Dining Room entry from the hallway or from the family room is kind of odd. I think I would eliminate the short wall between your family room and the hallway there, and use either a different floor or different ceiling treatment to delineate the space. This would open this space, however too big and you also have scale issues. My living room, family room, and dining room all come together like this, I used a lower ceiling height over the kitchen and it works very well to delineate the spaces.

6)       Around here, that would be a huge 3-car garage (generally a 2-car is 20x20, a 3-car is 30x20). You will appreciate the extra space of being able to store bikes, lawn mowers, etc. and still open your car doors. If you need an intermediate column for support, make sure it is in a usable space - nothing like having a column right where you park and want to open you car door ;-(.

7)       For your office, I would use a double door entry with glass doors, this would open up your entry a bit and still nicely enclose your office space. However understand that double-door entries are always inconvenient about light switches, so you need to understand you trade aesthetics with everyday livability.

8)       Those are pretty large bedrooms, at least for children’s rooms.

9)       That is a pretty big laundry room, is that a utility room too (furnace/air handler, hot water heater, electrical box)? I also like to think about venting by clothes dryer, you have no easy vent to the outside from the center of the house. You can vent your gas furnace and hot water heater through the roof, or you can vent them through the walls (direct vent). I like to think about my line sets for air conditioning, how far away is the compressor from the air handler?

10)   In the Master Bath, look closely at that door leading into the water closet and shower area. I would make the shower entrance through the main bath, which compromises your humidity control (but hey, big bath fans are relatively cheap), making the water closet a bit nicer. I would also give myself more room, you don’t have space to turn around and open that door, the way you have that door sized it won’t even open all the way without hitting the toilet.

11)   That coat closet in the hallway is a long way from the entrance, this will be inconvenient.

12)   I know the idea is that less corners equates to cheaper to build, but sometimes less corners looks like cheap too. Sometimes a corner or 45-degree wall can add a lot of architectural interest. Perhaps I took it to an extreme with 17 corners and two odd contours following the cul-de-sac I was building on, but I found that corners didn’t equate to increased cost (ICF was square footage bid, footing was linear foot bid, the surveyors took it in the shorts because they bid all houses the same price, etc.). I would try to add some architectural features to add visual interest. Again this is without seeing any elevations, so I have no idea what your exterior will look like.

13)   How high are the ceilings?


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/15/2008

1) Much better layout, those few changes will make the house much more liveable and have greatly improved the house.

 

2) Get the book Better Houses, Better Living.  You can get it from this website (cheaper than Amazon), at a minimum check it out from the library. This book is an amazing resource into factors you should consider in actually living with your house. There are so many things and small details (most of which add absolutely zero cost) affecting liveability that should be considered (and rarely are considered) in design. These small details are the things that will make you smile daily, at the same time these are probably details you don’t realize you are missing now. These are also the small details that once you live with them, you can never go back to tract housing.

 

3) Nice kitchen, is that the view you have to the back, if so sign me up for dish duty (and I hate doing dishes).  Is that two dishwashers you have there?

 

4) Think about how you intend to use those ovens.  I like to have a staging area for food prep for the ovens, as well as a staging area for food waiting to go in ovens (cookie sheets?) and a staging area for food coming out of the oven to cool.  The island might work (and is really the only thing that would), but the distance may be too far away to make it work really well.  At least think about how you use the oven, and make sure your new design will accommodate it.

 

5) In the kitchen to the patio, I would not change from inswing to outswing, I would change from left-hand to right-hand (or right-hand to left-hand, I can never remember which way to spec these and had to ask every time I ordered doors).  The door hinges should be on the opposite side, so the door opens towards the living room (and not towards the kitchen).

 

6) Think about your pantry to the left of your refrigerator, again it is nice to have a landing area as you are getting ingredients out to cook with.

 

7) Be careful with your thinking about pocket doors, into the study, these are framed into the wall and will compete with your desire for location of electrical switches. You can’t locate two things in one location (door and electrical wiring).

 

8) You have better defined your laundry room now, I understand better what you are trying to do. I still like to think about how that dryer vents to the outside, I don’t recall the code requirements as to length of the vent run and the number of corners, but you should find out during the design phase. I like to locate dryers on outside walls because nice short vent runs are far more efficient, and those vent runs need cleaning as they get filled up with lint (yes, even with your lint filter). They can lead to fires, hence the code requirements for length and corners. The question I had as to compressor/air handling was related to your air conditioning equipment and how you intend to distribute this throughout your house (and furnace). Your air conditioner has two large components, a compressor outdoors and an A-coil indoors, and these are connected with a lineset. I like to make sure that all components can be easily replaced later (air conditioners have lives much shorter than your house), although most replacements do not replace the lineset. Also when your HVAC installer delivers the unit, the compressor is precharged, but only precharged for a certain length lineset – not a big deal but longer linesets will increase your bid).

 

9) Master bath is much nicer. With the covered porch, I would perhaps consider a hot tub on the porch, if you think you may want this wire for it now. My thought for putting this comment while leading off with the master bath is that if you may want a hot tub at some point in the future, perhaps it would be nice to have an access from the master bath? I don’t know, but I might think about it. (and actually given your use for the guest bedroom, I would think about an exterior door to the back on that one too.)

 

10) I agree the coat closet is much more accessible.

 

11) Given the size of the house, the ceilings should be commensurately higher for scale. Be careful going too high as this ruins scale too. I don’t have a good eye for scale, but my architect sure did. Along with the scale issues, I would think about my interior doors. The most common door height is 6’-8”, and this works well with a “normal” 8’ ceiling height. I find them a little short for 9’ ceilings, and 7’ doors look great and are just big enough, but these are also customs and get very expensive quickly. However an 8’ door (standard size and relatively cheap) is simply too tall for 9’ ceilings. I find that 8’ doors look good with 10’ ceilings though. Normal front exterior doors are 36” wide, and I find a 3080 door to be a little off for front scale so I would see if you can order one 6” wider (42” front entry, 8’ tall).  For interior, I would worry less about the width of the doors, but do think about the heights relative to your ceiling.

 

12) Overall much better, you are definitely moving in the right direction.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/16/2008

If you think $300 is expensive for an 8' solid core door, ask them to price a 7' door for you. Yep, standard sizes help stay cheap. I ordered standard doors (from a wholesaler), but wanted satin nickel hinges instead of standard brass. Changing to custom (different hinges) increased the price over $100/door. Yet they were willing to sell me the hinges in a box for under $2/hinge, if I ordered them at the same time. So there you have it, $6-8/door (8' doors have four hinges, the 6'-8" doors have three) or $100+/door. I paid my finish carpenter to change the hinges, it only took a couple of minutes/door.

For interior doors, I would think about at least one wheelchair. I used mostly 36" doors (where I thought that I would want to go in a wheelchair), and then used 32" doors on the rest. Some idiot framed a 22" door on a small closet (and since I was the framer, I guess I might know who that idiot was) and that was a custom door too. 24" - no problem, 20" - no problem, 22" - problem.

Actually for some really good feedback, I would post this over at ths.gardenweb.com in the Building a New Home forum. I don't generally like that forum, but for floorplan critique they tend to be very good.


Building Phase  >  Bobcat worth the investment?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 5/11/2007

I would strongly consider it. While you will never save the price of a used skid-loader, at the end of the job you can sell your skid loader and recoup most of your investment. My truck is too small to haul one of these, so while I could rent one fairly close by, once I paid for delivery both ways it simply wasn't cost effective, so I always called one with an operator attached (people that use these all the time are much faster than me with a learning curve).

There are so many things you can do with these, many trades bring their own. However depending on what you DIY, they can be tremendously useful. If I had one on-site, I would have used it readily. The only time I actually had one for my use was when one of my subs was trying to sell his, so left me the keys to play since he thought I might buy it. Given the utility of these, I would probably think long and hard about getting my own prior to the next build job, and simply sell it at the end of the job. As long as you don't buy a brand new track drive skid-steer, you will probably recover almost every dime you have in it, and the utility is tremendous.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 8/9/2007

Thank you for sharing your experience, I always like when someone comes back and shares their experience. List price (without any options) on that tractor is just under $11K, I don't know what street price is. It certainly sounds like it has been a useful tool for you, I am curious how well the investment pays off in the end (how much money did you save throughout the life of your project). These things have endless utility on a construction site, I know I would buy one in a second for my next project.


Planning Phase  >  Rebar Question
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 11/21/2007

Marty,

Good question, I don't think I have seen anything similar asked here before. For rebar smaller than #8, the number signifies the diameter of the rebar. To illustrate this, a #4 bar is 4/8" diameter, or 1/2" diameter, a #5 bar would be 5/8" diameter, a #6 would be 6/8" diameter, and so on. Once you get larger than #8, there is a different sizing rule.

Exactly what are you hoping the rebar in your footings is accomplishing for you? Your footings are poured directly on a bearing surface, your walls are poured on your footings, so technically you will never have any concrete in your footings in tension (for a typical footing, which I am assuming you have please clarify if you do not). The intent of your footings is to take your roof and floor loads (including dead, live, snow, and wind loads), and spread these loads over a sufficient amount bearing surface.

Have you done any geotechnical testing to determine the size your footings should be? I poured my footings oversize (at least 24" wide, 13-15" thick to ensure a nice level footing) because it was cheap insurance, but I also used only two #4 because the steel really doesn't do much for you here.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 11/21/2007

Good point on the beam on nonhomogeneous bearing surface. However this is not a typical scenario, at least in my area. A geotech investigation would show when and where that might be necessary.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 11/21/2007

Using the basic pi-r-squared forumla to figure a cross section of rebar, a #5 rebar will give you over 50% more steel in the wall.  Rebar in tension has a strength of about 35,000 lbs per square inch. However the location of the steel is critical to overall wall strength.

In Jon's drawing, it shows both pieces of rebar at the center of the footing at different heights looking at the footing down from the top. When I poured my footing, I put the rebar closer to the edges of the footing looking from the top down.  In the horizontal dimension, my rebar was about 3-4" above the bearing surface (maybe not quite that high), so it would be in the bottom-third of my footing. Generally you want the steel at the bottom of a reinforced concrete beam for strength, however if your intention is to reduce shrinkage cracking you might put it in a different location.

The bond, at least in part, is due to the deformed nature of rebar. If you tried to use smooth steel of equal diameter in place of rebar, it would contribute very little strength.

I also agree that codes are minimums, and you can substantially increase quality with little additional investment, and unless you are trying to maximize your profit from spec building is really a waste to not take advantage of this opportunity. You get to a point of diminishing returns though too. And just using better materials is really secondary to better installation. Here is a link to a very detailed build, there is a lot to learn at this site - imageevent.com/okoboji_images/deloreshouse.


Construction Bargain Strategies  >  How do I get a great deal on trusses?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/7/2005

There is probably more than one truss fabricator in your area. Set the radius fairly large (on the order of 100 miles or more) when you look for trusses. I found that the local suppliers were willing to go up to or exceed 100 miles of distance in free delivery. My trusses came over 100 miles, not a big deal until you consider that they had to send a replacement - this is expensive for them to absorb this delivery charge for one truss.

Be careful that the trusses will work for your application. For my floor trusses for example, I had several designers that didn't pay attention to my instructions about keeping the floor trusses perpendicular to the wall (the USP connectors I used wouldn't allow any other configuration). Also for roof trusses, they will be able to show you a 3-D rendition of what your house will look like, this is important because it allows you to see any obvious mistakes in the plans that are not readily apparent on paper (once again, this is from experience).

Try to find a truss fabricator that sets their own templates - this way they take the measurements. They will try to get your framer to take the measurements, that way if they are wrong they can place the blame on the framer. The framer will want to blame the truss designer, so they would rather have the designer take the measurements. Absolutely do not order from drawings without field verification of the measurements, or you are almost guaranteed they will not work without adjustment.

Even with some difficulty (some floor trusses required field repair, one required replacement, some roof trusses improperly pitched and needed scabs), I definitely recommend trusses and would use them again.


Legal Issues  >  Owner-Builder Insurance help needed!
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 10/5/2004

I considered hiring a GC as project consultant as well. One thing that really struck home was that I could then purchase builder's risk insurance through him at a considerably better price than I could get on the street. In the end, I decided that the project consultant agreement just wasn't going to work for me. I purchased builder's risk insurance through Farmer's Insurance Group.


Finding Subcontractors  >  Finding Plumbers in Houston
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 6/16/2009

I'm going to agree with Rachal here. I watched my plumber do PEX, he used my tools (he had the tools for Wirsbo, I used Vanguard, different connection types, he borrowed my monster hole saw). It took him about one day to run the PEX, and another to have a helper staple it up so it didn't move around. That was it. Using the go/no-go gauge we didn't have one failure. Next time, I do my own PEX plumbing. Drain, Waste, Vent (DWV), I will still use the pro next time.

As to using a carpenter, in my locale, plumbers, electricians, and HVAC all have to be licensed for their trade. However, you can work on any portion of your house you wish. Using an unlicensed trade to do licensed trade work is strictly forbidden.


House Features  >  Spacejoist
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 7/12/2005

One of the local ICF builders used to use Dietrich, but has since switched to wood.  The change was for several reasons, steel cost being one of them.  The other reason is the houses simply felt a little too industrial, and he just couldn't shake that feeling.

When I got my bids back last year, I found the Dietrich trade-ready floor system over double the price of a wood truss system.  I was willing to pay a premium for steel, I just couldn't eat that much.

There are several downsides with steel, mostly relating to how other subcontractors look at the material.  Residential subcontractors (at least around here) are simply not familiar with steel, so they look at it real funny and charge you a premium for their services to account for uncertainty.


Construction Bargain Strategies  >  Panelized vs Stick-Built
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 11/16/2005

Danielle,

Welcome to the site. There is a way to get in direct contact with registered users in your area, and is perhaps more appropriate for the type of regional one-on-one exchange you are looking for. In the upper right hand corner of this screen, there is an icon titled "Owner-Builder Connections" that will allow you to send messages directly to individuals in your geographic area. If you are looking for region specific information, subcontractors, references, etc. it is much easier to do this.

Ken


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 5/19/2006

Lets try to keep the advertising off the forum.  If you want to contact a person directly, please use O-B Connections and take it off-line.  The purpose of the forum is a discussion of the merits of panelized framing, and I don't mind professionals and panelized companies providing input, as long as you acknowledge your affiliation.  However if your post is pure advertising, or I view it as pure advertising, it will be deleted.

If you have any questions, PM me directly.  Thank you for your support, and for contributing valid information to this forum.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 7/21/2006

Larry,

As moderator of this forum, I certainly have no objection to vendors as they bring a valuable experience perspective that controbutes greatly to the forum.  Also you are up-front about your affiliation, and I appreciate that as well as I am sure there are other people associated with vendors that do not disclose their affilitation.

However the forum is not for advertising.  I will not delete your message, but it is getting close to crossing the line between sharing information and perspectives and advertising your company.

Thank you for your consideration.


Shopping Techniques  >  Confused by windows!
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 5/19/2006

1%-1.5% seems a very low budget for windows. As a reference point, I spent 3% for nice fiberglass windows. Andersen would have cost me more (although the windows I purchased are now more expensive than Andersen). Around here, Andersen 200 are base windows, anything less is simply junk and will be reflected in resale (and Andersen 200 are builder's grade too). My windows are nicer, but the brand is unknown around here and has no "quality" name recognition. If you are looking to resell in the near future (upgrade path), there is value in using at least the standard window in your market.


Miscellaneous  >  It looks like ART has gone out of business!
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 8/11/2007

Geothermaldiy.com, speedfloorusa.com, same physical address.


Green Building  >  AAC, ICF, and CMU, oh my!
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 8/1/2007

If your cost delta between option #1 and option #2 is only 2%, that decision just became a no-brainer as ICF is far superior to stick-frame construction.

BTW did you recently send me a message through O-B Connections? There is another Jon locally, I think I may have confused you two. My response is relevant, there are just some parts I assumed you were local to me, when clearly you are not.

Rather than an ERV or HRV, I am going to dump this conventional wisdom and recommend that most people would do better with a ventilating dehumidifier such as the Aprilaire or the Thermastor Ultra-Aire APD. There is very little return on investment to an ERV or HRV. However I do agree that you need ventilation, and I also believe that in most environments when you build tight you also need dehumidification. The ventilating dehumidifiers fill both needs, the ERVs and HRVs only fill one, albeit with energy recovery as a bonus.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 8/10/2007

HRVs exhaust air, if that air has moisture then HRVs exhaust moisture. However what is that air being replaced with, hot humid outside air in the summertime. The beauty with the ventilating dehumidifiers is that this hot humid outside air is dehumidified before it comes into your house, which an HRV does not do. An ERV does to some extent, but nothing controls humidity better than a dehumidifier or air conditioner. When you don't need cooling, the dehumidifier is necessary. When I thought you were local (in my response), the ventilating dehumidifier is the correct answer. In your locale, perhaps it is not necessary.

Around here the installers also recommend connecting your exhaust to your bathrooms. Be very careful with this install, as it doesn't have adequate airflow to meet code in my jurisdiction. So even with this install you still need exhaust fans, didn't really save you much on install now did it?

I'll tell you how I drew the line on energy efficiency vs. building the box. My thought is if it is relatively easy to add at a later date, with minimal cost increase, then I left it out. Can you upgrade your 2x4 walls later? Clearly the answer is no. However on my AC, how easy is it to upgrade to a more efficient unit at a later date? Clearly very easy, I  buy a new compressor, perhaps a new a-coil, it is all very accessible (even my line set is easily replaced), HVAC units are routinely replaced and upgraded as they reach the end of their service life. My trade off, I would rather spend more for ICF (which was a cost savings for me, even more no-brainer) and less for AC, because AC can be easily upgraded later.

I would consider leaving out the HRV/ERV and see what cost that gives you. If I build concrete, I would put the vent through the walls, put the makeup air through the walls, perhaps run the ductwork if it is not accessible later, install a $15 scuttle valve on the makeup side, foam the exhaust side, and call it a day. It is easy to install later, if you deem it necessary and you just saved the $1,700 cost of an ERV/HRV. I also left out a five-zone controller (my HVAC is ducted with five distinct zones) although I had the electrician run thermostat wire to each individual zone so it can be added later. What I found was I adjust the zones manually one way for heat, another way for cooling, and don't adjust at all other than twice/year. Chaching, that saved me $1,200 install, and if I determine I need it later my HVAC tech is happy to come install it.

You are correct in that you have to look at this as an investment, with reasonable rates of return. As you get more and more efficient, the incremental costs for additional efficiency get larger and larger, and the incremental savings get smaller and smaller. When I had a mechanical engineer run my numbers based on life cycle cost, he found that the less efficient units had lower life cycle costs because of less complexity, less cost of maintenance, less cost of repairs. Essentially I would save money every month on my utility bills, but I would more than offset that cost on my maintenance and repair bills. That doesn't sound like a good investment to me? OTOH, ICF pays you back regardless of the HVAC you end up installing.

Again let me reiterate, upgrade now what cannot be upgraded later. Trying to retrofit radiant heat is obviously not an option, so you have to install that during construction. Trying to retrofit ICF also not an option, so seriously consider it now (I am a huge supporter of this stuff). Putting the 20 SEER two-stage air conditioner, this is a box that is easy to replace so I would use a less efficient unit to save money. HRV/ERV, also just a box (make sure you have the ductwork though, the ductwork is the cheapest part of the install, yet the most expensive part of the retrofit if it is not there) so easily deleted and added later. Build the box right first, you can fine-tune your energy efficiency later. Build the box wrong, and you will never have energy efficiency regardless of the efficiency of the appliances you install. If it can be easily upgraded later, figure what your rate of return if for the additional investment and make an informed decision based on that.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 8/30/2007

Don't assume that just because I don't have an ERV or HRV providing my exhaust that I don't have exhaust elsewhere in the house. IMHO, houses generally have sufficient exhaust. Do you have bathroom exhaust, clothes dryer, laundry room exhaust, hot water heater flue (actually mine is closed combustion, so a two-pipe system just like the 90+ furnaces), kitchen ventilation? All of these methods allow you to exhaust air (and any of them can be set up on timers), and they all also throw your ERV or HRV out of balance as well because as I understand them, ERVs or HRVs exchange air, they don't makeup air lost through these exhaust channels. Yes I know that some ERVs/HRVs are made to exhaust from these locations constantly, but I find the relatively low flow of an ERV/HRV insufficient to remove the bathroom humidity while I am showering (OTOH install a builder's grade fan and that is insufficient as well). And in the kitchen, I have 500 cfm and I would like a bit more exhaust power, and this is far beyond the largest ERV/HRV I have seen.

Yes I run positive pressure. It gives you much better control over indoor air quality than negative pressure. Look closely at your inswing doors and think about it, they will seal better under positive pressure and not allow infiltration (they are being pressed against the seals, under negative pressure they are being sucked away from the seals and will allow uncontrolled infiltration). Think about your double-hung windows, they will also seal better under positive pressure and again allow uncontrolled infiltration under negative pressure. Buy and maintain good doors and windows, and you can minimize this. But why fight negative pressure when positive pressure allows you to win?

I am with you on cooling through hydronic. The dehumidification I can address, eliminating the sweating problem. However cooling your floor isn't the most efficient way to cool your house, if you installed hydronic ceiling panels it would be far more efficient, but then you just doubled the cost of your installation, not quite fitting within my furnace/AC forced air system where one set of ductwork handles both chores. For unbalanced uses, I could deal with inefficiency in one side at the expense of efficiency on the main use, but I have relatively balanced heating and cooling loads.

I do know one person running hydronic cooling, pipes run up near the ceiling in a tray, and he is using an Arkla natural gas powered water chiller (search Arkla, Arkla doesn't exactly exist any longer). The pipes sweating are actually his dehumidification system, this water is collected in the trays and drained just like your typical A-coil in a normal system. He has been running this system for 30+ years, and claims extraordinary efficiency (and I have seen his bills) and comfort has never been a problem when I have been at his house. Problem is the enormous complexity of the system, it was installed and maintained by the same person the entire time it has been in operation, but this person recently retired and took all of hiw knowledge with him. I have never seen another installation like this, you can imagine finding a new person to service it is challenging at best. To his credit, he hired an engineer to draw up a set of as-built drawings so at least he has a set of engineering drawings showing how it all works and ties together, making it easier to service (and interestingly while doing this found that one of his valves had been installed backwards for over 30 years). I know it can work, but that doesn't mean I understand how it works or can design a new system with it working.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 8/19/2007

I bucked conventional wisdom, and didn't install an ERV or HRV. Personally I think they are the wrong answer for ventilation, as while they do recover energy they are very expensive units to start with, you have to recover a lot of energy to make these cost effective. I was interested in two things, ventilation and dehumidification. That said, I had a study on controlling humidity in the hot, humid south. Interestingly, the ERV was the worst performer for controlling humidity, although people that had the ERV also rated their satisfaction the highest (something along the lines of if I paid that much for it, it must work?).

I can keep my humidity at a nice constant 40% year round (I can actually keep it less, but 40% is nice). My concern was that for a couple of weeks/year (which just happens to be now) we get daytime temperatures over 100-degrees (not a problem though, the A/C removes serious humidity in these conditions) and nighttime temperatures drop to the low 80s with 100% humidity. Now at an outside temperature of 80 F, exactly how much time is your AC operating? In my old house, you would wake up cool and clammy, really unpleasant. However in my current house, you wake up at a nice dry 40% relative humidity, very nice.

Now then, these need the same amount of ductwork as your ERV/HRV (OK no exhaust, but you might install it now in case you decide you want to switch later), and the installed cost is slightly less as long as you use the Aprilaire (the Thermastor is much nicer, but also about twice the price, I made the decision that it wasn't worth the premium).

If I were only using AC one month/year, I would install ductwork now, install some pretty serious thermal mass to to see if I could keep my flywheel stable, and install dehumidification. I have also wondered about using your hydronic system with cold water (not ideal, but for one month/year perhaps passable). I am with you on hydronic, my next house will definitely have it. However paying for two separate, redundant systems made hydronic an expense I cut out on this build. I don't regret it, I know we will be building again and I will include it then.


Missouri  >  2006 KC Area Home Show March 23-26
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/15/2006

I would recommend bringing more copies of plans.  When I went in 2004, I handed out three full-size prints, and probably 35 sets of minis. 

For your windows, provide your window schedule to every person at the booth.  For example, Andersen doesn't use factory reps to man their booth, the reps are all local suppliers that carry Andersen Windows, and outside of the Home Show they are competitors.  So if you are interested in Andersen Windows, make sure you give a copy of your window schedule to every rep, and make sure the other reps see you are shopping them.  Their pencils get a little bit sharper when they know who the competition is.  This won't work with the Loewen windows, as their distributors have exclusive distribution areas.

I agree, this show is invaluable to local O-Bs.  You will never have more potential contacts and local suppliers in one place again this year.  For time invested, this was some of the highest return on investment during my planning process.  Have fun, stop by the Carter-Waters booth (local Amvic ICF Distributor) and you will see my house on their display.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/25/2006

So did you go?  What did you think?  I went yesterday, I must say I was a bit disappointed compared to recent years.  However I had little incentive and not a clear mission, so perhaps my memory is a bit clouded compared to how it was in the past.

I noticed there were a couple of fiberglass window manufacturers that hadn't been there in the past (fibertec was one, I don't recall the other), although comfortline and Accurate Dorwin were there in the past and not this year.  Two SIP manufacturers this year (Premier has always been there, the other was new).  However there were less icynene installers, although one bio-based installer and the prices seem to have come down on spray foam insulation.  Less ICF involvement, this is probably reflective of installed prices.

It was still the best single place for contacts with distributors and potential subcontractors at any one point in Kansas City area and well worth the discounted $7 ticket price.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/27/2006

I just sent you an O-B Connection message.


Green Building  >  PV install, mounting, etc
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 10/14/2009

I would go over to Solar Professional magazine and subscribe. This magazine is heavy on advertising and light on content, but because it is so heavy on advertising (all of which with internet presence) it is actually a pretty good starting point for learning about different mounting systems.

Is your roof standing seam steel? If so the answer is pretty easy, especially if the mounting is close to the same slope as your roof. However, standing seam isn't the only steel roof out there. Flashing any roof penetrations is the most difficult aspect of this type of mounting.


Finding Subcontractors  >  Accountability Channel
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/28/2006

I agree with Richard here, although the plans and specs need to go beyond simply HVAC to include the other trades.

Just a simple example, my next-door neighbor is getting ready to close on his house later this week (almost done), and he just realized he has no phone lines.  While phone placement would not normally be included in the plans, basic electrical specs and scope-of-work should have included that the electrician runs the low-voltage (phone and/or cable), otherwise they will leave this out of their bid.  Since he has no phone lines, I would guess he has a minimally code-compliant install (and since this is basically a spec house, probably a good assumption).  Your electrician needs to know what type of light fixtures you are using, where you want them, where you want ceiling fans, that you want a pathway of light, kitchen appliances, laundry appliances, special electronic gear such as an entertainment system, outside lighting, security lighting, etc.  All of this is above-and-beyond basic code minimums, which is what you will get bid without any specifications or understanding of exactly what it is you are looking for. 

The same thing goes for the plumber.  What are you using for your furnace, hot water heater, dryer, cooktop, and oven?  If you don't specify gas, and how many BTUs these appliances have, don't expect that you will get gas lines in your low bid.  Does your house use one of those fancy new Roman Tub faucets that flow at 16 gallons/minute, if so you better have the pipe to supply this faucet and you won't get it unless you specify this somewhere.

There is no trade exempt from this.  Does your roofer know what underlayment, ice and water shield, shingles, and roof vents you expect - if not you are going to get 15-lb felt and 3-tab shingles.  Does your concrete flatwork subcontractor know what you expect for slab thickness and reinforcement?  Does your tile installer know you want a thinset install on top of a decoupling membrane, and not mastic?

The same way Richard identifies that if you don't adequately plan your HVAC you will end up getting burnt applies to all of the trades.  Provide plans without specs, and the low bidder will leave out everything beyond basic code compliance.  When you make your decision based on price point alone, that is all you are going to get.  When you make changes realizing you didn't get what you wanted and/or needed, you will pay extra for the change orders, probably more than you would if you selected a higher bid that told you how to do the job correctly and wouldn't put their name on a minimally code compliant job.  With electrical and/or plumbing, it is usually easier to make changes to fix your problems, but with HVAC and concrete flatwork wholesale changes are extremely difficult.  If you provide a level playing field, at least all the trades know your expectations and can provide the price it takes to meet them.


Green Building  >  SIP home advice/tips?
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/13/2008

You are trying to compare apples to oranges to grapefruit, and your comparisons are not valid. You are trying to compare $40/s.f. to $6/s.f. to $10/s.f. to $20/s.f. to who knows what all other figures have been tossed in here. Can we agree on at least one thing - you pay for your panels by square foot of panel, and you pay for your installation also probably by square foot of panel.

Dale is quoting without installation, materials only and he has indicated that so he has valid figures to compare to. Please when quoting, indicate how many square feet of panels, and whether this includes installation. This way we can make valid comparisons as to "reasonableness" of cost as well as comparisons with other materials such as stick-framing or ICF.


Construction Bargain Strategies  >  ICF Second Story Wall Issue
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/15/2006

I have stayed out of this thread for a bit here, but as someone who actually has an ICF house, and probably understands fairly well how it might work as a system, I will enter in now.

ICF are not R-50 - this is absolutely correct. I believe the greatest benefit to ICF construction is not absolute R-value walls, but is a tight envelope with minimal infiltration. The equivalent to R-50 is necessary to get HVAC models to work correctly to size your A/C properly. In the Manual J, you put in R-50 walls, reduce the infiltration to the lowest possible level (about 1/100 of well-built), and it will still oversize your equipment. ICF marketing representatives have simply capitalized on this factor, doing the math you will never get to an R-50 value.

The other support for this statement (equivalent to R-50) comes from the thermal mass (although it is insulated, there is still a thermal mass effect, we discuss this a bit on the Green Building forum and John from Colorado has some real temperature data to support this) and that ICF walls in the real world never truly reach equilibrium as is necessary for a "laboratory" analysis (stick walls reach equilibrium quite quickly in comparison).

If you understand heat loss, you also understand that you get far more heat loss through your penetrations (what is the R-value of your double-pane window?, what about your 1-1/2" thick door?) and your roof, and there are not too many ICF roofs out there. Well-constructed SIP will give you the same level of infiltration as ICF, which is far superior to well-built stick-frame construction. However it won't give you the thermal mass benefits. SIP was my second choice, I chose ICF because of availability of local expertise from ICF contractors (I don't know anyone out here building SIPs, I can point to entire subdivisions built ICF).

It is common in ICF construction that the second floor exterior walls line up with the first floor walls, so that ICF walls are always bearing on concrete. However there is no such requirement to do this. If you notice on this house - eehomebuilders.com the second story walls do not line up directly over the first story. Specifically, in the third picture down on the left column, you will see that the concrete wall is suspended and not bearing over the first floor wall, and also not directly bearing on the footer. Suspended ICF can be done, the calculations are simply that that portion of the wall act as a beam. Don't try it without an engineer's stamp though. Although I have no affiliation with Dean (it is his house), I should identify that I used Dean as my ICF subcontractor.

As to interior ICF construction, I wouldn't necessarily discount it. What is the cost of a stick-framed wall in your locale? What about an ICF wall? When I priced my house out, I found that installed price for ICF was cheaper than installed price for just 2x4 sticks, not even counting vapor barrier, insulation, and housewrap. So while you may not typically use ICF for an interior wall doesn't mean that it won't be cost effective to do so. Be sure to plan your penetrations well here though, as they become very critical for utilities, specifically HVAC duct runs.

If you want to use an alternative building technique, you select the technique first, and the house plan second. ICF is not suited to all plans, neither is SIP (just try to cost-effectively do a hip roof with dormers). If you have your heart set on a plan first, then you select the building technique that best meets that plan. This is why stick-built construction is so prevalent, as the versatility of site-built 2x4 walls is second to none. Personally I think sticks are overrated, but whatever plan you may choose will be easy to build with this method. Not all alternative building techniques are suited to all plans.

My recommendation is to choose the setting first, the building technique second, and design the house to incorporate the best of both. Anything else is an unecessary compromise.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/16/2006

When I filled my walls, concrete cost me $68-72/yard for 4K psi pump mix and a pump truck cost ~$150/hour. This was at the time lumber prices were also a peak - I track 7/16" OSB because Home Despot has it out front and I drive by daily. At the beginning of planning my project, OSB was <$10/sheet. When my lumber bids came in, this same OSB was >$20/sheet. My lumber bids were at the lumber peak price. I didn't notice this morning as I am done and I don't track any more. As a comparison, a light-gauge steel stud was <$2 when planning, yet this same piece was $7 when my steel bid came in, I didn't use any light-gauge steel. Another comparison is that #4 reinforcing was $0.10/linear foot when planning, yet I paid $0.35-0.37/linear foot - steel is still one of the cheapest pieces of the ICF wall.

The other part of the equation is one of labor costs. Labor costs for carpenters to stick-frame are higher than comparable labor costs to stack, brace, and fill ICF. If you are doing the work yourself, you compare material prices to material prices, and 2x4 sticks will almost always win out here. If you are subcontracting it out, you compare installed price to installed price, and this is where I found it cost beneficial to upgrade to ICF. Due to installed price on framed walls, I did all of my own interior framing at a considerable cost savings. I would agree that I paid less for a square foot of framed wall than I did for a square foot of ICF wall, but this isn't a fair comparison because I provided all labor for the framing, and none for the ICF.

For me, ICF was a cost savings. My garage is ICF construction, not because I heat it, nor because I need the strength, nor any other fathomable reason except that an installed concrete wall was cheaper than an installed wood wall.

There is one local custom builder that uses either ICF, wood, or steel depending on which is more cost effective (read more profit) for him (not like his customers understand the difference, it surprises me how many seven figure houses use 2x4 sticks and fiberglass insulation). He uses his own crews so he can switch back and forth at will, and sometimes does so in the middle of a build (I saw one of his houses with ICF exterior walls, steel interior walls, and 2x4 stick garage). At the time I was planning my house, he was using ICF with steel interior walls as he said his cost for any given house plan was cheaper to use ICF and steel than sticks. When I built my house, he was using ICF exterior and wood interior, again a reflection of his cost basis. Last house of his I looked at (which is several months back), he was using sticks with no ICF or steel on site, again a reflection of his installed price. As he has a very good grasp of installed costs, this is reflective of his opportunity for maximum profit.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/17/2006

I would talk to your SIP suppliers on the best way to do this. I don't have any experience with SIP, I have never seen a SIP structure under construction, all I know is what I have read and what I can think through myself. You can do complicated roof designs with SIPs, it simply isn't an efficient use of the material and if you are not using the material efficiently, it usually isn't cost effective either.

If you had to aplogize for the long posts, I would have to put an apology on almost every post I make ;-).


Building Phase  >  ICF's and Cultured Stone
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 10/24/2007

greenbuildingtalk.com, search on the ICF forum.


Planning Phase  >  Best Toilets, Let's Rank Them
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 10/23/2007

If you get the Toto, be sure to get the G-Max flush units (Toto has some lower lines as well).  I have three of them, have installed several others for other people, and personally for my time wouldn't install anything less. Everyone I know with Toto G-max units (mostly the Drakes) think they are fantastic.


House Features  >  Living (and Loving?) Concrete Floors
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 9/30/2009

David identifies some "real" issues related to concrete floors. I was all set on this, until I spent some time standing and working on a concrete floor. At the end of the day my legs didn't like me, and I am not THAT old. At that point, it was clear, no concrete floors in my house.

However as I am living in my house, how much am I standing/working vs. how much am I sitting down? I think the "right" answer is something in the middle. Certainly the kitchen needs a floor with some shock absorption to it. But maybe not all rooms need this. And maybe you can accomplish this with gel mats in front of the cooktop and sink and that's all you need?

A friend of mine has hydronic in his concrete floors, throughout his house. I don't think he would do it any other way. He is older than I, but then older doesn't mean his genetics (knees, etc.) aren't superior either. Something about heated floors really appeals to me, and the people that have them really seem to like them. Maybe they focus on one aspect vs. the whole package of concrete floors, but given the large body of anecdotal evidence I have a hard time dismissing it entirely.

I can tell you that hardwood throughout is nice, as I can hit this with a large dustmop in almost no time at all. This would be no different with a smooth concrete like you would use interior (broom concrete inside would be horrible finish). I find I use the dustmop several times/week, vs. the one time/week I would vacuum, so the economy of "easy" translates to more frequent, but also much less total investment time in cleaning, which is win-win.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 10/2/2009

I wouldn't completely rule out hydronic heat if not using concrete floors. Hydronic is easy with concrete floors, but hydronic can be applied to wood floors as well.


Construction Budgeting  >  Square Foot Cost vs. House Size
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 9/30/2009

Why limit your ICF to basement only?


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 10/1/2009

The thing about square foot costs is that there are simply too many variables for them to be accurate. Let's use a 2,500 s.f. house, this could be 50x50 perimeter, for a total wall perimeter of 200 linear feet. This same s.f. could also be accomplished by a 2,500x1 perimeter for a total wall perimeter of 5,002 linear feet. Clearly one configuration is much more costly per s.f. than the other configuration. Granted, these are both extremes in the model, but then an s.f. cost model deals with neither. This is why s.f. pricing estimates fail.

I wouldn't automatically assume that ICF prices are price-premium to wood walls, especially if you desire to upgrade those walls with icynene or bio-based insulation. And being in Minnesota, ICF offers many benefits that will be extremely difficult (and costly) to obtain with wood walls. Granted the price point worked for me, it might not work in every situation, but make no assumptions and let the numbers come in. ICF is most certainly an upgrade in quality, the cost premium might not be what you expect. And since you already are planning an ICF sub on site, you have already absorbed the mob./demob. costs so the premium of having them do more work might be quite reasonable. For me, the cost premium was actually negative (ICF wall was cheaper that wood framing). As to three stories (two stories and basement), reinforced concrete can easily accomodate much more than this.


Exterior Finishes  >  James Hardie Lap Siding
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/7/2006

I wanted fiber cement siding for the ease of maintenance.  Wood siding is maintenance intensive, vinyl siding looks like vinyl, T1-11 is pretty standard around here but is also maintenance intensive and doesn’t look that good, leaving stucco, EIFS, and fiber cement.  I wanted to DIY to save money on installed costs, and stucco and EIFS appear to be professional install type materials, leaving fiber cement.

 

I would caution anyone considering James Hardie's siding from going to the jameshardie.com website, as the selection available is simply not going to be available in your area.  For example, I wanted smooth lap siding (have you ever seen real wood siding, it doesn’t have wood grain does it?), and according to the website this is available in Smooth Lap in six sizes, Colonial Smooth in one size, and Beaded Smooth in one size.  Nice selection, however the selection in Kansas City is considerably limited compared to this.  Not only siding styles, but trim styles are also limited.  If you are interested in James Hardie siding, the first call you should make would be to some local installers to find out what styles are available locally, and make your decision based on that and not the website.

 

If you are interested in purchasing James Hardie siding, I would recommend a call to the local representative to find out who is the largest retail distributor in your area.  The reason for this recommendation is that I found the largest retail distributor was also both the lowest price and the best service, something not wasted on professionals that install the product.  The largest distributor in my area was also willing to take a truck to Omaha to get product not available from the local wholesalers, no extra charge and no minimum material order (Lowe's was willing to get material from the Oklahoma City wholesaler, but I had to purchase whole pallets, and no returns of excess materials).

 

I installed the siding myself. I have never installed siding, so this is definitely within the realm of DIY capability.  If you attempt this yourself, I recommend you get someone to help you, as the install goes much faster with two people than it does with one, and I imagine it would go about optimum with three people doing the installation.  Also there are some specialized tools for cutting the siding to keep the dust levels down; don’t scrimp and get the right tools.  This siding will telegraph any imperfections through to the finished siding, I installed this over ICF and this was a potential significant source of concern as ICF tends to move around if not properly braced (in fact the local installers all refused to install Hardie Lap over ICF walls and wouldn’t even come out to bid the project), although I found that my ICF walls were straight and there is no issue of telegraphing imperfections – although this is not a reflection of my installation but a reflection that my walls were very straight.

 

I subcontracted out the caulking and painting, but overall the siding looks great.  From other users, it should hold a coat of paint for about 15 years (wood siding around here is good for four years), and we put on two coats of premium exterior paint, thick.  I like the look of real wood lap siding, and this certainly meets this expectation.


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/15/2006

The Hardie Lap siding only gets caulked at the butt joints and vertical seams.  Caulking at horizontal seams will only cause trouble with water penetration.  This is no different than wood lap siding.

jameshardie.com/homeowner/installation are the installation instructions.  It shows only to caulk at the butt joints.  Some people (incorrectly) think that you should caulk the horizontal joints too - there are very limited applications where this is correct and in most applications this will only cause problems.

My painters did all of the caulking as part of their bids price (in my locale, painters caulk first).  They had no problems with it.  A good caulk should last longer than the paint, and for Hardie paint should last 15 years or so.


Financing  >  Looking for feedback on a financing scenario
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/10/2005

As silly as it sounds, I also found no discount for cash payments. In fact, I found just the opposite to be true. Most suppliers were willing to give me 2-10/net 30 or 2-15/net 30 terms (or even on my lumber supplier, 3% discount for quick payment), but would not give me a discount for cash. Go figure, I get to use their money for a 30-day term (about how long it takes for them to invoice me), and then they give me a discount if I pay within 10-15 days of invoice. However if I pay the day I order, I pay full price. For some suppliers (i.e. my plumbing supplier), my price is based on volume of business, and interestingly they keep track of this through their financing department. So even worse if I pay cash, the amount of my invoice doesn't get credited to my business account for future discounts.

Since I write the checks on my construction loan anyway (or more accurately, usually Gayla writes the checks), quick payment is not an issue as we don't have to wait for the bank.

While it is counterintuitive, around here there is absolutely no upside to paying cash and it is entirely beneficial through discounts and reduced future pricing to set up credit accounts with every supplier.


Exterior Finishes  >  Yakima Composite Deck
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/7/2006

I have a large deck, and was interested in decking material alternatives besides ACQ and cedar.  I wanted something that fit into the décor of the house better, and have always been drawn to composite decking material as a potential option, if I could fit it into my budget.  Regardless of the manufacturer’s literature, composite decking material is not maintenance free, and will never have a satisfactory return on investment to justify its use.  If you like the aesthetics, then it is a good material.  But if you are looking at the material from a life cycle cost analysis, it simply will never be cost effective.  That said, I like the appearance and wanted to fit it into my house, if I could justify the cost.

 

When I was looking, I found most composite deck material to be about $2.12/linear foot (lf) of nominal 6” wide material for the deck material itself.  Given a large deck, this was prohibitive option at this price.  I had already ordered bamboo flooring through www.builddirect.com, and was satisfied with the material and the transaction, so I called them about Yakima composite decking material (this was a new addition to their site).  The price they had listed was $1.07/lf, about 50% of street price in my area.  Shipping from Washington State was going to be expensive, but my delivered price was in the $1.4X/lf range, and suddenly this started to look like a viable option (still 3x the price of ACQ, a substantial premium).  At the time, I almost didn’t order it as a local supplier got a shipment of a previous year’s Weatherbest and was selling it for $1.74/lf, and I could get it locally and only purchase what I need (no waste) and with Yakima you have to purchase full pallets.  Still purchasing full pallets was more cost effective.

 

I liked Yakima because it faded to a color I preferred (all composite deck fades terribly, purchase a sample and put it in direct sunlight for a couple of weeks to make sure you like the faded color), had a hidden fastening system that appeared to be easy to use (more on this later, not as easy as it appears) and was cost effective, was thicker so should have more structure (Trex decks feel kind of spongy), and again was the only option I had if I wanted to upgrade to a composite deck within my price point.

 

The material was delivered promptly (kudos to www.builddirect.com, I used them twice with no difficulties either time and would recommend them as a supplier), and only two boards were damaged.  As a bonus, the pallet contained two more boards than they specified would be on the pallet, so basically a wash. 

 

Some downsides to Yakima (many apply to all composite materials):

1)      This stuff is flexible, you better account for it in your structure.  A piece of wood has structure, and screwing it onto your joists provides some lateral bracing of the joists.  Don’t expect composite to provide the same function.  While Yakima decking is more substantial than most, I would recommend better bracing of the joists than you would do for a wood decking material.

2)      It is not maintenance free.  It must be powerwashed, regularly.  The Yakima just gets dirty, and a grey deck shows all dirt.  I don’t think I will have problems with mildew like some of the other manufacturers, but I haven’t had it that long (approaching one year).  A different color might not show dirt as well.

3)      Composite is hot.  Like don’t walk on it barefoot hot.  Like you don’t even want to sit on it or entertain on it hot.  Summers are hot anyway, and a good time to be indoors.  In the wintertime, hot is good, and we are using our deck in January, something we previously wouldn’t do.

4)      This stuff has incredible expansion coefficient.  We found that unrestrained, simply based on a typical July day, a 16’ plank would expand by ¼” from morning until mid-day (a 30F difference in air temperature).  We put it down in July at over 100F, so we put no gaps end to end.  Account for the expansion during installation.  However the expansion doesn’t seem to be totally linear (it is 30F now, if it remained a consistent ¼”/30F, I would have lost another ½” and this isn’t the case).

5)      The Yakima uses a proprietary hidden fastener system that is not quite as easy to use as it appears.  The easiest way to get it to engage is with the heel of your boot or a rubber mallet.  However doing this will damage some of the clips, order extras as you will need them.  There is a learning curve here, you will damage fasteners.

6)      The Yakima hidden fastener system also doesn’t laterally restrain the boards.  This is good for the expansion coefficient; this is bad as the floor “floats” on the joists.  This allows for “gaps” as the boards shrink.  I don’t recall how other composite deck materials are fastened down, but IIRC they use a special screw to avoid the fasteners themselves from backing out during the frequent expansion/contraction.  In the wintertime, we found the Yakima can shrink enough that some of the planks will actually come off their bearing at the ends (compounded as the PT lumber dries and twists a bit), and you don’t want to step on these (a 2x2 screwed in at the top of the joist prevents this, and is highly recommended where this situation occurs.

7)      Yakima doesn’t have a matching railing, so you are on your own here.  When I called to talk to the manufacturer’s representative, he identified that most installers of this material use either plexiglas or cable rail systems, both well outside my price point (cable rail was going to cost me $90/lf – ouch).

 

Overall, I really like the look of composite deck material, so I am willing to live with some of its shortcomings.  The deck looks fantastic with the completely hidden fasteners, I like the color, we are able to use the deck in January.  I had to perform some unscheduled deck maintenance/modification from underneath, but I think I have that complete.  Right now (in February) it has some gaps, but these will not be present in the springtime as it heats up a bit.  My deck builder agreed to redeck next summer with wood deck material, since he was convinced I wouldn’t like it, but I don’t think I will take him up on his offer.  I am not sure I would purchase it again, and would consider some of the more exotic wood species such as IPE, but I am also not looking at replacing it anytime soon.


Exterior Finishes  >  Tamko Roofing Shingles
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/7/2006

I used Tamko Olde English Pewter 30-year Architectural Shingles on my house.

 

I selected Tamko based on aesthetics and because they are “almost” local (they are manufactured Joplin, Missouri). My roofing supplier carried GAF Timberline, Elk, Certainteed, Owens Corning, and other shingle providers, so I asked him point blank which brand was best. He said they are all basically the same, they are all priced the same, they are all manufactured using similar processes, they have the same warranty, so you should make a selection based on what you like to look at. I tried to push a bit harder, and asked what he had on his house – he has Elk, but only because he liked the look. I asked the installers in line, they agreed with the assessment but also identified that Tamko won’t seal as quickly in the cold.

 

I was also interested in 40-year and 50-year shingles, but my roofing supplier said that although they last longer, they won’t look very good, and you will want to replace them just based on aesthetics before they are completely worn out. He said unless there was a compelling reason (such as homeowners association requirements) to not waste the money on upgrading shingles. I also live in a locale where we get hailstorms, so new roofs courtesy of your insurance carrier are not unheard of.

 

With this information, I selected my shingles based on aesthetics alone. No other supplier had a color that I liked as much as Olde English Pewter. I did upgrade my underlayment to Tamko 43-lb felt underlayment, and Tamko Ice and Water Shield for the first two courses (standard is 15-lb. felt), and also upgraded my flashing – these upgrades are a relatively small price increase for a much better installation and potential for less water problems in the future. An interesting data point is that my shingles came out of the Dallas, TX factory, so much for my attempt to support of the “almost” local economy.

 

I installed my roofing materials myself; it is definitely within the capability of a DIY (I had never roofed before). However roofing is heavy labor, 43-lb felt is 86 lbs/roll, ice and water shield is 90-100 lbs/roll, the shingles themselves are about 80 lbs/bundle, and I had about 43 squares (130 bundles, not counting hip and ridge). Add up the weight, I moved it all by hand (rooftop delivery, so at least I didn’t have to haul it up on a ladder). Roofing is also hard on shoes (I destroyed a pair), clothes, gloves (one pair of leather gloves/day). Next time, I would pay for professional installation.

 

My shingles have been installed for over one year now, and I have had no problems with them (you wouldn’t expect any problems with any year old shingles). I would purchase them again.


Electrical and Lighting  >  Hunter Ceiling Fans
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/7/2006

I used Hunter ceiling fans exclusively throughout my house; one 52” Turin, one 60” Tribeca (model 28121), and two small Beacon Hill (model 20431).  Please don’t automatically associate a single brand with quality (as in the “old” Hunter oil-filled fans being high quality), as all fan manufacturers today are made in China and have various lines to meet different price points, so you simply cannot associate a single brand with quality.  Even “high” quality brands such as Casablanca make economy grade fans.

 

For two ceiling fans, I was interested in quality balanced with styling and price.  I wasn’t shopping on price point alone, as I wanted a quality fan that would operate quietly and move a sufficient amount of air, with price being a secondary.  For these, I shopped the motor quality first, and for a top quality fan you really want a performance grade stack motor such as a K55, unfortunately these are only in the highest price Casablanca and Emerson fans and therefore out of my price point.  So I went one step down on the motor quality scale, and found two Hunter fans that I liked the styling, the Turin and the Tribeca.

 

The two Beacon Hill fans get much less use and are much less visible, so for these I was interested mostly in a price point over styling and motor grade.  These are economy grade fans with smaller motors.  However I have no complaints with them, they operate quietly, and move a fair amount of air for a bargain priced fan.  I don’t know how long they will operate quietly, as they get little use and are still fairly new.

 

These were professionally installed by my electrician, and he had no difficulties.  I like the styling, the two main fans operate quietly at all speeds, are in balance, and move enough air to know they are working.  Although they weren’t my first choice (I really liked the Brushed Steel and Maple Emerson Odyssey with the K55 stack motor, but at almost $600/each I just couldn’t justify it at the time I was building), I would purchase these again.

 

If you are interested in buying Hunter fans, I found the best prices over the Internet.  However I also found a local lighting supplier that was willing to price match Internet prices, so shop around and don’t be afraid to ask for discounts.  I ordered mine online in the interest of time, but they were drop-shipped from the same warehouse my lighting supplier used so it didn’t get me any benefit (given equality between a local source and a remote source, I would always rather deal with a local source).


Planning Phase  >  Gutterless Home
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/31/2005

My old house had no gutters on it when I bought it (it was a historic craftsman-style). It had never had gutters on it, and I bought it from the owner that lived there 40 years. Apparently no problems. There was a diverter over the front porch so you could exit the house without getting hit with a load of rainwater.

Now my finance company (I was FHA due to low down payment) required that the seller install gutters prior to my purchase. I am not sure this contributed any value, as this was more of a maintenance issue than without gutters. If I didn't clean them, I had water problems. If I did clean them, I had too few downspouts that concentrated the flow too much in certain areas and I had maintenance problems. The A/C condensers were placed so the wash from the roof would clean them every rain, with gutters this wash was diverted and now I had to clean these as well. The house is in excess of 80 years old, with no indication of foundation problems or repairs. Grading was probably crucial, as were the larger overhangs, to get the water away from the house.

My house that I am currently building also has 2' overhangs. I would leave the gutters off if the code didn't require me to have them.


Plumbing  >  Gas-Tite Corrugated Gas Line
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/7/2006

Since I recognized the value of a home run style plumbing system, and all electrical systems are also home run style, I figured why not do the same for the gas appliances.  Gas-Tite is a corrugated stainless-steel gas line that is installed basically the same way as PEX.

 

Gas-Tite offers some distinct advantages:

1)      It is fast to run.  My plumber installed my entire natural gas system in a morning, ready for inspection the same day he started.  This was hot water heater, furnace, and gas dryer.

2)      Just like the other home-run style systems, I can turn the gas off at the manifold.

3)      There are only two fittings on each gas line, one at each end.

 

Gas-Tite also has some distinct disadvantages:

1)      Expensive.  The material is pricey!$!$  However installed price was no more than black iron pipe, and black pipe has a lot more fittings.  Combined with advantages above, since installed price is a wash or slight cost savings, I didn’t mind paying more for material.

2)      Since it is so expensive, you don’t want to purchase more than you need.  You need to measure your runs very well, as excess cut material can’t be returned.  However estimate too short, and you now have a very expensive cut coil that also isn’t worth anything.  Your material estimates are critical.

 

This was installed by my plumber.  I tend to think gas line is critical system, and not for the faint of heart, and almost always defer to professional installation.  However both the code inspector and the gas company leak tested it, so even if you decided to DIY there are some safety checks in the system.  Given how easy it was to run, it could be within the skill set of many DIYs, however again I always recommend professionals when dealing with natural gas or things that can kill you.  This was an unusual installation in my locale for new construction (most are black pipe), although my plumber routinely used it for retrofits.  I figure it isn’t used more because even though it was a cost savings, most GCs of production houses like to order their materials a bit tight, and underestimating the amount of Gas-Tite you need will always result in an expensive worthless coil of cut pipe, underestimating black iron pipe requires an extra trip to the plumbing supplier and a new stick of pipe, much less critical.


Plumbing  >  Vanguard Manabloc and Vanex PEX
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 2/7/2006

I was interested in a home-run style plumbing system for the ease of servicing fixtures (you can turn off any single fixture in the house from the manifold) and the consistent water pressure (if the washing machine comes on while you are showering, you won’t get scalded). While you can install any plumbing system (copper, CPVC, PEX) home-run style, you will notice that most other plumbing systems are not installed this way, and almost all PEX systems are. So this put me into a PEX market.

 

I selected Vanguard because they are made “almost” locally in McPherson, Kansas, and I like to support the local economy whenever possible (the other commonly available PEX in my market is Wirsbo). My ICF subcontractor had also installed Vanguard in his house, had done it himself, and highly recommended it. It has operated flawlessly, I have no complaints.

 

My system was installed by a plumber who typically used Wirsbo. The Vanguard Vanex PEX crimps differently, so I purchased a new set of crimpers (Wirsbo expands around the fittings, Vanex crimps from the outside). He had never installed a Vanguard Manabloc, but had no difficulty doing so. After assisting him, and performing my own finish plumbing, I am fairly certain that this could be a DIY level installation as the learning curve is pretty short.

 

The only downside I had was the ability to get parts. Although my local supply house could get any Vanguard products, they only stocked limited amounts of PEX materials and fittings (PEX is not widely used in my locale). They could get anything almost overnight, but sometimes you need to look at products on the shelf to figure out what you need instead of looking at a catalog. Also since they didn’t move much product, the people behind the counter simply didn’t have the expertise I needed. I ended up using their large store in a Kansas suburb, so my drive time to get parts and materials was considerably increased, leading to inconvenience.

 

If you are interested in Vanguard Manabloc and Vanex PEX, I found the best prices at my local (and their main store not quite locally) supply house (much better than internet prices). I would look at your unit costs on ½” and 3/8” PEX, as I found that by upgrading to all ½” PEX it was a cost savings as I was able to purchase in a larger quantity and qualify for better pricing. I would also look at where you fixtures are located, as I found I could upgrade to two separate manifolds (one located at each end of the house) to achieve less pressure drop and less cost. The only downside to ½” PEX is that some of the low draw fixtures take longer to flush the line with hot water, resulting in a delay of an extra second or two. If you have some fixtures that you wish to install recirculating pumps later, now is the time to put in some extra PEX runs to facilitate this. PEX is cheap and easy to run compared to any other material.


Building Phase  >  Outdoor Electric
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/1/2006

Here is probably one of the single largest challenges facing O-B, coordination between subcontractors.  Production GC's that build houses, and use the same subcontractors every time, the subs know what to expect when they show up.  If the siding person the electrician is used to working with normally provides boxes, the electrician expects this.  Hire a different siding subcontractor, and suddenly you get some rework,

I would say that the siding person normally puts in the boxes, as depending on what type of siding you want the electrical box in a certain place.  For example, if you are using horizontal lap siding, think about where you want the electrical box in relation to a piece of siding?  You want the electrical box in the center of a lap, so that the outside cover seals properly.  Now think about brick.  Now think about stone.  Now you realize that the location of the electrical box is more critical to the siding installer than to the electrician - imagine cutting a brick to go around an electrical box - your mason isn't going to like this.

Around here the electrician would typically run the wire, leave some excess, and leave the box loose so the siding subcontractor can install it.  I have also seen the electrician leave just the wire, so the siding subcontractor installs the box and pulls the piece of wire through into the box.  Either way works fine, like I said it is simply what has the electrician come to expect from previous jobs.  I left the wire loose myself, put on the siding, and then came back with an old work box to put the electrical outlet where it made sense. 

This is not different than the electrician leaving the wire pulled out of the wall in the kitchen at the approximate height of the over cabinet or under cabinet lighting, as until the cabinets are installed you don't know the exact height of these boxes.  You want the wire to come out of the sheetrock somewhere behind the cabinets, so that the hole will be covered up by the cabinet installer and the wire will get to the proper location.  Bathrooms are another example of where the boxes are not installed until later, because frequently the electrician doesn't know what mirror/vanity you will be using, or at what height (vanities range in height from about 30" to 34").  Another common example might be a floor electrical box, as the final location for this is dependent on furniture placement.  I have a floor box just hanging in the ceiling of my unfinished basement, waiting for me to figure out the best location to mount it.  There are many examples where the electrician doesn't mount the final boxes, I am providing several to show that it is not isolated to siding.

And no, mounting an electrical box the electrician left loose would not be considered "doing electrical work."  If the wire is already there, mounting a box in the proper location for your trade is also not "electrical work."


2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 3/1/2006

The point I was trying to illustrate with the brick mason is not the vertical cut he has to make on one brick, but if the electrical box is not at the correct height horizontally, he may have to cut four bricks in both a vertical and a horizontal dimension.  So instead of one simple cut, he now has four more complex cuts - more likely he will simply move the box to facilitate brick placement if the electrician already mounted it.  Alternatively if the electrician left the box loose or didn't provide it at all, the brick mason simply puts it at the most convenient place for him and is much happier because of this.


Miscellaneous  >  large tree stump close to a new foundation
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Editor

Kenneth's Forum Posts: 937
Interview Answers: 182
Average Forum Rating: 4.36



Randomly Selected Image

Log-in to vote!

By Kenneth in Lees Summit, MO on 1/31/2005

I would also put some extra steel in my footer at that point so it acts like a beam.  The excavator will have no trouble removing the stump.


Missouri  >  Lakepoint House, Prairie Lee Lake
2004, 2005, 2006, 2007, 2008, 2009, 2010 Merit Award Winner
Contributing Edit